You are on page 1of 3

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBE R DATE AP P ROVE D QR NUMBER


SAUDI ARA MCO INSPECTION
INSPECTION CHECKL
CHECKLIS
IS
Pre-Test Inspection of Vessels (Pressure Vessels, Fin Fan
SA IC-A -2025 25-May -05 MECH-
Coolers, etc)
P ROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIP ME NT ID NUMBER(S) E QUIP ME NT DE SCRIP TION E QP T CODE S Y S TEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. P URCHAS E ORDER NUMBE R EC / PMCC / MCC NO.

SCHE DULED INSP ECTION DATE & TIME ACTUAL INSPECTION DATE & TIME
TIME QUANTITY INSP. MH's SP ENT  TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER S AUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
 ACCEPTANCE CRITERIA REFERENCE PASS FA IL N/A RE-INSP DA TE
No.

 A Test Pac k Veri fi cat io n:

 Test
 Test Diag
Diagra
ram
m is subm
submitt
itted show
showin
ingg the foll
follow
owin
ing:
g:
a. Limits
Limits of piping to be tested including test manifold and
equipment included in the test. SAES-A-004,
 A1
b. Test pressure of the system Para. 5.6.1
c. Relief valve setting
d. S afety Instruction S heet
SAES-A-004,
 A2 Hydrostatic Testing Procedure
P rocedure has been approved.
approved.
Para. 7.1.1

Verify that pressure vessel has been constructed per approved drawings,
 A3 Contract drawings
Verify all nozzles / dimensions as per drawings

Verify that all fabrication including welding of support attachments and 32-SAMSS-004,
 A4
repair work (if any) has been completed. (ASME VIII, UG-99, Para. a-1) Section 16.3.1

Weld Sum
S ummar
maryy Record
R ecord was verified to indicate completion
completion of all weld SAES-W-012
 A5
 join
 jointts and
and the appl
applic
icab
able
le weld
eld insp
inspec
ecttion
ion requi
equire
rem
ment
ents (vi
(visu
sual
al and
and NDE).
NDE). P ara. 16.1.2
16.1.2

All required inspection / testing (RT, MT, PT, PWHT, PMI) has been
32-SAMSS-004,
 A6 completed and inspection control sheet to be signed by Saudi Aramco.
Section 16.3.1
(ASME VIII, UG-99
UG -99,, Para
P ara.. a-2)
Safety Instruction Sheet (SIS) for the vessesl/equipment is complete and
SAES-A-205,
 A7 approved. (This Sheet will confirm the required field test pressure for the
Para. 4.2
system/equipment.)

 The
 The Test
Test Pressu
Pressurre at top of vesse
vessell is ver
verifie
ified
d with
ith the SIS and
and conf
confor
orm
m
with the
the following, as applicable: SAES-A-004,
 A8
a) 1.5 tim
times
es MAWP for ASME
AS ME D1 vessels Para. 6.3.1
b) 1.25 times MAWP for ASME D2 vessels

B Field
Field Verif
Verificat
ication/
ion/Pr
Pre-
e-Te
Test
st Inspe
Inspection
ction of Vess
Vessel
el

Vents are provided at all high points in the position in which it is to be ASME VIII, UG-
B1
tested to purge all possible air during water
water filling. 99, Para.(i)

Vessel
Vess el must be adequately
adequately supported
supported during hydrotest
hydrotest if it is tested out SAES-A-004,
B2
of position Para.6.3.1

 The
 The str
strengt
ength
h of exist
existin
ing
g foun
found
datio
ation/
n/su
supp
ppor
ortts shal
shalll be conf
confir
irm
med to be SAES-A-004,
B3
adequate for additional weight of hydrotest fluid. Para.6.3.1

All joints and faying surfaces, except those specifically designed and
designated as removable bolted connections, are seal welded by a SAES-W-010,
B4
continuous fillet weld (required external weep holes shall be left P ara. 11.15.1
11.15.1
unwelded).

Weld Sum
S ummar
maryy Record
R ecord was verified to indicate completion
completion of all weld SAES-W-010,
B5
 join
 jointts and
and the appl
applic
icab
able
le weld
eld insp
inspec
ecttion
ion requi
equire
rem
ment
ents (vi
(visu
sual
al and
and NDE).
NDE). Para. 15.2

Page 1 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARA MCO INSPECTION CHECKLIS
Pre-Test Inspection of Vessels (Pressure Vessels, Fin Fan
SAIC-A-2025 25-May-05 MECH-
Coolers, etc)
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

0 0 0

ITEM
 ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

32-SAMSS-004,
B6 Post Weld Heat Treatment (PWHT) is complete.
Section 16.3.2

Prior to final inspection & pressure test, new vessel internal and external
32-SAMSS-004,
B7 surfaces have been thoroughly cleaned. Any slag, scale, dirt, grit,
Section 16.2.9
spatter, paint, oil, and construction aids are removed.

Vessel Trim (associated piping) receives a strength test except in Utility


SAES-L-150,
B8 services at 150 psi and less when a service test can be conducted.
Para. 5.3
(NOTE: Vessel Trim testing is often overlooked. )

Sampling piping systems are pressure tested as an integral part of the SAES-L-150,
B9
equipment to which it is connected. Para. 5.3

All welded attachments with telltale holes shall be pneumatically tested


32-SAMSS-004,
B10 at minimum 35 kPa (5 psi) prior to heat treatment and vessel pressure
Section 16.3.3
testing. Telltale holes are OPEN during pressure test.

32-SAMSS-004,
B11 Shellacs, glues, lead, etc.are not to be applied on gaskets during testing.
Section 16.3.4

Gaskets and bolting materials are as specified on data sheet. (NOTE:


32-SAMSS-004,
B12 Gaskets may be used as service gaskets if the bolted joint is not
Section 16.3.6
disassembled after testing, example: Sumps, etc.)

32-SAMSS-004,
B13 No paint or primer is applied to a vessel prior to hydrostatic testing.
Section 16.3.4

Vertical vessels tested in horizontal position are supported such that


32-SAMSS-004,
B14 primary stresses in any part of the vessel do not exceed 90% of 
Section 16.3.11
minimum specified yield strength of the vessel material.

Horizontal vessels shall be tested while resting on their permanent 32-SAMSS-004,


B15
support saddles without additional supports or cribbing. Section 16.3.12

Equipment or parts that are clad shall be hydrotested with water having 32-SAMSS-031,
B16
chloride content not greater than 50 ppm. Para. 10.2.1

 J acketed Vessel exams & hydrotest sequence are planned and detailed
in design & during hydrotesting (per test procedure).
A) Inner vessel construction & hydrotesting is completed prior to outer Best P ractice
B17  jacket installation and hydrotesting. (Project Quality
B) Construction sequence allows 100% visual inspection of welds during Plan)
hydrotest. J acket design & installation is carefully planned.
[Reference: ASME VIII, UG-99 sect. (e)]

REMARKS:

REFERENCE DOCUMENTS:
1. SAES -A-004, General Requirements for Pressure Testing, (30 J une, 2003)
2. SAES -D-008, Repairs, Alterations, and Re-rating of Process Equipment (30 November, 2003)
3. SAES -L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)
4. 32-SAMSS-004, Manufacture of Pressure Vessels (29 December 2004)
5. ASME Section VIII, Division 1 - Rules for Construction of Pressure Vessels (2002 Edition)
6. ASME S ection VIII, Division 2 - Rules for Construction of Pressure Vessels, Alternative Rules (2002 Edition)

Page 2 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARA MCO INSPECTION CHECKLIS
Pre-Test Inspection of Vessels (Pressure Vessels, Fin Fan
SAIC-A-2025 25-May-05 MECH-
Coolers, etc)
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

0 0 0

ITEM
 ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection:  T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed  T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved:  T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FAILED

Page 3 of 3