ANALYSIS COST OF THE PROJECT
Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 1-15 MAY 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 20.00 - - - Rp 24,140,000
2 Additive Sika,NN : -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 20.00 - - - Rp 24,140,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 20.00 4.00 14.00 26.00
K.225 - .0 - - -
K.300 - .0 - - - * Jumlah Potongan Denda
Total 4.00 14.00 26.00 * Total Pembayaran Rp 24,140,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-31 MAY 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 35.00 - - - Rp 42,245,000
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 35.00 - - - Rp 42,245,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 35.00 7.00 24.50 45.50
K.225 - .0 - - -
K.300 - .0 - - - * Jumlah Potongan Denda
Total 7.00 24.50 45.50 * Total Pembayaran Rp 42,245,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Jun-22
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT
Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 1-15 JUNE 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 30.00 - 76.00 - Rp 151,274,000
2 Additive Sika,NN : -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 30.00 - 76.00 - Rp 151,274,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 30.00 6.00 21.00 39.00
K.225 - .0 - - -
K.300 76.00 31.16 54.26 81.40 * Jumlah Potongan Denda
Total 37.16 75.26 120.40 * Total Pembayaran Rp 151,274,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-30 JUNE 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 61.00 - 65.00 - Rp 172,037,000
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 61.00 - 65.00 - Rp 172,037,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 61.00 12.20 42.70 79.30
K.225 - .0 - - -
K.300 65.00 26.65 46.41 69.62 * Jumlah Potongan Denda
Total 38.85 89.11 148.92 * Total Pembayaran Rp 172,037,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Jul-22
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 1-15 JULY 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 10.00 - 5.00 Rp 19,640,000
Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 10.00 - 5.00 - Rp 19,640,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 10.00 2.00 7.00 13.00
K.225 - .0 - - -
K.300 5.00 2.05 3.57 5.36 * Jumlah Potongan Denda
Total 4.05 10.57 18.36 * Total Pembayaran Rp 19,640,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-31 JULY 2022 - ETP Project No. : CWB-
Date : 13-Sep-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 30.00 - 575.00 Rp 906,760,000
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,207,000
K.225 = Rp 1,433,000 * Jumlah Pembayaran Total 30.00 - 575.00 - Rp 906,760,000
K.300 = Rp 1,514,000
K.350 = Rp 1,570,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 30.00 6.00 21.00 39.00
K.225 - .0 - - -
K.300 575.00 235.75 410.55 615.83 * Jumlah Potongan Denda
Total 241.75 431.55 654.83 * Total Pembayaran Rp 906,760,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Agu-22
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT
Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 1-15 AUG 2022 - ETP Project No. : CWB-
Date : 22-Oct-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 70.00 - 70.00 - Rp 200,550,000
2 Additive Sika,NN : -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total 70.00 - 70.00 - Rp 200,550,000
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 70.00 14.00 49.00 91.00
K.225 - .0 - - -
K.300 70.00 28.70 49.98 74.97 * Jumlah Potongan Denda
Total 42.70 98.98 165.97 * Total Pembayaran Rp 200,550,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-31 AUG 2022 - ETP Project No. : CWB-
Date : 22-Oct-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 100.00 - 330.00 - Rp 651,050,000
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total 100.00 - 330.00 - Rp 651,050,000
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 100.00 20.00 70.00 130.00
K.225 - .0 - - -
K.300 330.00 135.30 235.62 353.43 * Jumlah Potongan Denda
Total 155.30 305.62 483.43 * Total Pembayaran Rp 651,050,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Sep-22
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT
Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 1-15 SEPT 2022 - ETP Project No. : CWB-
Date : 28-Oct-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. 52.00 - 304.00 - Rp 548,400,000
2 Additive Sika,NN : -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total 52.00 - 304.00 - Rp 548,400,000
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO 52.00 10.40 36.40 67.60
K.225 - .0 - - -
K.300 304.00 124.64 217.06 325.58 * Jumlah Potongan Denda
Total 135.04 253.46 393.18 * Total Pembayaran Rp 548,400,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Page: 1 of 2
Page: 1 of 2
Form no : MMP/F/10
Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-30 SEPT 2022 - ETP Project No. : CWB-
Date : 1-Nov-2022 Estimated By : Gusli
Material Needed
Labour Cost Calculation
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. - - 341.50 - Rp 541,277,500
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total - - 341.50 - Rp 541,277,500
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO - - - -
K.225 - .0 - - -
K.300 341.50 140.02 243.83 365.75 * Jumlah Potongan Denda
Total 140.02 243.83 365.75 * Total Pembayaran Rp 541,277,500

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

Manihar Sibuea GUSLI SEVENTINUS


Okt-22
Form no : MMP/F/10

Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 01-15 OCTOBER 2022- ETP Project No. : CWB-22
Date : 16-Nov-2022 Estimated By : Gusli
Material Needed
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg 1 ETP Notif. - - 135.00 - Rp 213,975,000
2 Additive Sika,NN : - Rp -
b. Concrete Redy Mix K.225
Semen : 373 Kg
Pasir : 705 Kg
Split : 1057 Kg

c. Concrete Redy Mix K.300


Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total - - 135.00 - Rp 213,975,000
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO - - - -
K.225 - .0 - - -
K.300 135.00 55.35 96.39 144.59 * Jumlah Potongan Denda
Total 55.35 96.39 144.59 * Total Pembayaran Rp 213,975,000

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

MANIHAR SIBUEA GUSLI SEVENTINUS


Page: 1 of 2
Form no : MMP/F/10

Issue :0
ANALYSIS COST OF THE PROJECT

Project Name : Suplai Concrete Ready Mix PT. MSWB Periode 16-31 JUNE 2022- ALL Mill Project No. : CWB-22
Date : 2-Nov-2022 Estimated By : Gusli
Material Needed
Item Material Name Specification Qty. Unit Weight.
1. Kebutuhan Material Untuk Pekerjaan 1M³ Beton 4. Costing Cntrl U/Pembayaran Outsource
a. Concrete Ready Mix B0 Cost Alocation Quality Concrete (M³)
No
Semen : 200 Kg Seksi Pengguna B0 K.225 K.300 K350
Pasir : 700 Kg A Lokasi Pemakian Concrete Susuai Cost Center
Split : 1300 Kg All Mill Notif. #REF! #REF! #REF! #REF! #REF!
1 #REF! 1008086784 #REF! #REF! #REF! #REF! #REF!
b. Concrete Redy Mix K.225 2 #REF! 1008091405 #REF! #REF! #REF! #REF! #REF!
Semen : 373 Kg 3 #REF! 1008096477 #REF! #REF! #REF! #REF! #REF!
Pasir : 705 Kg 4 #REF! 1008107420 #REF! #REF! #REF! #REF! #REF!
Split : 1057 Kg 5 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! 1008096908 #REF! #REF! #REF! #REF! #REF!
c. Concrete Redy Mix K.300
Semen : 410 Kg
Pasir : 714 Kg
Split : 1071 Kg

2. Biaya Operasional + Bahan / 1M³ (Out Sorce) Harga sesaui kontrak No:
BO = Rp 1,280,000
K.225 = Rp 1,504,000 * Jumlah Pembayaran Total #REF! #REF! #REF! #REF! #REF!
K.300 = Rp 1,585,000
K.350 = Rp 1,641,000 C Perhitungan Rincian Penalty/Denda sesuai Cost center
Additive = Rp 65,000 /m3
/
3. Kebutuhan Material Concrete Periode Berjalan
Pemakaian Kebutuhan Material
Mix Desgn
Concrete Semen (Ton) Pasir (Ton) Split (Ton)
BO #REF! #REF! #REF! #REF!
K.225 #REF! #REF! #REF! #REF!
K.300 #REF! #REF! #REF! #REF! * Jumlah Potongan Denda
Total #REF! #REF! #REF! * Total Pembayaran #REF!

Note : 1. Outsurce memakai 3 item material ( Semen, Pasir, Split ) Unit Head Prepared By

MANIHAR SIBUEA GUSLI SEVENTINUS


Page: 1 of 2