SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preweld Qualification of HDPE Welder SAIC-A-1014 3-Jul-18 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER S EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Preweld Qualification of Welder 

Welds shall be done by personnel trained in the proper handling and


A1 Method Statement
usage of applicable materials and equipment

 A Training Log shall be maintained by the installation


installation organization to
indicate the name(s) of the trained induviduals, the date of instruction, the
A2 Method Statement
instructor, product and the manufacturers name who issued the training
certificate

Welders shall only perform welds on the material on which they received
A3 Method Statement
training and certificates.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-104 -- Wastewater Treatment, Reuse and Disposal,
D isposal, 25 July 2017

Contractor / Third-Party Saudi Aramco


Construction Representative* 
Representative*  PMT Representative 
Representative 
Work is Complete and Ready for Inspection: T&I W
Wiitnessed QC Re
Record Re
Reviewed Work V
Ve
erified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Pe
Perf
rfor
orme
med
d In
Insp
spec
ecti
tion
on Wo
Work
rk / Rew
Rewor
ork
kMMay
ay Pr
Proc
ocee
eed
d T&I W
Wiitnessed QC Re
Record Re
Reviewed Work V
Ve
erified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


 Quality Record Approved: T&I W
Wiitnessed QC Re
Record Re
Reviewed Work V
Ve
erified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


 

SAUDI ARAMCO ID/PIEU


ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018)

Saudi Aramco: Company General Use

Rev. 2018.04.00
3-Jul-18

Saudi Aramco: Company General Use

30-Apr-18
Saudi Aramco: Company General Use