You are on page 1of 1

SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX

OPRNS
ENGG CERT PMT

AMIEF 2601: EQUIPMENT INSPECTION SCHEDULE


INSPECTION
INTERVAL-MONTHS
EQUIPMENT INSPECTION PROCEDURE
Initial
OSI T&I
T&I
DESCRIPTION
JO/EWO
DATE
REV.
NO.

DISCIPLINE
ENGINEER

DATE
PROJECT
ENGINEER

DATE
CERTIFIED

DATE
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISION CERTIFICATION

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Supvr. Opns Insp. Gen. Supvr./ Supt. Opns. Engr. Superintendent Opns. Manager, Insp. Dept. Gen. Mgr. Opns or Plt. Mgr.
THIS INDICATES THAT REV. NO.

APPROVAL/CERTIFICATION

JO / EWO
REQUIREMENTS

JO NO.
EQUIPMENT INSPECTION SCHEDULE DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

SCH
(DCC) NO.

A
EWO NO.

0
JO / EWO