EQUIP ME NT ID NUMBER(S) E QUIP ME NT DE SCRIP TION E QP T CODE S Y S TEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. P URCHAS E ORDER NUMBE R EC / PMCC / MCC NO.
SCHE DULED INSP ECTION DATE & TIME ACTUAL INSPECTION DATE & TIME
TIME QUANTITY INSP. MH's SP ENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER S AUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FA IL N/A RE-INSP DA TE
No.
Test
Test Diag
Diagra
ram
m is subm
submitt
itted show
showin
ingg the foll
follow
owin
ing:
g:
a. Limits
Limits of piping to be tested including test manifold and
equipment included in the test. SAES-A-004,
A1
b. Test pressure of the system Para. 5.6.1
c. Relief valve setting
d. S afety Instruction S heet
SAES-A-004,
A2 Hydrostatic Testing Procedure
P rocedure has been approved.
approved.
Para. 7.1.1
Verify that pressure vessel has been constructed per approved drawings,
A3 Contract drawings
Verify all nozzles / dimensions as per drawings
Verify that all fabrication including welding of support attachments and 32-SAMSS-004,
A4
repair work (if any) has been completed. (ASME VIII, UG-99, Para. a-1) Section 16.3.1
Weld Sum
S ummar
maryy Record
R ecord was verified to indicate completion
completion of all weld SAES-W-012
A5
join
jointts and
and the appl
applic
icab
able
le weld
eld insp
inspec
ecttion
ion requi
equire
rem
ment
ents (vi
(visu
sual
al and
and NDE).
NDE). P ara. 16.1.2
16.1.2
All required inspection / testing (RT, MT, PT, PWHT, PMI) has been
32-SAMSS-004,
A6 completed and inspection control sheet to be signed by Saudi Aramco.
Section 16.3.1
(ASME VIII, UG-99
UG -99,, Para
P ara.. a-2)
Safety Instruction Sheet (SIS) for the vessesl/equipment is complete and
SAES-A-205,
A7 approved. (This Sheet will confirm the required field test pressure for the
Para. 4.2
system/equipment.)
The
The Test
Test Pressu
Pressurre at top of vesse
vessell is ver
verifie
ified
d with
ith the SIS and
and conf
confor
orm
m
with the
the following, as applicable: SAES-A-004,
A8
a) 1.5 tim
times
es MAWP for ASME
AS ME D1 vessels Para. 6.3.1
b) 1.25 times MAWP for ASME D2 vessels
B Field
Field Verif
Verificat
ication/
ion/Pr
Pre-
e-Te
Test
st Inspe
Inspection
ction of Vess
Vessel
el
Vents are provided at all high points in the position in which it is to be ASME VIII, UG-
B1
tested to purge all possible air during water
water filling. 99, Para.(i)
Vessel
Vess el must be adequately
adequately supported
supported during hydrotest
hydrotest if it is tested out SAES-A-004,
B2
of position Para.6.3.1
The
The str
strengt
ength
h of exist
existin
ing
g foun
found
datio
ation/
n/su
supp
ppor
ortts shal
shalll be conf
confir
irm
med to be SAES-A-004,
B3
adequate for additional weight of hydrotest fluid. Para.6.3.1
All joints and faying surfaces, except those specifically designed and
designated as removable bolted connections, are seal welded by a SAES-W-010,
B4
continuous fillet weld (required external weep holes shall be left P ara. 11.15.1
11.15.1
unwelded).
Weld Sum
S ummar
maryy Record
R ecord was verified to indicate completion
completion of all weld SAES-W-010,
B5
join
jointts and
and the appl
applic
icab
able
le weld
eld insp
inspec
ecttion
ion requi
equire
rem
ment
ents (vi
(visu
sual
al and
and NDE).
NDE). Para. 15.2
Page 1 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARA MCO INSPECTION CHECKLIS
Pre-Test Inspection of Vessels (Pressure Vessels, Fin Fan
SAIC-A-2025 25-May-05 MECH-
Coolers, etc)
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
0 0 0
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
32-SAMSS-004,
B6 Post Weld Heat Treatment (PWHT) is complete.
Section 16.3.2
Prior to final inspection & pressure test, new vessel internal and external
32-SAMSS-004,
B7 surfaces have been thoroughly cleaned. Any slag, scale, dirt, grit,
Section 16.2.9
spatter, paint, oil, and construction aids are removed.
Sampling piping systems are pressure tested as an integral part of the SAES-L-150,
B9
equipment to which it is connected. Para. 5.3
32-SAMSS-004,
B11 Shellacs, glues, lead, etc.are not to be applied on gaskets during testing.
Section 16.3.4
32-SAMSS-004,
B13 No paint or primer is applied to a vessel prior to hydrostatic testing.
Section 16.3.4
Equipment or parts that are clad shall be hydrotested with water having 32-SAMSS-031,
B16
chloride content not greater than 50 ppm. Para. 10.2.1
J acketed Vessel exams & hydrotest sequence are planned and detailed
in design & during hydrotesting (per test procedure).
A) Inner vessel construction & hydrotesting is completed prior to outer Best P ractice
B17 jacket installation and hydrotesting. (Project Quality
B) Construction sequence allows 100% visual inspection of welds during Plan)
hydrotest. J acket design & installation is carefully planned.
[Reference: ASME VIII, UG-99 sect. (e)]
REMARKS:
REFERENCE DOCUMENTS:
1. SAES -A-004, General Requirements for Pressure Testing, (30 J une, 2003)
2. SAES -D-008, Repairs, Alterations, and Re-rating of Process Equipment (30 November, 2003)
3. SAES -L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)
4. 32-SAMSS-004, Manufacture of Pressure Vessels (29 December 2004)
5. ASME Section VIII, Division 1 - Rules for Construction of Pressure Vessels (2002 Edition)
6. ASME S ection VIII, Division 2 - Rules for Construction of Pressure Vessels, Alternative Rules (2002 Edition)
Page 2 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARA MCO INSPECTION CHECKLIS
Pre-Test Inspection of Vessels (Pressure Vessels, Fin Fan
SAIC-A-2025 25-May-05 MECH-
Coolers, etc)
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
0 0 0
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FAILED
Page 3 of 3