7 Hrs PS arrangement of EIP feeders in HESCOM

Pattern for arranging 7 Hrs Power Supply to EIP feeders


District
Grand
7 Hrs Continuous 5+2 4+3 3+4 6 Hrs 5 Hrs
Total

BAGALKOT 150 335 44 8 0 537

BELAGAVI 417 149 187 277 56 16 1102

DHARWAD 45 25 8 0 0 78

GADAG 64 2 32 4 0 0 102

HAVERI 73 2 153 30 26 0 284

VIJAYAPUR 254 36 184 37 73 13 597

Grand Total 1003 214 899 392 163 29 2700


7 Hrs PS arrangement of EIP feeders in HESCOM
Pattern for arranging 7 Hrs Power Supply to
EIP feeders
District Total EIP
feeders No. of feeders No. of No. of feeders
with 7 Hrs feeders in with Less Than
Continuous PS Split Batches 7 Hours PS

BAGALKOT 539 150 381 8

BELAGAVI 1103 417 614 72

DHARWAD 78 45 33 0

GADAG 102 64 38 0

HAVERI 284 73 185 26

VIJAYAPUR 597 254 257 86

Grand Total 2703 1003 1508 192

Note: This includes Y-operation feeders and Hukkeri Society Feeders also.

3+4 Less Than 7 Hours

44 8

277 72
0
4 0
30 26
37 86
392 192
14.50 7.10
Station wise list of less than 7 Hrs Power Supply arrangement to EIP feeders in HESCOM

Power Supply Reasons for arranging less than 7 Hours


NAME OF THE 110KV
SI.No. DISTRICT OR 33KV STATION Scheme (Less
3-ph PS Remedial action taken/ To be Taken
Than 7 Hrs)

1 VIJAYAPUR DHAWALAGI_33KV 3+3 Due to station constaints New 110KV Hullur S/S work is under Progress

New 110KV Yankanchi S/S work is under


2 VIJAYAPUR GOLAGERI_33KV 3+2 Due to station constaints
Progress
New 110KV Dindawar S/S work is under
3 VIJAYAPUR H.HIPPARAGI_33KV 3+3 Due to station constaints
Progress

4 VIJAYAPUR HONNUTAGI_33KV 3+3 Due to station constaints New 110KV Jambagi S/S work is under Progress

5 VIJAYAPUR KADLEWADA_33KV 3+3 Due to station constaints Addl 5MVA work is under progress

6 VIJAYAPUR MUTTAGI_33KV 3+3 Due to station constaints Addl 5MVA Estimates subimtted to Corp Office

7 VIJAYAPUR NAAD_33KV 3+3 Due to station constaints Addl 5MVA Estimates subimtted to Corp Office

8 VIJAYAPUR NAGATHAN_33KV 3+3 Due to station constaints New 110KV Jambagi S/S work is under Progress

9 VIJAYAPUR NIVARAGI_33KV 3+3 Due to station constaints Addl 5MVA work under tender process

10 VIJAYAPUR TIDAGUNDI_33KV 3+3 Due to station constaints New 110KV Kannur S/S work is under Progress

11 VIJAYAPUR
6 Hrs Due to station constaints & all feeders are Y- Augmentation of 10/20MVA Trf work is under
SINDAGI_110KV
Continuous Operated progress

12 VIJAYAPUR TODALABAGI_110KV 3+3 Due to station constaints New 220KV Todalbagi S/S Proposed
Power Supply Reasons for arranging less than 7 Hours
NAME OF THE 110KV
SI.No. DISTRICT
OR 33KV STATION
Scheme (Less
3-ph PS Remedial action taken/ To be Taken
Than 7 Hrs)

It is not possible to give 7 hrs power supply to


each EIP feeder. Since, there are 4 Nos of EIP Establishment of 110KV S/S Gote is sanctioned,
13 BAGALKOT KALABILAGI_33KV 3+3 feeders "Y" operation on F2, F3 & F5 (2 lines) and work under progress. It will be tentatively
also batches will be overlapped & Transformer commissioned on or before Dec-2023.
will becomes overloaded.

New 110KV S/S Mugalkhod commissoined on


14 BAGALKOT RANNABELAGALI_110KV
6 Hrs Due to Y operation, feeder overlaping 27.10.2023. Link line work undere progress,
Continuous transformer overload after completion of the link line work load will
be diverted

Augmentation to 110/11KV Substation


15 BELAGAVI HULAKUND_33KV 3+3 2X5MVA, 33/11KV Station over loaded
proposal submitted

Work of upgradtion to 2X10MVA,110/11KV


16 BELAGAVI MALLUR_33KV 5 2X5MVA, 33/11KV Station over loaded
Substation is under progress

Work of upgradtion to 2X10MVA,110/11KV


2x5MVA, 33/11KV Stations Munavalli, Mallur and
Substation is under progress and after
17 BELAGAVI MUNAVALLI_33KV
6 Hrs Hoolikatti are being fed by 1X20 MVA, 110/33KV
commissioning of this , the load on source
Continuous Power transformer from 110/33-11KV Substation,
20MVA, 110/33KV power transformer 110KV
Munavalli and hence Source constraints.
substation Munavalli will be reduced.

Augmentation to 110/11KV Substation


18 BELAGAVI MURAGOD_33KV 5+1 3X5MVA, 33/11KV Station over loaded
proposal submitted

Work of upgradtion to 2X10MVA,110/11KV


19 BELAGAVI KAROSHI_33KV 3+2 2X5MVA, 33/11KV Station over loaded
Substation is under progress
Power Supply Reasons for arranging less than 7 Hours
NAME OF THE 110KV
SI.No. DISTRICT
OR 33KV STATION
Scheme (Less
3-ph PS Remedial action taken/ To be Taken
Than 7 Hrs)

Augmentation to 110/11KV Substation


20 BELAGAVI KHOTAWDI_33KV 5+1 2X5MVA, 33/11KV Station over loaded proposal submitted and approved and work to
be taken up.

21 BELAGAVI MANTUR(RAIBAG)_110KV
6 Hrs Feeder having 'Y' operation and Over load.
10/20 MVA Transformer without switchgear
Continuous approved

01.) New 110/11 KV Substation with 1x10 MVA


work under progress
02) New 110 KV Bavachi Substation proposed
(To be approved)
22 BELAGAVI RAIBAG_110KV 3+3 Transformer/Bank/feeders overload
03) New 110 KV Jalalpur proposed (to be
approved)
04) 10/20 MVA 110/11 KV without switchgear
approved

23 HAVERI AKKIALUR_33KV 3+3

24 HAVERI BELAGALPET_33KV 3+3


110/11 KV new station was proposed at
2*20 MVA, 110/33 KV Transformers were tripping
Balambeeda village to takeup the load of 33/11
25 HAVERI BOMMNAHALLI_33KV 3+3 on over load at 110 KV Hangal Station which are
KV AkkiAlur station. Station work yet to be
feeding to these 33/11 KV stations.
takenup since, LOI was issued from KPTCL.
26 HAVERI HANGAL_33KV 3+3

27 HAVERI LAXMIPUR_33KV 3+3


Hubli Electricity Supply Company Limited
Day wise power supply status for the month of October-2023
Peak load in mw

Over
Morning Peak Solar Hours Evening Peak Night Peak EIP feedrs (Hrs:Min) Maximum Time Allocation Consumption drawal(+)/
Sl. No Date Restrictions in MW
Load (MW) (Hrs:Mins) (MU) (MU) Under
drawal(-)
Open-delta
6.00 hrs to 9.00 hrs to 18.00 hrs to 22.00 hrs to
3PH (with Farm
9.00 Hrs 16.00 Hrs 22.00 hrs 6.00 hrs
houses)
1 1-Oct-23 1771 2291 1111 1319 7:00 4:00 2311 11:52 45.26 42.36 -2.9 No restrictions
2 2-Oct-23 1580 2141 1302 1396 7:00 4:00 2247 12:44 43.99 43.35 -0.6 No restrictions
3 3-Oct-23 1989 2567 1477 1884 7:00 4:00 2689 10:50 39.85 47.86 8.0 No restrictions
4 4-Oct-23 2234 2729 1680 1678 7:00 2:00 2769 10:05 41.03 50.45 9.4 No restrictions
5 5-Oct-23 2028 2749 1520 1847 6:30 0:00 2331 9:44 42.54 51.63 9.1 405MW
6 6-Oct-23 2006 2692 1432 1565 3:00 0:00 2768 11:56 41.82 49.44 7.6 1588MW
7 7-Oct-23 1790 2865 1418 1593 02:30 0:00 2949 12:44 37.11 46.90 9.8 1756mw
8 8-Oct-23 2002 3121 1336 1927 03:00 0:00 3176 12:34 39.09 51.65 12.6 1775mw
9 9-Oct-23 1906 3295 1490 2042 03:00 0:00 3363 11:34 38.96 51.67 12.7 1250mw
10 10-Oct-23 2173 3215 1650 2000 5:00 0:00 3271 11:28 41.21 53.94 12.7 1254mw

11 11-Oct-23 2250 3162 1737 2348 5:00 4:00 3295 11:26 41.22 55.28 14.1 No restrictions

12 12-Oct-23 2008 2924 1821 2331 5:00 4:00 3004 11:44 41.05 53.52 12.5 No restrictions
13 13-Oct-23 1742 3075 1593 2268 5:00 4:00 3124 10:56 42.19 54.56 12.4 No restrictions
14 14-Oct-23 1761 3039 1757 2129 5:00 4:00 3073 11:00 42.24 55.27 13.0 No restrictions
15 15-Oct-23 1701 3136 2059 2163 5:00 4:00 3199 11:26 40.49 53.24 12.8 No restrictions
16 16-Oct-23 1706 3106 2536 2179 4:30 4:00 3164 11:46 42.05 56.40 14.4 84MW
17 17-Oct-23 1976 3233 2197 2242 4:30 4:00 3291 10:58 41.18 55.66 14.5 549mw
18 18-Oct-23 2119 3358 2192 2221 4:30 4:00 3400 11:28 42.66 55.59 12.9 335MW
19 19-Oct-23 2359 3368 2158 2205 4:30 4:00 3397 12:22 43.83 56.10 12.3 350MW

20 20-Oct-23 2494 3338 1913 2233 5:00 4:00 3361 12:30 45.99 56.11 10.1 No restrictions

21 21-Oct-23 2706 3168 1850 2357 5:00 4:00 3210 12:26 45.40 56.88 11.5 No restrictions
22 22-Oct-23 2595 3068 1839 2391 5:00 4:00 3108 12:28 45.15 54.98 9.8 No restrictions
23 23-Oct-23 2554 2837 1756 2289 5:00 4:00 2891 14:20 44.38 53.70 9.3 No restrictions
24 24-Oct-23 2574 2979 1545 1941 5:00 4:00 3019 13:10 44.02 52.91 8.9 No restrictions
25 25-Oct-23 2538 3080 1709 2204 5:00 4:00 3097 12:10 46.61 55.55 8.9 No restrictions
26 26-Oct-23 2801 3071 1750 2295 5:30 4:00 3193 10:22 50.33 58.23 7.9 No restrictions
27 27-Oct-23 2923 3055 1708 2294 5:30 4:00 3104 12:56 50.55 58.50 8.0 No restrictions
28 28-Oct-23 2909 3062 1704 2263 5:30 4:00 3151 12:56 50.64 58.71 8.1 No restrictions
29 29-Oct-23 2852 3023 1640 2306 5:30 4:00 3063 12:52 47.46 57.44 10.0 No restrictions
30 30-Oct-23 2671 2950 1577 2059 5:45 4:00 3002 12:58 47.50 56.61 9.1 No restrictions
31 31-Oct-23 2543 2805 1534 2019 5:50 4:00 2891 12:36 48.00 54.51 6.5 No restrictions

3029 Average 43.67 53.52 10


(MW)
Note: There are constraints in 106 stations (79 Nos.- 33 KV & 27 Nos.-110 KV) which require around 225 Nos. of EIP feeders ( 500 MW) to be operated in morning peak 6-9 hours in order to extend
6-7 hours of PS. If allowed to operate HESCOM EIP load during morning peak between 6.00 hrs to 9.00 hrs, the average load will be around 2100 MW.
Hubli Electricity Supply Company Limited
Day wise power supply status for the month of August-2023
Peak Load in MW
Average hours of PS arranged to
EIP feedrs (Hrs:Min) Over
Morning Peak Solar Hours Evening Peak Night Peak Peak Load
Time Allocation Consumpti drawal(+)/
Sl. No Date (MW) as per Restrictions in MW
(Hrs:Mins) (MU) on (MU) Under
SCADA
drawal(-)
6.00 hrs to 9.00 hrs to 18.00 hrs to 22.00 hrs to Open-delta (with Farm
3PH
9.00 Hrs 4.00 Hrs 22.00 hrs 6.00 hrs houses)

1 1-Aug-23 1592 1966 1315 1288 07:00 4:00 1951 10:44 39.29 35.18 -4.1 No restrictions

2 2-Aug-23 1518 1977 1241 1311 07:00 4:00 1986 10:18 40.05 36.19 -3.9 No restrictions

3 3-Aug-23 1459 1922 1207 1259 07:00 4:00 1979 10:32 42.34 39.19 -3.2 No restrictions

4 4-Aug-23 1599 2157 1366 1367 07:00 4:00 2248 10:34 44.04 40.84 -3.2 No restrictions

5 5-Aug-23 1761 2365 1442 1639 07:00 4:00 2395 10:02 46.23 42.35 -3.9 No restrictions

6 6-Aug-23 1735 2352 1356 1574 07:00 4:00 2431 10:44 41.45 42.47 1.0 No restrictions

7 7-Aug-23 1693 2603 1541 1586 07:00 0:00 2602 12:10 42.91 46.58 3.7 No restrictions

8 8-Aug-23 1588 2710 1336 1731 5:30 0:00 2823 10:54 42.47 47.17 4.7 232
9 9-Aug-23 1759 2856 1529 1587 6:00 0:00 2986 11:16 42.25 49.46 7.2 169
10 10-Aug-23 1622 3008 1626 1771 5:00 4:00 3073 12:52 40.56 50.10 9.5 853

11 11-Aug-23 1567 3075 1470 1757 03:45 0:00 3101 11:20 41.49 49.90 8.4 2079

12 12-Aug-23 1650 2991 1886 1845 6:00 0:00 3038 12:52 44.22 54.05 9.8 335

13 13-Aug-23 1749 2826 1597 2022 7:00 4:00 2852 10:42 43.37 54.88 11.5 No restrictions

14 14-Aug-23 1756 3158 1915 2187 6:00 4:00 3226 11:28 46.56 57.80 11.2 591
15 15-Aug-23 1725 3073 1738 2277 5:30 4:00 3224 11:50 47.11 57.32 10.2 167

16 16-Aug-23 1801 3236 1535 2045 3:30 0:00 3314 10:32 45.26 54.29 9.0 1685

17 17-Aug-23 1841 3212 1849 1964 5:45 4:00 3252 14:42 45.44 57.12 11.7 243

18 18-Aug-23 1918 3181 1773 2103 6:00 4:00 3212 11:33 48.83 57.95 9.1 428
19 19-Aug-23 1889 2948 1613 2059 5:00 4:00 2957 10:58 47.74 51.60 3.9 519

20 20-Aug-23 1969 2889 1575 2058 6:00 4:00 2945 11:34 45.21 55.91 10.7 No restriction
1647 (Avg Day time 1144 Avg Night time
21 21-Aug-23 1859 3245 1559 2183 3:00 0:00 3288 12:18 41.08 55.83 14.8 367mw)
2558 (Avg Day time 1069 Avg Night time
22 22-Aug-23 1745 3252 1873 2314 3:00 0:50 3256 10:50 42.17 54.05 11.9 588mw)

23 23-Aug-23 1870 3286 2069 2351 6:30 4:00 3427 12:40 45.46 60.72 15.3 590

850 (Avg Day time 226 Avg Night time


24 24-Aug-23 2130 3401 1806 2313 5:45 4:00 3470 11:30 46.52 62.82 16.3 467mw)

25 25-Aug-23 2042 3437 1757 2273 6:30 1:15 3447 11:24 46.96 60.07 13.1 850 (Avg Night time 222mw )

26 26-Aug-23 2168 3222 1983 2300 6:30 4:00 3262 11:30 45.23 55.48 10.3 No Restrictions

27 27-Aug-23 2170 3188 1874 2403 6:30 4:00 3201 11:32 46.70 59.37 12.7 No Restrictions

28 28-Aug-23 2213 3221 1798 2310 6:30 4:00 3326 11:40 48.15 60.12 12.0 No Restrictions

29 29-Aug-23 1898 3167 1866 2200 6:30 0:30 3228 10:44 46.23 60.08 13.9 633(Avg Night time 633mw)
1639 (Avg Day time 1041mw Avg Night
30 30-Aug-23 1962 3072 1580 2005 4:00 0:00 3084 11:16 44.17 53.63 9.5 time 606mw)
31 31-Aug-23 1768 2830 1366 2101 4:00 0:00 2929 11:46 38.99 49.63 10.6 2323 (Avg Day time 1233mw)

3470 44.14 52.00 8


Peak Load in MW
Average hours of PS arranged to
EIP feedrs (Hrs:Min) Over
Morning Peak Solar Hours Evening Peak Night Peak Peak Load
Time Allocation Consumpti drawal(+)/
Sl. No Date (MW) as per Restrictions in MW
(Hrs:Mins) (MU) on (MU) Under
SCADA
drawal(-)
6.00 hrs to 9.00 hrs to 18.00 hrs to 22.00 hrs to Open-delta (with Farm
3PH
9.00 Hrs 4.00 Hrs 22.00 hrs 6.00 hrs houses)

Note: There are constraints in 106 stations (79 Nos.- 33 KV & 27 Nos.-110 KV) which require around 225 Nos. of EIP feeders ( 500 MW) to be operated in morning peak 6-9 hours in order to
extend 6-7 hours of PS. If allowed to operate HESCOM EIP load during morning peak between 6.00 hrs to 9.00 hrs, the average load will be around 2100 MW.

Base Load in EIP Load in


Timings MW MW
Total Load in MW

Average load during 6.00 hrs to 9.00 hrs 1500 500 2000
1600-1200
Average load during 9.00 hrs to 16.00/18.00 hrs 1500
(Staggered)
3000

Average load during 18.00 hrs to 22.00 hrs 1500 350 1850

Average load during 22.00 hrs to 6.00 hrs next day 1500 700 2200
7:00

6:00

5:30

3:30

5:45

6:00

5:00

6:00

3:00

3:00

6:30

5:45

6:30

6:30

6:30

6:30

6:00

4:00
4:00
Hubli Electricity Supply Company Limited
Day wise power supply status for the month of September-2023
Peak load in mw

Over
Morning Peak Solar Hours Evening Peak Night Peak EIP feedrs (Hrs:Min) Maximum Time Allocation Consumption drawal(+)/
Sl. No Date Restrictions in MW
Load (MW) (Hrs:Mins) (MU) (MU) Under
drawal(-)
Open-delta
6.00 hrs to 9.00 hrs to 18.00 hrs to 22.00 hrs to
3PH (with Farm
9.00 Hrs 16.00 Hrs 22.00 hrs 6.00 hrs
houses)
1 1-Sep-23 1928 2963 1582 1891 5:30 0:00 3018 12:28 44.63 55.29 10.7 1633 (Avg Day time 1283 mw)
2 2-Sep-23 2009 2815 1701 1970 7:00 4:00 2839 11:26 42.43 55.56 13.1 No restrictions
3 3-Sep-23 1862 2716 1476 1921 7:00 4:00 2724 12:36 43.28 52.82 9.5 No restrictions
4 4-Sep-23 1590 2048 1371 1583 7:00 4:00 2098 12:42 49.40 41.84 -7.6 No restrictions
5 5-Sep-23 1702 2205 1448 1569 7:00 4:00 2235 11:54 46.10 44.01 -2.1 No restrictions
6 6-Sep-23 1644 2111 1455 1686 7:00 4:00 2220 11:44 45.29 45.82 0.5 No restrictions
7 7-Sep-23 1855 2201 1454 1695 7:00 5:00 2270 9:54 47.15 48.67 1.5 No restrictions
8 8-Sep-23 1663 2462 1567 1753 7:00 4:00 2525 10:56 47.15 49.71 2.6 No restrictions
9 9-Sep-23 1806 2421 1544 1756 7:00 4:00 2453 11:18 47.30 49.19 1.9 No restrictions
10 10-Sep-23 1874 2222 1555 1861 7:00 4:00 2307 9:44 47.54 48.57 1.0 No restrictions

11 11-Sep-23 2038 2677 1618 1894 7:00 4:00 2718 11:22 48.73 53.22 4.5 No restrictions

12 12-Sep-23 2112 2761 1644 1859 7:00 4:00 2785 11:38 47.38 55.67 8.3 No restrictions
13 13-Sep-23 2205 2559 1564 1851 7:00 4:00 2661 10:50 44.97 55.77 10.8 No restrictions
14 14-Sep-23 2142 2779 1613 1977 7:00 4:00 2837 11:28 46.70 58.33 11.6 No restrictions
15 15-Sep-23 2076 2861 1694 2142 7:00 4:00 2892 12:48 48.45 59.82 11.4 No restrictions
16 16-Sep-23 2271 2719 1716 1801 7:00 4:00 2804 9:38 50.61 57.86 7.3 No restrictions
17 17-Sep-23 1807 2470 1369 1717 7:00 4:00 2574 12:58 47.35 56.24 8.9 No restrictions
18 18-Sep-23 2149 2798 1650 1863 7:00 4:00 2827 11:12 45.81 56.63 10.8 No restrictions
19 19-Sep-23 2138 2640 1419 1847 7:00 4:00 2669 12:56 45.46 55.28 9.8 No restrictions

20 20-Sep-23 2112 2822 1801 2120 7:00 4:00 2891 12:44 43.70 57.34 13.6 No restrictions

21 21-Sep-23 2217 3094 1837 2027 7:00 4:00 3110 11:12 43.36 58.32 15.0 No restrictions
22 22-Sep-23 2276 3223 1490 1800 7:00 4:00 3300 11:30 42.73 56.57 13.8 No restrictions
23 23-Sep-23 2083 2720 1537 1874 7:00 4:00 2878 12:42 44.17 52.99 8.8 No restrictions
24 24-Sep-23 1986 2683 1411 1762 7:00 4:00 2733 12:58 44.76 51.55 6.8 No restrictions
25 25-Sep-23 1876 2784 1613 1981 7:00 4:00 2866 11:40 41.04 53.08 12.0 No restrictions
26 26-Sep-23 2237 2907 1525 1851 7:00 4:00 2986 12:44 39.81 51.88 12.1 No restrictions
27 27-Sep-23 2096 2587 1458 1712 7:00 4:00 2617 11:54 42.52 47.82 5.3 No restrictions
28 28-Sep-23 2030 2672 1490 1667 7:00 4:00 2758 12:00 39.91 47.22 7.3 No restrictions
29 29-Sep-23 1856 2527 1389 1600 7:00 4:00 2557 11:12 51.81 46.39 -5.4 No restrictions
30 30-Sep-23 1849 2314 1494 1674 7:00 4:00 2457 11:44 43.45 46.28 2.8 No restrictions

2687 Average 45.43 52.32 7


(MW)
Note: There are constraints in 106 stations (79 Nos.- 33 KV & 27 Nos.-110 KV) which require around 225 Nos. of EIP feeders ( 500 MW) to be operated in morning peak 6-9 hours in order to extend 6-
7 hours of PS. If allowed to operate HESCOM EIP load during morning peak between 6.00 hrs to 9.00 hrs, the average load will be around 2100 MW.
Hubli Electricity Supply Company Limited
Day wise power supply status for the month of November-2023
Peak load in mw

Over
Morning Peak Solar Hours Evening Peak Night Peak EIP feedrs (Hrs:Min) Maximum Time Allocation Consumption drawal(+)/
Sl. No Date Restrictions in MW
Load (MW) (Hrs:Mins) (MU) (MU) Under
drawal(-)
Open-delta
6.00 hrs to 9.00 hrs to 18.00 hrs to 22.00 hrs to
3PH (with Farm
9.00 Hrs 16.00 Hrs 22.00 hrs 6.00 hrs
houses)
1 1-Nov-23 2403 2552 1473 1950 5:50 4:00 2600 12:42 47.76 53.85 6.1 No restrictions 6hrs power supply to EIP feeders
2 2-Nov-23 2507 2702 1659 2025 5:50 4:00 2749 12:44 49.01 55.09 6.1 No restrictions 6hrs power supply to EIP feeders
3 3-Nov-23 2528 2677 1621 2097 5:50 4:00 2732 11:40 48.86 56.01 7.1 No restrictions 6hrs power supply to EIP feeders
4 4-Nov-23 2535 2672 1615 2057 5:50 4:00 2715 12:38 48.51 55.23 6.7 No restrictions 6hrs power supply to EIP feeders
5 5-Nov-23 2186 2533 1450 2002 5:50 4:00 2555 11:44 47.77 53.68 5.9 No restrictions 6hrs power supply to EIP feeders
6 6-Nov-23 2389 2532 1242 1802 5:50 4:00 2560 10:28 48.63 51.24 2.6 No restrictions 6hrs power supply to EIP feeders
7 7-Nov-23 2126 2458 1685 1907 6:45 4:00 2559 12:28 45.99 50.71 4.7 No restrictions 7hrs power supply to EIP feeders
8 8-Nov-23 1978 2365 1385 1884 6:45 4:00 2378 8:58 45.23 49.04 3.8 No restrictions 7hrs power supply to EIP feeders
9 9-Nov-23 1709 2004 1345 1483 6:45 4:00 2099 12:40 46.02 43.54 -2.5 No restrictions 7hrs power supply to EIP feeders
10 10-Nov-23 1940 1983 1491 1559 6:45 4:00 2060 12:42 46.82 42.82 -4.0 No restrictions 7hrs power supply to EIP feeders

11 11-Nov-23 1929 1968 1293 1467 6:45 4:00 2011 11:00 43.83 45.29 1.5 No restrictions 7hrs power supply to EIP feeders

12 12-Nov-23 2003 2047 1258 1382 6:45 4:00 2097 9:58 42.89 44.87 2.0 No restrictions 7hrs power supply to EIP feeders
13 13-Nov-23 1914 2088 1367 1540 6:45 4:00 2125 12:00 43.50 45.14 1.6 No restrictions 7hrs power supply to EIP feeders
14 14-Nov-23 2006 2079 1439 1477 6:45 4:00 2134 12:58 42.30 46.33 4.0 No restrictions 7hrs power supply to EIP feeders
15 15-Nov-23 2096 2252 1517 1661 6:45 4:00 2304 10:32 44.37 46.75 2.4 No restrictions 7hrs power supply to EIP feeders
16 16-Nov-23 2155 2274 1623 1732 6:45 4:00 2339 11:42 41.58 48.33 6.8 No restrictions 7hrs power supply to EIP feeders
17 17-Nov-23 2281 2437 1635 1825 6:45 4:00 2484 11:28 43.83 50.12 6.3 No restrictions 7hrs power supply to EIP feeders
18 18-Nov-23 2226 2379 1535 1715 6:45 4:00 2424 10:30 44.34 51.28 6.9 No restrictions 7hrs power supply to EIP feeders
19 19-Nov-23 2084 2261 1384 1551 6:45 4:00 2315 11:56 46.56 49.81 3.3 No restrictions 7hrs power supply to EIP feeders

20 20-Nov-23 2025 2388 1359 1548 6:45 4:00 2397 12:40 47.08 50.57 3.5 No restrictions 7hrs power supply to EIP feeders

21 21-Nov-23 2208 2387 1520 1705 6:45 4:00 2415 11:30 47.26 51.08 3.8 No restrictions 7hrs power supply to EIP feeders
22 22-Nov-23 2252 2315 1396 1578 6:45 4:00 2319 9:36 45.22 50.66 5.4 No restrictions 7hrs power supply to EIP feeders
23 23-Nov-23 2371 2355 1505 1771 6:45 4:00 2453 11:42 44.79 51.19 6.4 No restrictions 7hrs power supply to EIP feeders
24 24-Nov-23 2278 2323 1480 1704 6:45 4:00 2394 11:26 44.88 50.92 6.0 No restrictions 7hrs power supply to EIP feeders
25 25-Nov-23 2159 2348 1411 1627 6:45 4:00 2354 10:36 45.65 51.43 5.8 No restrictions 7hrs power supply to EIP feeders
26 26-Nov-23 2158 2138 1395 1521 6:45 4:00 2185 9:58 46.05 49.07 3.0 No restrictions 7hrs power supply to EIP feeders
27 27-Nov-23 1610 2393 1478 1699 6:45 4:00 2508 12:00 49.12 49.95 0.8 No restrictions 7hrs power supply to EIP feeders
28 28-Nov-23 2303 2455 1218 1605 6:45 4:00 2540 13:02 47.04 48.79 1.8 No restrictions 7hrs power supply to EIP feeders
29 29-Nov-23 1867 2162 1386 1520 6:45 4:00 2210 11:50 47.69 44.37 -3.3 No restrictions 7hrs power supply to EIP feeders
30 30-Nov-23 1855 2097 1348 1407 6:45 4:00 2102 11:10 48.51 44.81 -3.7 No restrictions 7hrs power supply to EIP feeders

Average
2371 (MW) 46.04 49.40 3

Note: There are constraints in 106 stations (79 Nos.- 33 KV & 27 Nos.-110 KV) which require around 225 Nos. of EIP feeders ( 500 MW) to be operated in morning peak 6-9 hours in order to extend 6-7 hours of PS. If
allowed to operate HESCOM EIP load during morning peak between 6.00 hrs to 9.00 hrs, the average load will be around 2100 MW.
HUBLI ELECTRICTY SUPPLY COMPANY LIMITED
HESCOM MAXIMUM LOAD AND CONSUMPTION MONTH WISE
MAXIMUM LOAD
SL NO YEAR/MONTH Consumption in MU Remarks
DATE TIME PEAK LOAD IN MW
FY-2022-23
1 APRIL 04.04.2022 11:58 2955 1439.106
2 MAY 03.05.2022 10:56 2676 1343.529
3 JUNE 02.06.2022 11:00 2337 1258.429
4 JULY 02.07.2022 18:28 2490 1030.067
5 AUGUST 24.08.2022 13:26 1998 1016.214
6 SEPTEMBER 29.09.2022 10:54 2351 956.866
7 OCTOBER 31.10.2022 11:18 2014 856.222
8 NOVEMBER 19.11.2022 10:56 2446 1303.155
9 DECEMBER 31.12.2022 11:50 2688 1378.015
10 JANUARY 17.01.2023 11:50 2709 1510.178
11 FEBRUARY 16.02.2023 9:52 2831 1518.652
12 MARCH 15.03.2023 11:24 2825 1747.345
FY-2023-24
1 APRIL 06.04.2023 10:51 3093 1701.185
2 MAY 06.05.2023 9:52 3021 1646.791
3 JUNE 21.06.2023 9:58 2824 1627.213
4 JULY 13.07.2023 11:04 2774 1278.518
5 AUGUST 24.08.2023 11:30 3470 1615.444
6 SEPTEMBER 22.09.2023 11:30 3300 1570.309
7 OCTOBER 18.10.2023 11:28 3400 1660.755
8 NOVEMBER 02.11.2023 12:44 2749 1538
9 DECEMBER 2957 1626
10 JANUARY 2980 1782
11 FEBRUARY 3114 1792 Forecasted Peak &
12 MARCH 3249 1887 Consumption
FY-2024-25
1 APRIL 3650 1905
2 MAY 3565 1943
AVERAGE HOURS OF POWER SUPPLY IN HESCOM
EIP
SL NO. DATE Without considering station constraints
Actual Average Hours of power supply
given
3-Ph Open-Delta 3-Ph Open-Delta
1 01.11.2023 6:00 4:00 5:50 4:00
2 02.11.2023 6:00 4:00 5:50 4:00
3 03.11.2023 6:00 4:00 5:50 4:00
4 04.11.2023 6:00 4:00 5:50 4:00
5 05.11.2023 6:00 4:00 5:50 4:00
6 06.11.2023 6:00 4:00 5:50 4:00
7 07.11.2023 7:00 4:00 6:45 4:00
8 08.11.2023 7:00 4:00 6:45 4:00
9 09.11.2023 7:00 4:00 6:45 4:00
10 10.11.2023 7:00 4:00 6:45 4:00
11 11.11.2023 7:00 4:00 6:45 4:00
12 12.11.2023 7:00 4:00 6:45 4:00
13 13.11.2023 7:00 4:00 6:45 4:00
14 14.11.2023 7:00 4:00 6:45 4:00
15 15.11.2023 7:00 4:00 6:45 4:00
16 16.11.2023 7:00 4:00 6:45 4:00
17 17.11.2023 7:00 4:00 6:45 4:00
18 18.11.2023 7:00 4:00 6:45 4:00
19 19.11.2023 7:00 4:00 6:45 4:00