Professional Documents
Culture Documents
DATE
APPROVED
TESTING (AUT) QR NUMBER
In-Process Verification of Techniques & Procedure
IC-AUT-001 SAS-SGCP-NDE-00
Impementation of AUT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
SATIP-NDT-UT-01 3.5
SAUDI ARAMCO INSPECTION LEVEL
W**
CONTRACTOR INSPECTION LEVEL
W**
YES
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Resume of AUT personnel were submitted to Saudi Aramco for project SAEP-1142
A2
approval prior to commencing AUT activity SCH-Q
ASTM-E1961-11
Calibration Block : Reference standard shall be manufactured
Para 7.5 SAL-
from a section of unflawed project-specific line pipe supplied
A6 TECH-SOP-AUT-004-
by the contracting agency. Block shall be made according to ASTM-E1961
2018 Rev.01 Para
Annex A3.
8.1
Calibration Confirmation :
SAES-W-011
Calibration check are made on the basic calibration block to verify that
A7 Para17.1.1 SAES-
distance range points and sensitivity setting(s) are not changed.(ASME,
W-013 Para 15.3.2
Section V, Article 4 Para. T-466.1)
B Procedure Requirements
A technique summary stating beam angles, wave types, search unit
ASTM-E 1961-11
B1 frequencies, beam sizes and profiles with sketches for each geometry to be
Para 6.7.7
examined.
Provide permanent copy of the scans in an easily interpretable format to ASTM-E 1961-11
B2
meet archival and audit needs Para 6.7.9
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
Independently loaded ultrasonic search units mounted in an array that ASTM-E 1961-11 Para
B3
provides independent examination of the weld from both sides. 6.7.3
C Examination Requirements
The overall dynamic range shall be at least 40 dB. Acceptability of a system to
produce a standardization chart or record will be based on its ability to
SAL-TECH-SOP-AUT-
discriminate examination zones typical of those described in attached
C1 004-2018 Rev.01 Para
technique sheet. This will be demonstrated by signals from adjacent zones
7.5
being at least 6 dB and not more than 14 dB lower than from the zone for
which a search unit channel is standardized for.
Each weld shall be identified by a unique number, a “0” mark and arrow,
ASTM-E1961-11 Para
C3 designating start point and direction of travel. The
10.1
mark shall not interfere with scanning.
ENCODER CALIBRATION :
Prior to project start, and once per shift thereafter (minimum), the encoder SAL-TECH-SOP-AUT-
C5
accuracy shall be verified capable of measuring pipe circumference within 004-2018 Para 10.10
±10mm.
SAL-TECH-SOP-AUT-
C7 Acceptance criteria to be applied as per approved AUT procedure 004-2018 Rev.01
Para 12
REMARKS:
AUT caariedout no. of welds -
REFERENCE DOCUMENTS:
1. ASTM-E-1961-11 & SAL-TECH-SOP-AUT-004-2018 Rev.01
2. SAEP-1142--Qualification of Non-Saudi Aramco NDT Personnel (4 Dec. 2014)
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: QC Record
T&I Witnessed Work Verified
Name, Initials and Reviewed
Name, Initials and Date:
Date: