SL. Description of Items Specification Unit Qty. Rate Amount (Tk.) Remarks
(Tk.)
Exterior standard acrylic emulsion paint of
approved best quality and color having
water resisting properties and resistance
properties against fungi, fading & flaking
delivered from authorized local agent of
the manufacturer in a sealed container;
applying to exterior surface with surface
preparation including cleaning, drying,
making free from dirt, grease, wax,
removing all chalked and scaled materials,
fungus, mending good the surface defects
using sand paper and necessary
scaffolding; applying necessary exterior
sealer of specified brand on prepared
surface; then applying necessary exterior
putty of specified brand for levelling, spot
filling, crack filling and cutting by sand Exterior Surface
paper/zero water paper; finally applying 2 Renewal or
1 Exterior Wall Painting (2-Coats) coats of exterior emulsion paint spreading Sft 4385.00 26.50 116,202.50 Renovation for
by brush/roller/spray & necessary Existing 3-Story RCC
scaffolding etc. upto desired finishing, Building.
elapsing specified time for drying or
recoating; all complete in all floors and
accepted by the Engineer-in charge.

Interior standard acrylic emulsion paint


(plastic or matt finish) of approved best
quality and colour delivered from
authorized local agent of the
manufacturer in a sealed container;
applying to interior wall and ceiling with
surface preparation including cleaning
drying, making free from dirt, grease, wax,
removing all chalked and scaled materials,
fungus, mending good the surface defects Interior Surface
using sand paper and necessary Renewal or
2 Interior Wall & Ceiling Painting (2-Coats) scaffolding; applying necessary interior Sft 7300.00 25.00 182,500.00 Renovation for
sealer of specified brand on prepared Existing 3-Story RCC
surface; then applying necessary interior Building.
putty of specified brand for levelling, spot
filling, crack filling and cutting by sand
paper/zero water paper; finally applying 2
coats of interior emulsion paint spreading
by brush/roller/spray & necessary
scaffolding etc. upto desired finishing,
elapsing specified time for drying or
recoating; all complete in all floors and
accepted by the Engineer-incharge.

Total Amount (Tk.) 298,702.50


Tin-Shed-Exterior Paint
Sl. No. Description No. Length Height
1 127'-9" 10'-0"
1 132'-9" 10'-0"
1 Exterior Wall
1 28'-0" 10'-0"
1 20'-0" 10'-0"
Deduct
2 Window 17 4'-6" 5'-0"
Door 7 3'-0" 7'-0"
Sub-Total
Wastage-5%
Total

03 storied Building-Exterior Paint


Sl. No. Description No. Length Height
2 20'-2" 30'-0"
1 Exterior Wall
2 40'-2" 30'-0"
2 13'-0" 10'-0"
2 Store Room
2 10'-0" 10'-0"
1 7'-0" 10'-0"
3 Chillekotha
1 3'-6" 10'-0"
Deduct
17 4'-6" 5'-0"
4 Window
2 6'-0" 4'-0"
Door 1 3'-0" 7'-0"
Sunshade
T & B Face 34 7'-0" 1'-6"
5
Front Face 17 7'-0" 0-6"
Two Sides 34 1'-6" 0-6"
Sub-Total
Wastage-5%
Total

03 storied Building-Interior Wall & Ceiling Painting


Sl. No. Description No. Length Height
2 19'-0" 9'-6"
2 16'-10" 9'-6"
interior Wall
2 18'-6" 9'-6"
2 10'-10" 9'-6"
2 5'-4" 9'-6"
Washroom
2 3'-0" 9'-6"
2 13'-0" 9'-6"
Stair wall
2 7'-0" 9'-6"
GF TO 2 5'-4" 3'-0"
2ND
FLOOR
Ceiling
GF TO
2ND 1 19'-0" 16'-10"
FLOOR 1 18'-6" 10'-10"
Ceiling 1 7'-0" 3'-10"
2 9'-6" 3'-6"
2 9'-6" 1'-0"
2 9'-6" 1'-0"
Deduct
5 4'-6" 5'-0"
Window
1 6'-0" 4'-0"
Door 2 3'-2" 7'-0"
Sub-Total
SUB-TOTAL-(A)

03 storied Building-Interior Wall & Ceiling Painting


Sl. No. Description No. Length Height
2 13'-0" 10'-0"
Store Room
2 10'-0" 10'-0"
1 7'-0" 10'-0"
Chillekotha
1 3'-6" 10'-0"
ROOF
Deduct
2 4'-6" 5'-0"
Window
1 6'-0" 4'-0"
Door 1 3'-0" 7'-0"
SUB-TOTAL-(B)
TOTAL-(A+B)
Wastage-8%
TOTAL

Sl. Description unit Qty


1 Exterior Paint sft 7067.55
2 Interior Paint sft 7918.29

M.S. Angle Enamel Paint


Sl. No. Description No. Perimeter Height

1 M.S Angle Enamel Paint 60 0'-6" 3'-6"


Qty. Unit
1277.50 Sft
1327.50 Sft
280.00 Sft
200.00 Sft

382.5 sft
147 sft
2555.50 sft
127.775 sft
2683.28 sft

Qty. Unit
1210.00 Sft
2410.00 Sft
260.00 Sft
200.00 Sft
70.00 Sft
35.00 Sft

382.50 sft
48.00 sft
21.00 sft

357.00
59.50
25.50
4175.50 sft
208.775 sft
4384.28 sft

Qty. Unit
361.00 Sft
319.83 Sft
351.50 Sft
205.83 Sft
101.33 Sft
57.00 Sft
247.00 Sft
139.33 Sft
32.00 Sft
319.83 Sft
200.42 Sft
26.83 Sft
66.50 Sft
19.00 Sft
19.00 Sft
- -
112.50 Sft
24.00 Sft
44.33 Sft
2285.58 Sft
6856.75 Sft

Qty. Unit
260.00 Sft
200.00 Sft
70.00 Sft
35.00 Sft

45.00 sft
24.00 sft
21.00 sft
475.00 sft
7331.75 sft 475
586.54 sft 38
7918.29 sft 513

Qty. Unit

105.00 Sft
Material
Cost
Unit Price
Sl. Items Unit Quantity (Without
(Tk.)
VAT &
TAX)
Standard synthetic
1 enamal paint Liter 1.05 220.00 231.00
Oil based anticorrosive
2 primer Liter 0.86 160.72 138.38

3 Thinner Liter 0.63 130.00 81.90


4 Sand paper each 1.00 40.00 40.00
5 1'' Paint Brush each 2.00 35.00 70.00
561.28

Material
Cost
Unit Price
Sl. Items Unit Quantity (Without
(Tk.)
VAT &
TAX)
Acrylic emulsion paint
1 (plastic) Liter 1.05 220.00 231.00
Oil based anticorrosive
2 primer Liter 0.86 160.72 138.38

3 Thinner Liter 0.63 130.00 81.90


4 Sand paper each 1.00 40.00 40.00
5 1'' Paint Brush each 2.00 35.00 70.00
6 Roller Brush each 561.28

Material
Cost
Unit Price
Sl. Items Unit Quantity (Without
(Tk.)
VAT &
TAX)
Exterior standard
1 acrylic emulsion coat Liter 70.70 310.00 21917.00
paint

2 Sealer Liter 62.92 195.00 12269.99


3 Ready-mix putty Kg 247.45 64.00 15836.80
4 Sand paper each 71.00 40.00 2840.00
5 4'' Paint Brush each 10.00 140.00 1400.00
6 Roller Brush each 48.00 300.00 14400.00
68663.79
Labor Cost
(Without
Remarks
VAT &
TAX)

M.S
Angle
1276.57 Enamel
Paint-
(105 Sft)

Labor Cost
(Without
Remarks
VAT &
TAX)

Interior
Emulsion
1276.569 Paint (2-
Coats)-
(7920 Sft)

Labor Cost
(Without
Remarks
VAT &
TAX)

Exterior labor
Emulsion
1276.569 0.85x700 42066.5
Paint-
(7070 Sft) 0.85x550 33052.25
100 7070
82,188.75

35.35 47.13333