Project Name: Construction of one floor vertical Extension (3rd Floor)


Project Phase: Finishing
Site Engineer: Md. Asraful Hoque
Weather Condition:

Manpower Allocation
Sr. No. Task Name: Masonry Carpentry Rebar Concrete
M H M H M H M H

1 Interior Wall Plastering 4 4 - - - - - -

2 Plaster Stripping & House-keeping - 1 - - - - - -


Groove Cutting & Electrical Concealed
3 Conduit Pipe laying in Brick Wall - - - - - - - -

4 - - - - - - - -

5 - - - - - - - -

6 - - - - - - - -

7 - - - - - - - -

8 - - - - - - - -

9 - - - - - - - -

10 - - - - - - - -
TOTAL MANPOWER COUNT: 4 5- - - - - -
#Special Instructions:

#Additional Notes:

Prepared By: Checked By:


UCEP GAZIPUR TVET INSTITUTE
North Salna, Gazipur.
Date: 4/12/2023
Shift: 8:00 AM-05:00 PM
*M= Mason
*H= Helper

r Allocation
Achievemets/
Electrical Plumbing Challenges/ Issues Upcoming Activities Comments
Progress
M H M H
Door Frame & MS Grill
- - - - Installation

- - - - Dismantling Work
Exterior Wall Plastering
1 1 - -

- - - - Water Supply & Sanitary

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
1 1 - -

Authorized By: