CONSOLIDATED CONSTRUCTORS
PERFORMANCE SUMMARY REPORT
(CPES REPORTS)
8TH RELEASE
(ON-GOING/COMPLETED PROJECTS)
FROM JANUARY 1, 2006- DECEMBER 30, 2008
BACKGROUND:
This report is prepared in connection with the REPORT COVERAGE:
implementation of Constructors Performance Evaluation System This report contains CPES rating and other project-related
(CPES) pursuant to Section 12, Annex E - Evaluation of information of on-going and completed foreign assisted (FA) and
Contractors Performance of the Implementing Rules and locally funded (LF) infrastructure projects being undertaken by
Regulations (IRR) of RA No. 9184 (Government Procurement either local, foreign or joint venture constructors. The projects
Reform Act). Item 4 - Submission and Dissemination of presented in these report covers: road, bridge, housing, building,
Evaluation Results of Section 12, specifically mandated PDCB to ports and harbor, irrigation and flood control, and water supply
consolidate the CPES evaluation results of all ongoing and projects.
completed projects and disseminate the same to all
offices/agencies/corporations concerned.
REPORT CONTENTS:
USES OF CPES INFORMATION:
The CPES rating and other information is designed to Presented in this report are the names of constructors
serve the information needs of the following: a) government arranged alphabetically with the corresponding project
agencies undertaking infrastructure projects; b) industry planners classification. Information available in this report comprises three
and decision makers, c) constructors, d) project owners, e) (3) parts, as follows: 1) Constructor General Information; 2)
banking and financing institutions, f) insurance companies, g) Project Data; and 3) CPES Rating.
consulting firms, h) professional associations, and i) embassies.
Information on contractors CPES ratings shall be used for Part 1 of the report includes the name of constructor/s and
the following purposes: a) Pre-qualification/Eligibility Screening of PCAB License Number.
Constructors; b) Awarding of Contracts; c) Project Monitoring and
Control; d) Issuance of Certificate of Completion; e) Policy
Formulation/Review; f) Industry Planning; and g) Granting of Information contained in Part 2 pertains to the project
Incentives/Awards, and in adopting measure to further improve name, Implementing Agency, contract amount, and status of
performance of contractors in the prosecution of government project (on-going or completed).
projects.
1
Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental,
safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.
SOURCES OF INFORMATION
Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and
Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST),
National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Pasig River Rehabilitation
Commission (PRRC), Bases Conversion Development Authority (BCDA), Polytechnic University of the Philippines (PUP), Development
Bank of the Philippines (DBP) and Philippine Tourism Authority (PTA) covering the period January 1, 2006 – December 30, 2008
As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter
may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other
Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular
information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.
For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned
implementing agencies listed below:
Melrose Pailma (DPWH) Wilfredo C. Borbor (DOTC) Arnaldo C. Reyes (DOST) Tess Pantalla (NIA)
Tel No. 304-3511 Tel No. 726-3508 Tel No. 837-2071 loc: 2120 Tel No. 927-0923
Ma. Otelia F. Eclavea (NHA) Arnold Villegas (PPA) Amy Gamay (PRRC) Bong Fortunado (BCDA)
Tel No. 928-4561 Tel No. 527-8356 loc: 356 Tel No. 433-3444 Tel No. 816-6666
Angela Israel (PUP) Marie Cielo Veran (DBP) Aniversario Partolan (PTA)
Tel No. 713-1488 Tel No. 818-9511 loc: 2632 Tel Nos: 523-5667 ; 525-3769
For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive
Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at
pdcb_ciap@yahoo.com.ph. You may access this report on this website http://www.gppb.gov.ph.
2
CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES
I. ASPECTS OF EVALUATION
1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood
Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power
Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project
accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be
subjected to just one (1) final visit.
2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing
Office reported 100% completion.
3
As approved by NEDA InfraCom
19 May 2005
During Construction Upon Completion
Criteria Maximum Rating Criteria Maximum Rating
4
III. CPES RATING & ITS QUALITATIVE DESCRIPTION
*CPES RATING
Ranges Rating Qualitative Description
>96% Outstanding
>89% but < 96% Very Satisfactory
>82% but < 89% Satisfactory
>75% but < 82% Unsatisfactory
< 75% Poor
*CPES RATING
Ranges Rating Qualitative Description
>90% Outstanding
>80% but < 90% Very Satisfactory
>70% but < 80% Satisfactory
>60% but < 70% Fair
< 60% Poor
5
*CAUSES OF DELAY
C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders
C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time
extension
6
*CAUSES OF DELAY
OTHER-RELATED PROBLEMS
*Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)
7
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
121 Construction
*78.00%
Corporation (Formerly: 121 21686 Const. of MPB NCR 3.821 C 0.280 0.200 0.300 - - - 78.00
Satisfactory
Construction)
121 Construction
Impvt. of MPB at Sta. Maria Agro- *96.50%
Corporation (Formerly: 121 21686 III 1.717 C 0.365 0.300 0.300 - - - 96.50
Industrial High School Outstanding
Construction)
*94.30%
2H2L Construction 16293 Conc. of Road @ Package 3-2 XI 0.565 C 0.343 0.300 0.300 - - - 94.30
Oustanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 1
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*86.20%
3K Builders 27277 Const. of Multi-Purpose Building I 0.480 C 0.362 0.200 0.300 - - - 86.20
V. Satisfactory
*87.50%
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S II 1.622 C 0.375 0.200 0.300 - - - 87.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 2
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
3-L Construction 16745 Concreting of Barangay Road V 0.550 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -
91.50%
3S Builders 18009 Completion of Drainage System VII 0.634 C 0.333 0.300 0.300 - - - 93.30
Outstanding
79.54%
4 A's Construction 9446 Conc. of Road II 1.926 C 0.326 0.200 0.300 - - - 82.60
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 3
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Impvt. of Bocaue-San
*84.70%
722 Construction 21923 Jose Road, Tumana & Parada III 3.807 C 0.347 0.200 0.300 - - - 84.70
V. Satisfactory
Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 4
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Maintenance of Bigaa-
*86.10%
722 Construction 21923 Plaridel via Bulacan & Malolos III 4.957 C 0.361 0.200 0.300 - - - 86.10
V. Satisfactory
Road (Barihan Section)
Impvt./Dredging/Rehab. of
80.26%
747 Builders & Trader 16892 Baybay Sapa (along Lopezville IV-A 4.797 C 0.250 0.300 0.300 - - - 85.00
V. Satisfactory
Subd.)
Rehab./Impvt. of Manggahan
747 Builders & Trader 16892 IV-A 14.367 O 0.378 0.180 0.100 0.008 0.037 0.100 80.30 -
Floodway Eastbank
Rehab./Impvt. of Manggahan
747 Builders & Trader 16892 IV-A 14.368 O 0.321 0.300 0.100 0.030 0.037 0.100 88.80 -
Floodway Eastbank
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 5
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 6
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of Naguilian-San
85.16%
A. De Guia Construction 18228 Marcelino Road (Sitio Kasisiitan- II 10.031 C 0.281 0.300 0.300 - - - 88.10
V. Satisfactory
Alibadabab E/S Sect.)
*75.80%
A. De Guia Construction 18228 Regravelling of Various FMR II 0.919 C 0.258 0.200 0.300 - - - 75.80
Satisfactory
Widening of Ballacayu-Simanu 75.71%
A. De Guia Construction 18228 II 2.751 C 0.270 0.200 0.300 - - - 77.00
Road Satisfactory
A. Munas Integrals Builders Const./Rehab. of MPB @ Block *94.70%
32003 NCR 3.803 C 0.347 0.300 0.300 - - - 94.70
& Trading 4, Kaingin 1 Outstanding
Rehabilitation of Electrical
A. Seva Construction 20124 PUP 1.389 O 0.340 0.240 0.100 0.030 0.029 0.100 83.90 -
System Masscom Theater
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 7
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.69%
A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. VII 0.415 C 0.382 0.100 0.300 - - - 78.20
V. Satisfactory
Const. of 2 Storey, 6 CL Sch. 94.18%
A.A. De Vera Construction 6191 VII 4.175 C 0.367 0.300 0.300 - - - 96.70
Bldg. @ Lawis E/S Outstanding
Repair/Rehabilitation of Sewer
A.C. Cunanan Construction 20752 and Drainage System at PUP 1.241 O 0.400 0.300 0.100 0.030 0.019 0.100 94.90 -
Northwing and Eastwing
Repair/Rehabilitation of Sewer
A.C. Cunanan Construction 20752 and Drainage System at PUP 1.241 O 0.385 0.300 0.100 0.030 0.038 0.100 95.30 -
Northwing and Eastwing
Repair/Rehabilitation of Sewer
100.00%
A.C. Cunanan Construction 20752 and Drainage System at PUP 1.241 C 0.400 0.300 0.300 - - - 100.00
Outstanding
Northwing and Eastwing
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 8
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Replacement of Caliban
A.C. Rivero Construction & Bridge (Phase 2) along Bacolod- 90.22%
5122 VI 7.289 C 0.379 0.300 0.300 - - - 97.90
Dev't. Corporation Murcia-D.S. Benedicto-San Outstanding
Carlos City National Road
*84.30%
A.D. Construction 6946 Const. of MPB IV-A 0.944 C 0.343 0.200 0.300 - - - 84.30
V. Satisfactory
*84.30%
A.D. Construction 6946 Const. of Sch. Bldg. at Nato E/S V 0.372 C 0.372 0.171 0.300 - - - 84.30
V. Satisfactory
77.82%
A.D. Construction 6946 Rehab. of Panganiban Drainage V 4.212 C 0.288 0.300 0.300 - - - 88.80
Satisfactory
A.D. Gonzales Jr.
Const. of BGHMC Acute
Construction and Trading 10012 CAR 21.206 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -
Psychiatric Unit Bldg.
Company Inc.
A.D. Gonzales Jr.
Impv't./Rehab. of San Ahustin-
Construction and Trading 10012 III 4.752 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -
San Joaquin Road
Company Inc.
82.80%
A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road VI 18.918 C 0.228 0.300 0.300 - - - 82.80
V. Satisfactory
Const. of Bugasong-Valderrama
81.05%
A.D.P. Const. & Supply 3466 Road, Liaures Section (Alternate VI 14.426 C 0.335 0.087 0.300 - - - 72.20
V. Satisfactory
Route)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 9
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 10
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
A.L. Gantuangco
30872 Benolho CIS NIA 3.720 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
Construction
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 11
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
A.M. Oreta & Co. Inc. / IBC Const. of Ibajay Bridge & 78.74%
JV-05-011 VI 138.616 C 0.370 0.278 0.000 - - - 64.80
Int'l Builders Corp. (JV) Approaches Satisfactory
*86.70%
A.M. Robles Construction 28056 Conc. of FMR, Brgy. Colo I 1.926 C 0.367 0.200 0.300 - - - 86.70
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 12
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 13
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Rehab. of Iwahig-
A.R. Lustre Jr. 82.80%
7680 Tacduan Diversion Road IV-B 11.430 C 0.289 0.239 0.300 - - - 82.80
Construction V. Satisfactory
National Highway
*81.80%
A.R.L. Construction 27645 Conc. of Brgy. Road Caniogan III 0.956 C 0.318 0.200 0.300 - - - 81.80
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 14
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 15
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Abulug Construction
5593 Const. of Colony Road II 2.894 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Company, Inc.
Abulug Construction *71.00%
5593 Const. of Dagupan MPB CAR 0.442 C 0.226 0.184 0.300 - - - 71.00
Company, Inc. Satisfactory
Abulug Construction Const. of Public Market (Phase
5593 II 1.446 O 0.356 0.240 0.100 0.030 0.033 0.100 85.90 -
Company, Inc. II)
Abulug Construction 79.26%
5593 Const. of Punta Seawall II 0.298 C 0.310 0.200 0.300 - - - 81.00
Company, Inc. Satisfactory
Abulug Construction Const./Completion of Cabaruan *74.90%
5593 II 0.383 C 0.178 0.271 0.300 - - - 74.90
Company, Inc. Bridge Satisfactory
Abulug Construction
5593 Lucban River Control Project II 3.858 O 0.371 0.240 0.100 0.022 0.023 0.100 85.60 -
Company, Inc.
Abulug Construction
5593 Lucban River Control Project II 3.858 O 0.333 0.160 0.100 0.030 0.033 0.133 78.90 -
Company, Inc.
Abulug Construction
5593 Matuno- Sto. Domingo CIS NIA 3.126 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -
Company, Inc.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 16
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Restoration of Damaged
Abulug Construction *81.60%
5593 Roadways along BAMR (Sinking II 1.392 C 0.316 - 0.500 - - - 81.60
Company, Inc. V. Satisfactory
Pavement @ Logac Section)
Conc. of Paco-Roxas-Arakan
ACJ Construction *76.70%
10635 Valley National Road, (Luhong- XII 12.751 C 0.365 0.102 0.300 - - - 76.70
Resources Satisfactory
Kiyaab Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 17
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 18
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Acme Builders Corporation 6442 Rehab. of Mahayahay Creek VIII 6.709 O 0.360 0.160 0.100 0.020 0.023 0.200 86.30 -
Completion/Continuation of
Unfinished/Ongoing Bridges,
Adelfa & Charlie 82.15%
11569 Calaguise Steel Bridge along VIII 34.810 C 0.338 0.200 0.300 - - - 83.80
Enterprises V. Satisfactory
Sambolawan-Calaguise-Calubian
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 19
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion/Impvt./Rehab. of
Adfil Corporation 14437 XIII 26.210 O 0.375 0.240 0.100 0.030 0.059 0.100 90.40 -
Libertad Bridge & Approaches
Completion/Impvt./Rehab. of 88.70%
Adfil Corporation 14437 XIII 26.210 C 0.348 0.200 0.300 - - - 84.80
Libertad Bridge & Approaches V. Satisfactory
Conc. of Dapa-Junction
Adfil Corporation 14437 XIII 28.452 O 0.373 0.205 0.100 0.030 0.065 0.100 87.30 -
Cancohoy Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 20
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*96.00%
Adfil Corporation 14437 Const. of Taguibo Flood Control XIII 14.413 C 0.360 0.300 0.300 - - - 96.00
Outstanding
90.92%
Adfil Corporation 14437 Const. of Waloe Bridge XIII 9.199 C 0.339 0.200 0.300 - - - 83.90
Outstanding
Rehab./Reconst. of Damaged
Adfil Corporation 14437 Paved National Road along XIII 9.634 O 0.307 0.234 0.100 0.030 0.065 0.100 83.60 -
Agusan-Misamis Road
Rehab./Reconst. of Damaged
Adfil Corporation 14437 Paved National Road along XIII 9.635 O 0.358 0.200 0.100 0.030 0.065 0.100 85.30 -
Agusan-Surigao Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 21
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 22
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*98.00%
Adroit Construction 11169 Const. of 2 CL @ Cumabol E/S III 0.749 C 0.380 0.300 0.300 - - - 98.00
Outstanding
*88.60%
AG Construction 7921 Conc. of Wright Park Grounds CAR 0.936 C 0.286 0.300 0.300 - - - 88.60
V. Satisfactory
*78.80%
Agafer Construction 7912 Conc. of Centro 2 II 0.963 C 0.284 0.204 0.300 - - - 78.80
Satisfactory
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.334 0.160 0.100 0.022 0.028 0.200 84.40 -
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 23
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Widening of Matin-ao
81.82%
AJYSC Marketing 26924 Bridge & Widening of XII 3.848 C 0.351 0.115 0.300 - - - 76.60
V. Satisfactory
Approaches
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 24
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 25
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Concreting of Iligan-Bukidnon
Al Fahdel Construction &
17953 Road Bonbonan Digkilaan & X 2.238 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -
Engineering
Rogongon Sections,
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 26
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 27
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Proposed Repair/Rehab. of
ALE Builders Construction *97.50%
5180 Epifanio Delo Santos Elem. NCR 1.444 C 0.375 0.300 0.300 - - - 97.50
and Development Corp. Outstanding
School
Conc. of By-Pass Road & Lined
Alebon Genuine 67.16%
26300 Canal w/ spillway along By Pass X 4.089 C 0.170 0.300 0.000 - - - 47.00
Merchandising Fair
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 28
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc./Widening of Banaue-
Mayoyao-Aguinaldo-A. Lista *61.00%
Alfalfa Construction 29712 CAR 1.901 C 0.310 0.000 0.300 - - - 61.00
Bdry. Road (Ibayong-Guihob Fair
Section)
Nueva Vizcaya-Ifugao-Mt.
Alfalfa Construction 29712 CAR 7.590 O 0.335 0.240 0.100 0.010 0.020 0.067 77.20 -
Province Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 29
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.74%
Alfrego Builders & Supply 19284 Conc. of Road at Alambre XI 0.933 C 0.342 0.300 0.300 - - - 94.20
V. Satisfactory
*92.40%
Alfrego Builders & Supply 19284 Conc. of Road at Mercedes XI 0.935 C 0.324 0.300 0.300 - - - 92.40
Outstanding
Conc. of Road from Davao-
Agusan National Road Jct. *93.30%
Alfrego Builders & Supply 19284 XI 1.882 C 0.333 0.300 0.300 - - - 93.30
passing through Iliong up to Outstanding
Purok Communal
*83.40%
Algimar Construction 15232 Conc. of Lubi-Binoog Road IV-B 9.398 C 0.334 0.200 0.300 - - - 83.40
V. Satisfactory
78.28%
Algimar Construction 15232 Concreting of Moyot Street V 4.624 C 0.362 - 0.500 - - - 86.20
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 30
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*71.30%
Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod V 9.597 C 0.213 0.200 0.300 - - - 71.30
Satisfactory
*85.90%
Algimar Construction 15232 Const. of Sta. Cruz NHS V 0.441 C 0.359 0.200 0.300 - - - 85.90
V. Satisfactory
Gravelling of San Fernando *72.00%
Algimar Construction 15232 V 1.841 C 0.220 0.200 0.300 - - - 72.00
South Road Satisfactory
79.84%
Algimar Construction 15232 Repair of Calapi Bridge V 1.898 C 0.381 0.100 0.300 - - - 78.10
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 31
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP 5: Impvt./Conc. of Surigao
Algon Engineering Sur-Davao Oriental Coastal Road
270 XI 172.481 O 0.380 0.239 0.100 0.030 0.055 0.100 90.40 -
Construction Corporation (Manay-Boston) Caraga-
Baganga Section
Impv't./Conc. of La Fortuna
Algon Engineering 88.56%
270 Tagum Terminal-Capitol, XI 34.314 C 0.303 0.300 0.300 - - - 90.30
Construction Corporation V. Satisfactory
Canocotan Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 32
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.90%
Alleyway Construction 15310 Const. of MPB @ So. Cabading IV-A 1.437 C 0.346 0.213 0.300 - - - 85.90
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 33
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 34
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 35
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion (Impvt./Conc.
Alraf Construction & Paving) of Licomo-Quiniput 88.27%
17297 IX 36.137 C 0.365 0.200 0.300 - - - 86.50
Enterprises Road, Segment II Manguso- V. Satisfactory
Mulawin Section
Impvt./Conc. of Isabela-Maluso
Alraf Construction & 80.61%
17297 National Road, Bañas-Garlayan IX 7.605 C 0.219 0.300 0.300 - - - 81.90
Enterprises V. Satisfactory
Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 36
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 37
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road XI 19.280 O 0.338 0.288 0.100 0.008 0.050 0.067 85.10 -
Widening of Agusan-Davao
Alzam Enterprises 19113 XI 28.921 O 0.374 0.300 0.100 0.030 0.060 0.067 93.10 -
Road, Tibungco Section
Conc. of Kidapawan-Calunasan-
Alzen Engineering & M'lang National Road inc. ROW *94.70%
13911 XII 7.314 C 0.347 0.300 0.300 - - - 94.70
Construction Supplies Acquisition (Magsaysay- Outstanding
Kalaisan Section)
Conc. of Kidapawan-Magpet-
Alzen Engineering & 85.58%
13911 Pangao-An Road (Sumawan- XII 11.338 C 0.270 0.287 0.300 - - - 85.70
Construction Supplies V. Satisfactory
Gubatan Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 38
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 39
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 40
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
APB Construction 17055 Completion of MPB CAR 1.908 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 41
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
APD Construction 17467 Addalam River Irrigation Project NIA 7.466 O 0.3369 0.1871 0.03 0.03 0.041 0.2 82.48 -
Conc. of Ilagan-Delfin-Albano-
*96.30%
APD Construction 17467 Mallig National Road, Olango II 7.719 C 0.363 0.300 0.300 - - - 96.30
Outstanding
Section
Conc. of Ilagan-Delfin-Albano-
89.78%
APD Construction 17467 Mallig National Road, Villa II 11.868 C 0.335 0.300 0.300 - - - 93.50
V. Satisfactory
Cacho Section
Conc. of Naguilian-San
*87.80%
APD Construction 17467 Marcelino Road (Alibadbad II 9.648 C 0.376 0.202 0.300 - - - 87.80
V. Satisfactory
Section)
*91.00%
APD Construction 17467 Conc. of Villa Sur Brgy. Road II 2.720 C 0.310 0.300 0.300 - - - 91.00
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 42
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Impvt./Rehab. of Cordon-
Diffun-Maddela-Aurora (CDMA)
*84.50%
APD Construction 17467 Road & ist related Roads & II 0.959 C 0.345 0.200 0.300 - - - 84.50
V. Satisfactory
Bridges (Cab-Diffun Section)
Cualo Blvd Road
Impvt. of Cordon-Diffun-Maddela-
Aurora (CDMA) Bdry. Road & its *91.40%
APD Construction 17467 II 2.604 C 0.371 0.243 0.300 - - - 91.40
related Roads & Bridges (Rehab. Outstanding
Of Ramos Bridge Phase II)
Impvt./Conc. of Cordon-Aurora
*92.80%
APD Construction 17467 Bdry. Road (Maddela Jct.- II 13.274 C 0.366 0.262 0.300 - - - 92.80
Outstanding
Dumabato Section)
*82.90%
Aqualine Construction 11555 Allen CIS (Irrigation) NIA 2.547 C 0.353 0.176 0.300 - - - 82.90
V.Satisfactory
Aqualine Construction 11555 Const. of Limopoca CIP NIA-VII 3.232 C 0.321 0.300 0.300 - - - 92.10 92.10%
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 43
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 44
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. of Pias-Currimao-Balacad
Arcinue Commercial 6746 I 31.831 O 0.331 0.293 0.100 0.024 0.037 0.100 88.50 -
Road, Brgy. Paoay Section
Impvt./Repair/Rehab. of *86.00%
Arcinue Commercial 6746 I 9.468 C 0.360 0.200 0.300 - - - 86.00
Pangasinan-Zambales Road V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 45
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.11%
ARN Builders 18930 Conc. of Altavas Diversion Road VI 16.521 C 0.328 0.200 0.300 - - - 82.80
V. Satisfactory
ARN Builders 18930 Const. of Banica Bridge VI 12.540 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -
81.70%
ARN Builders 18930 Const. of Dumalag Bridge VI 16.494 C 0.341 0.114 0.300 - - - 75.50
V. Satisfactory
CP 5: Impvt./Conc. of Kapalong-
ARN Builders 18930 Talaingod-Valencia Bukidnon XI 172.550 O 0.400 0.300 0.100 0.024 0.055 0.067 94.60 -
Road, Brgy. Sto. Niño Phase II
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 46
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconstruction of Aklan
ARN Builders 18930 VI 19.283 O 0.330 0.240 0.100 0.030 0.055 0.100 85.50 -
East Road
Rehab./Reconstruction of Aklan
ARN Builders 18930 VI 19.283 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -
East Road
Asanco General
Const. of Multi-Purpose 83.61%
Merchandising & 30517 IV-B 0.465 C 0.390 0.221 0.300 - - - 91.10
Building, Poblacion V. Satisfactory
Construction
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 47
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 48
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Atlantic Construction 24232 Const. of Sta. Maria MPB II 3.816 O 0.308 0.240 0.100 0.030 0.037 0.067 78.20 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 49
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*76.30%
Atlantic Construction 24232 Repair/Rehab. of Sta. Maria E/S II 0.380 C 0.347 0.116 0.300 - - - 76.30
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 50
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*89.60%
B. Bernardo Construction 6196 Rehab. of Amang Rodriguez Ave. NCR 14.343 C 0.319 0.277 0.300 - - - 89.60
V. Satisfactory
*86.40%
B. Bernardo Construction 6196 Rehab. of Sumulong Highway NCR 19.220 C 0.266 0.298 0.300 - - - 86.40
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 51
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 52
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 53
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
74.18%
B.E. Construction 2730 Conc. of Concepcion-Ajuy Road VI 4.761 C 0.252 0.100 0.300 - - - 65.20
Satisfactory
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.087 O 0.370 0.225 0.100 0.015 0.040 0.100 85.00 -
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.667 O 0.250 0.240 0.100 0.022 0.056 0.100 76.80 -
B.E. Construction 2730 Const. of Lanag River Control VI 14.450 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 54
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
B.G. Giron Construction & Const. of MPB & other Facilities *90.30%
15197 III 1.422 C 0.303 0.300 0.300 - - - 90.30
Supply @ Brgy. Rizal Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 55
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
84.94%
B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk XIII 1.912 C 0.364 0.204 0.300 - - - 86.80
V. Satisfactory
Rehab./Reconst. of Damaged
86.36%
B.S.U. Construction, Inc. 8457 Pavement along Surigao-Davao XIII 4.798 C 0.364 0.199 0.300 - - - 86.30
V. Satisfactory
Coastal Road, Lingig Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 56
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*88.70%
Bap Construction 16215 Conc. of Road at Brgy. Luta Sur IV-A 0.482 C 0.371 0.216 0.300 - - - 88.70
V. Satisfactory
Conc. of San Juan-San Andres *81.10%
Bap Construction 16215 IV-A 1.927 C 0.311 0.200 0.300 - - - 81.10
Road V. Satisfactory
Construction of 80.35%
BAQUE Corporation 15235 BCDA 103.233 O 0.365 0.300 0.000 - - - 66.54
Ramps/Approaches in Tarlac V.Satisfactory
Const. of Abaton-Maidlang II
Barman Construction Corp. 7974 IVB 9.615 O 0.313 0.300 0.100 0.023 0.042 0.100 87.80 -
Bridge
Const./Rehab. of Mahabang
88.78%
Barman Construction Corp. 7974 Parang FMR, Mahabang Parang IV-B 17.832 C 0.310 0.300 0.300 - - - 91.00
V. Satisfactory
ARC
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 57
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
BBC Construction
(Formerly: BBC Sand & 16510 Replacement of Matabao Bridge XIII 9.468 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -
Gravel)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 58
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Impv't. of Batangas-Lobo
75.32%
Bedun Construction 15130 Road, Malapad na Parang-San IV-A 9.497 C 0.315 0.200 0.300 - - - 81.50
Satisfactory
Miguel Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 59
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Concrete Paving of
Berson's Construction & 85.98%
31181 Camiling-Wawa Road & Drainage I 9.641 C 0.288 0.276 0.300 - - - 86.40
Trading V. Satisfactory
Structures
Impvt./Conc. of Pangasinan-
80.12%
Bet Construction & Supply 31764 Tarlac Road (Socony Jct.- I 9.453 C 0.294 0.200 0.300 - - - 79.40
V. Satisfactory
Lingayen Section)
*73.30%
Beta Construction 9829 Conc. of Brgy. Road @ Balogo V 0.800 C 0.244 0.189 0.300 - - - 73.30
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 60
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Multi-Purpose
92.24%
Better Work Construction 24432 Bldg., DENR Regional office XII XII 1.428 C 0.368 0.225 0.300 - - - 89.30
Outstanding
Brgy. Zone IV
Improvement/Concreting of
Bevel Construction 16423 X 0.920 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -
Cantaan Barangay Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 61
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Installation of Water
System a)Deepwell, Brgy.
Bigfoot Construction and *86.70%
24769 Palanas, Tanjay City b)Water VII 0.996 C 0.267 0.300 0.300 - - - 86.70
Supply V. Satisfactory
Supply, Brgy. Penabonan,
Mabinay
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 62
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Ilagan-Bagao-Palanan
*93.70%
BMJ Construction 14571 National Road (Fuyo-Rang-ayan- II 9.360 C 0.345 0.292 0.300 - - - 93.70
Outstanding
Ayan Gap)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 63
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
*85.30%
BMK Construction 8292 National Road, Alaminos-Lucap I 7.599 C 0.353 0.200 0.300 - - - 85.30
V. Satisfactory
Road
Repair/Rehabilitation of
Drainage System along old
85.19%
BMK Construction 8292 Judge de Venecia Sr. Ave., 3 I 4.821 C 0.351 - 0.500 - - - 85.10
V. Satisfactory
Rows Cross Drainage along
Calasiao Road
BN Builders & Construction 83.62%
28232 Concreting of Purok 3, Patin-ay XIII 2.825 C 0.203 0.200 0.300 - - - 70.30
Supply V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 64
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 65
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 66
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Dualing-New-Panay-
Borderline Construction 79.42%
24433 Midsayap Road (Sta. Cruz- XII 4.779 C 0.358 0.126 0.300 - - - 78.40
and Supply Satisfactory
Katalicanan Section)
Borderline Construction *87.30%
24433 Const. of MPB XII 0.287 C 0.334 0.239 0.300 - - - 87.30
and Supply V. Satisfactory
Borderline Construction *90.00%
24433 Const. of Water System XII 0.467 C 0.385 0.215 0.300 - - - 90.00
and Supply V. Satisfactory
Rehab./Impvt. of Bukidnon-
Borderline Construction *82.90%
24433 Cotabato Road, Poblacion XII 4.653 C 0.329 0.200 0.300 - - - 82.90
and Supply V. Satisfactory
Section
BPDG Construction & Const. of MPB at Brgy. San Jose *95.70%
16167 III 3.612 C 0.357 0.300 0.300 - - - 95.70
Trading Proper Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 67
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 68
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 69
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Replacement of
Brostan Construction & 71.44%
12360 Damaged Bridges along CDMA II 13.472 C 0.400 0.300 0.000 - - - 70.00
Development Satisfactory
Road, Pinaripad Bridge
Repair/Rehab. of Farm to Market
Brostan Construction & 96.30%
12360 Road, Brgy. San Leonardo- II 4.054 C 0.363 0.300 0.300 - - - 96.30
Development Outstanding
Pinaripad
Replacement of Laoag Bridge
Brostan Construction & 85.36%
12360 along Jct. Ipil-Quirino Bdry. II 4.792 C 0.338 0.200 0.300 - - - 83.80
Development V. Satisfactory
Road
*84.15%
BS Chang Builders 22745 DBM South Linear Park PRRC 7.088 C 0.46 0.0815 0.300 - - - 84.15
V. Satisfactory
*92.00%
BS Chang Builders 22745 DBM South Linear Park III PRRC 2.235 C 0.42 0.200 0.300 - - - 92.00
Outstanding
98.90%
Busilac Builders Inc. 7701 ACA Bldg. 2 DOST 9.651 C 0.389 0.300 0.300 - - - 98.90
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 70
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Rehab. of Quirino
C & F Construction & Highway, Gumaoc-Tungkong- 87.62%
3509 III 9.433 C 0.456 - 0.500 - - - 95.60
Development Corporation Mangga, San Jose Del Monte V. Satisfactory
City.
Conc. of Laoang-Calomotan
C D U Construction 13915 VIII 19.065 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 71
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*91.20%
C. Brotonel Construction 9727 Impvt. of MPB IV-A 0.192 C 0.312 0.300 0.300 - - - 91.20
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 72
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 73
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
C.C.M. Construction 11043 Const. Brgy. Lumangog Road VII 2.806 O 0.283 0.225 0.100 0.030 0.038 0.100 77.60 -
68.10%
C.E. Padilla Construction 11278 PUP Linear Park Project PRRC 19.989 C 0.311 0.270 0.100 - - - 68.10
Fair
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 74
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.70%
C.L. Carandang Enterprises 29494 Rehab. of Dayao-Bugtong FTMR V 4.791 C 0.347 0.300 0.300 - - - 94.70
Outstanding
*90.00%
C.L. Carandang Enterprises 29494 Rehab./Impvt./Const. of DEO V 2.886 C 0.400 0.200 0.300 - - - 90.00
V. Satisfactory
Replacement/Reblocking of
82.48%
C.L. Carandang Enterprises 29494 Concrete Pavement along V 9.488 C 0.298 0.300 0.300 - - - 89.80
V. Satisfactory
Masbate-Cataingan Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 75
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
C.M. Dancel Construction &
12640 Nat'l Road, MNR, Maoini- I 18.963 O 0.400 0.300 0.100 0.015 0.020 0.100 93.50 -
Supply
Baduang Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 76
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 77
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CA Miguel Construction,
*82.60%
Incorporated (Formerly: 10221 Const. of MPB @ J.E. Pama St. NCR 0.373 C 0.326 0.200 0.300 - - - 82.60
V. Satisfactory
C.A. Miguel Const.)
Repair/Rehab. of Manila High *83.30%
Caana Construction 12905 NCR 0.962 C 0.333 0.200 0.300 - - - 83.30
Sch. V. Satisfactory
78.65%
Camia Construction 20506 Completion of Public Market II 1.096 C 0.328 0.239 0.300 - - - 86.70
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 78
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 79
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Conc. of Banaue-
88.20%
Carlyz Construction 19776 Mayoyao Alfonso Lista-Isabela CAR 1.895 C 0.378 0.200 0.300 - - - 87.80
V. Satisfactory
Boundary Road, Kinakin Section
*98.50%
Carry-on Construction 8014 Const. of MPB at Brgy. NBBS NCR 2.850 C 0.385 0.300 0.300 - - - 98.50
Outstanding
*84.00%
Carry-on Construction 8014 Const./Impvt. of MPB NCR 1.916 C 0.340 0.200 0.300 - - - 84.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 80
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Conc. of Banaue-
Carlyz Construction 19776 Mayoyao Alfonso Lista-Isabela CAR 1.895 O 0.400 0.300 0.100 0.000 0.019 0.050 86.90 -
Boundary Road, Kinakin Section
*81.10%
Casigayan Construction 26796 Const. of MPB, KASC (Phase I) CAR 0.945 C 0.316 0.195 0.300 - - - 81.10
V. Satisfactory
Cauayan United
Conc. of Ilagan-Delfin Albano-
Enterprises and Const.
JV-07-168 Mallig National Road (Manano II 19.290 O 0.372 0.225 0.100 0.010 0.047 0.100 85.40 -
Builders/Brostan Const. &
Section)
Dev. (JV)
Cauayan United
Conc. of Ilagan-Delfin Albano- *83.10%
Enterprises and 8816 II 9.648 C 0.335 0.196 0.300 - - - 83.10
Mallig Road (Olango Section) V. Satisfactory
Construction Builders
Cauayan United
Const. of 1 Cl Sch. Bldg. @ *84.00%
Enterprises and 8816 II 0.319 C 0.366 0.174 0.300 - - - 84.00
Daramuangan E/S V. Satisfactory
Construction Builders
Cauayan United
Const. of 5-Units Deep Well *76.00%
Enterprises and 8816 II 0.184 C 0.260 0.200 0.300 - - - 76.00
(Light Duty Type), Minate I Satisfactory
Construction Builders
Cauayan United
Enterprises and 8816 Const. of Flood Control Project II 4.821 O 0.360 0.160 0.100 0.010 0.047 0.200 87.70 -
Construction Builders
Cauayan United
Impvt./Rehab. Along Cabatuan- *84.80%
Enterprises and 8816 II 6.717 C 0.286 0.262 0.300 - - - 84.80
Enrile Road V. Satisfactory
Construction Builders
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 81
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Cauayan United
Impvt./Rehab. Along Gamu- *94.30%
Enterprises and 8816 II 9.646 C 0.343 0.300 0.300 - - - 94.30
Roxas Road Outstanding
Construction Builders
Cauayan United
Impvt./Rehab. of Baguio Country *88.50%
Enterprises and 8816 CAR 6.844 C 0.385 0.200 0.300 - - - 89.50
Club Km. 252+768-Km. 254+155 V.Satisfactory
Construction Builders
Cauayan United
Impvt./Rehab. of Cauayan- *90.00%
Enterprises and 8816 II 0.947 C 0.400 0.200 0.300 - - - 90.00
Cabatuan Road V. Satisfactory
Construction Builders
Cauayan United
Rehab. of FMR at Muñoz West- *86.70%
Enterprises and 8816 II 0.944 C 0.267 0.300 0.300 - - - 86.70
Sinamar Road V. Satisfactory
Construction Builders
Cavacon Corporation
Const. of Ditale Bridge and
(Formerly: Cagayan Valley 2622 III 50.474 O 0.338 0.300 0.100 0.024 0.054 0.100 92.00 -
Approaches, Brgy. Ditale
Const. Corp.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 82
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Cavacon Corporation
Const. of Ditale Bridge and
(Formerly: Cagayan Valley 2622 III 50.474 O 0.353 0.269 0.070 0.030 0.059 0.067 84.80 -
Approaches, Brgy. Ditale
Const. Corp.)
Cavacon Corporation
Rehabilitation/ Widening
(Formerly: Cagayan Valley 2622 IV-A 21.226 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -
(Concreting) of Paliparan Road
Const. Corp.)
Cavat Capitol
Conc. of Cagayan-Apayao
Merchandising & 3112 II 11.859 O 0.356 0.292 0.000 0.030 0.033 0.100 81.10 -
National Road, Tuao-Rizal Sect.
Construction
Cavat Capitol
Conc. of Cagayan-Apayao
Merchandising & 3112 II 11.859 O 0.287 0.240 0.050 0.030 0.033 0.067 70.70 -
National Road, Tuao-Rizal Sect.
Construction
Cavat Capitol
Conc. of Naruangan-Culong
Merchandising & 3112 II 6.266 O 0.319 0.240 0.050 0.030 0.033 0.067 73.90 -
Road
Construction
Contract Package I, Baguio-
Pangawan, Kayapa Section
Cavite Ideal International
under Cordillera Road
Const. & Development 5599 PJHL 1,562.663 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -
Improvement Project (Baguio-
Corp.
Aritao Road Improvement
Project)
Contract Package I, Baguio-
Pangawan, Kayapa Section
Cavite Ideal International
under Cordillera Road
Const. & Development 5599 PJHL 1,562.663 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -
Improvement Project (Baguio-
Corp.
Aritao Road Improvement
Project)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 83
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Replacement of Dilapidated
CBN Construction & Concrete/Concrete Paving of Jct. 90.92%
16851 VI 4.542 C 0.371 0.300 0.300 - - - 97.10
Supply Dan Enriave-Pontevedra By Pass Outstanding
Rd.
Replacement of Dilapidated
CBN Construction and Concrete/Concrete Paving of 80.42%
16851 VI 6.141 C 0.301 0.100 0.300 - - - 70.10
Supply Bago-Mailum-Mambucal-Canla- V. Satisfactory
on Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 84
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 85
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
79.16%
Cedan Construction 10172 Const. of Magsaysay Bridge I 4.799 C 0.365 0.300 0.300 - - - 96.50
Satisfactory
Rehab./Reconst. of Damaged
National Road, Pangasinan- *71.30%
Cedan Construction 10172 I 21.229 C 0.212 0.201 0.300 - - - 71.30
Zambales Road (Sual & Infanta Satisfactory
Sect.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 86
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Bambang-Kasibu-
Celso C. Ferrer Contractor 10643 Quezon-Solano Road (San II 47.758 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -
Fernando Sect.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 87
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Rehab./Impvt. of
Cesar T. Carpio Pambujan Circ. Road ,
20833 VIII 9.295 O 0.240 0.225 0.100 0.030 0.037 0.100 73.20 -
Construction Cababtoan-Cabarian-
Canjumadal Road
Const./Rehab./Impvt. of
Cesar T. Carpio Pambujan Circ. Road ,
20833 VIII 9.295 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -
Construction Cababtoan-Cabarian-
Canjumadal Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 88
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*97.50%
Charlz Construction 8709 Completion of MPB @ Brgy. 18 X 0.456 C 0.375 0.300 0.300 - - - 97.50
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 89
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of 3 Storey, 9 Cl
88.35%
Charlz Construction 8709 Secondary Sch. Bldg. @ Adlaon VII 5.711 C 0.364 0.300 0.300 - - - 96.40
V. Satisfactory
NHS
Const. of Covered Canal,
81.64%
Charlz Construction 8709 Misamis Oriental-Bukidnon- X 4.729 C 0.290 0.200 0.300 - - - 79.00
V. Satisfactory
Agusan Road
Const. of MPB Manolo Fortich
83.13%
Charlz Construction 8709 Municipal Hall Phase X, X 4.728 C 0.363 0.200 0.300 - - - 86.30
V. Satisfactory
Calanawan
Const. of Pedestrian Overpass
(Skywalk) across Imus St., near *90.00%
Charlz Construction 8709 VII 4.695 C 0.400 0.200 0.300 - - - 90.00
Sikatuna St. Jct., Brgy. Zapatera- V. Satisfactory
T. Padilla
Const. of Tertiary Sch. Bldg. 73.44%
Charlz Construction 8709 X 2.360 C 0.262 0.157 0.300 - - - 71.90
(NBCC Phase II) Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 90
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 91
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 92
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 93
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
China National
Constructional and
NO Banaoang Pump Irrigation USD 38.475
Agricultural Machinery NIA O 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -
LICENSE Project M
Import and Export
Corporation (CAMC)
Const./Impv't. of CP VIII,
China Road & Bridge SL2-SN- 94.22%
Bayawan-Kalumboyan Road RRNDP 211.007 C 0.368 0.300 0.300 - - - 96.80
Corporation 000479 Outstanding
Project, Sta. 0+000-Sta.17+369.88
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 94
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP 2, Catarman-Calbayog via
China State (Phils.) Lope de Vega Road under the 92.07%
FC-02-072 PJHL 643.720 C 0.349 0.300 0.300 - - - 94.90
Construction Eng'g. Corp. Arterial Road Links Development Outstanding
Project, Phase V
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 95
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP 2, Catarman-Calbayog via
China State (Phils.) SL1-SN-
Lope de Vega Road under the
Construction Engineering 004314/FC- PJHL 621.279 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -
Arterial Road Links Development
Corp. 02-072
Project, Phase V
CP 1, Alegria-Santiago Sect.
China State Construction 96.56%
FC-02-039 Under the PJHL, Mindanao Sect. PJHL 540.791 C 0.384 0.300 0.300 - - - 98.40
Engineering Corporation Outstanding
Rehab. Project, Phase II
Rehabilitation of Abra-Kalinga
Chivas Construction 28316 CAR 1.872 O 0.371 - 0.500 - - - 87.10 -
Road, Km.434+960-Km.435+260
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 96
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Widening of McArthur
Christian Ian Construction *72.00%
8191 Highway Phase III, Package IV, III 38.596 C 0.240 0.180 0.300 - - - 72.00
Corporation Satisfactory
Replacement of Tiaong Bridge
Concreting of Bambang-Kasibu-
Cielito A. Bay-ag Malabing-Quezon-Solano Road, 86.76%
19032 II 0.954 C 0.339 0.300 0.300 - - - 93.90
Construction Tadji-Runruno Section, Km. V. Satisfactory
312+300-Km.312+380
Cielito A. Bay-ag *80.90%
19032 Const. of FMR @ Brgy. Yaway II 0.282 C 0.309 0.200 0.300 - - - 80.90
Construction V. Satisfactory
Cielito A. Bay-ag Const./Completion of Multi- *90.00%
19032 II 0.909 C 0.400 0.200 0.300 - - - 90.00
Construction Purpose Bldg. at Kayapa H/S V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 97
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Reconstruction of Governor
Generoso I (Bankerohan) Bridge
94.66%
Ciriaco Corporation 6932 over Davao River along Davao- XI 206.649 C 0.376 0.300 0.300 - - - 97.60
Outstanding
Cotabato Road McArthur
Highway
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 98
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CM Tan Construction
Const. of Bayan-Cabahian Farm-
(Formerly: CM Tan Const. 28087 XIII 13.790 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -
to-Market Road
Supplies)
CM Tan Construction
Const./Widening of Dinagat- 67.88%
(Formerly: CM Tan Const. 28087 XIII 2.500 C 0.320 0.300 0.000 - - - 62.00
Loreto Road (Busay-Pangi Sect.) Faiir
Supplies)
CM Tan Construction
*86.40%
(Formerly: CM Tan Const. 28087 Upgrading of Kong Street XIII 3.954 C 0.364 - 0.500 - - - 86.40
V. Satisfactory
Supplies)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 99
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 100
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 101
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*78.90%
Compass Rose Builders 27024 Conc. of Bua FMR CAR 0.189 C 0.289 0.200 0.300 - - - 78.90
Satisfactory
*83.50%
Compass Rose Builders 27024 Repair/Rehab. of Pacalso E/S CAR 0.286 C 0.335 0.200 0.300 - - - 83.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 102
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Constructor's Development
31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.070 0.030 0.028 0.133 86.10 -
Multi-Purpose Cooperative
Constructor's Development
31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.015 0.023 0.000 63.80 -
Multi-Purpose Cooperative
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 103
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Constructor's Development
31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.030 0.027 0.133 79.00 -
Multi-Purpose Cooperative
Const./Completion of Multi-
Constructor's Development *96.90%
31538 Purpose School Building (2- XII 0.466 C 0.369 0.300 0.300 - - - 96.90
Multi-Purpose Cooperative Outstanding
Span Covered Court), Phase II
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 104
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*76.70%
Crazy Cut Construction 18324 Repair of Maba-ay NHS Bldg. CAR 0.738 C 0.267 0.200 0.300 - - - 76.70
Satisfactory
Repair/Rehab. of Various Sch.
CRDC Construction 29738 IX 0.027 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -
Bldgs., Tabiawan E/S
88.00%
Crishelle Construction 17108 Const. of Line Canal IV-B 0.185 C 0.380 0.500 88.00
V. Satisfactory
Const. of Puerto Princesa Pilot *89.70%
Crishelle Construction 17108 IV-B 1.077 C 0.397 0.200 0.300 - - - 89.70
E/S Phase II V. Satisfactory
Impvt. of Quezon-Punta Baja
Crishelle Construction 17108 IV-B 18.990 O 0.280 0.167 0.100 0.030 0.033 0.100 71.00 -
Road
Impvt. of Quezon-Punta Baja
Crishelle Construction 17108 IV-B 18.990 O 0.226 0.231 0.100 0.030 0.027 0.100 71.40 -
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 105
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 106
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 107
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
87.14%
D.C.E. Construction 29347 Const. of Conner Public Market CAR 4.611 C 0.375 0.290 0.300 - - - 96.50
V. Satisfactory
86.62%
D.C.E. Construction 29347 Const. of Dagupan Flood Control CAR 4.766 C 0.398 0.200 0.300 - - - 89.80
V. Satisfactory
Implementation of Various
*82.20%
D.C.E. Construction 29347 Projects under Package 9, Conc. CAR 1.888 C 0.322 0.200 0.300 - - - 82.20
V. Satisfactory
of Gen. Luna-Mayangao Streets
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 108
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*93.60%
D.L. Aureo Construction 24894 Const. of Multi-Purpose Building VIII 0.207 C 0.359 0.277 0.300 - - - 93.60
Outstanding
Const. of Seawall Barugo *79.20%
D.L. Aureo Construction 24894 VIII 0.376 C 0.292 0.200 0.300 - - - 79.20
Boulevard Satisfactory
Repair/Rehab. of 3 Cl Elem. Sch. *87.50%
D.L. Aureo Construction 24894 VIII 0.897 C 0.392 0.183 0.300 - - - 87.50
Bldg. @ Panalaron C/S V. Satisfactory
Asphalt Overlay of Road Zone III, *89.40%
D.M. Catignas Enterprises 20149 IVA 1.911 C 0.294 0.300 0.300 - - - 89.40
IV, VI, VII V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 109
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*82.70%
D.M. House Const. Inc. 25810 Const. of Road III 2.340 C 0.227 0.300 0.300 - - - 82.70
V.Satisfactory
*81.20%
D.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S III 0.940 C 0.339 0.173 0.300 - - - 81.20
V.Satisfactory
Impvt./Rehab. of Roman *97.40%
D.M. House Const. Inc. 25810 III 72.568 C 0.374 0.300 0.300 - - - 97.40
Expressway Outstanding
Rehab. & Impv't. of Angeles-
*80.80%
D.M. House Const. Inc. 25810 Porac-Floridablanca-Dinalupihan III 14.925 C 0.215 0.293 0.300 - - - 80.80
V.Satisfactory
Road
Repair/Rehab. of Slope
*79.40%
D.M. House Const. Inc. 25810 Protection along along Tenejero III 1.494 C 0.357 0.137 0.300 - - - 79.40
Satisfactory
River Control
Repair/Rehab. of Slope
*92.00%
D.M. House Const. Inc. 25810 Protection along Pentor-Balsik III 1.417 C 0.320 0.300 0.300 - - - 92.00
Outstanding
River Sta. Isabel Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 110
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*88.20%
D.W. G & A Developers 27573 Const. of Seawall VII 0.458 C 0.382 0.200 0.300 - - - 88.20
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 111
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
FC-98-
Daewoo Engineering & Metro Manila Flood Control
113/SL2-
Construction Company, Project-West of Mangahan MFCP I 725.017 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -
SN-
Ltd. Floodway, CP1,
000543
Philippine-Japn Friendship
Daewoo Engineering & SL2-SN- Highway Mindanao Section,
Construction Company, 000544/FC- Rehabilitation Project, Phase II, PJHL 1,559.690 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -
Ltd. 01-047 CP-II, Km.130+000-
Km.1376+805.34
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 112
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Completion of MPB in
*80.40%
Dahl Construction 8931 Brgy. Paso de Blas, Bagbaguin NCR 1.507 C 0.304 0.200 0.300 - - - 80.40
V.Satisfactory
and Mapulang Lupa
Rehab./Impvt. of Taytay
Dahl Construction 8931 IV-A 14.403 O 0.345 0.300 0.100 0.030 0.040 0.100 91.50 -
Diversion Road
Repair/Rehab. of C-3 Road inc. *67.10%
Dahl Construction 8931 NCR 14.239 C 0.071 0.300 0.300 - - - 67.10
Drainage Fair
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 113
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Dalanon Construction
Road Upgrading along Sewod-
Refregiration Supply & 11205 XII 18.937 O 0.344 0.300 0.100 0.030 0.032 0.100 90.60 -
Bunay Section
Service
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 114
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Conc. Inawayan-
Davao Concrete Products 12090 XI 14.922 O 0.315 0.300 0.100 0.010 0.040 0.100 86.50 -
Baracatan Road, Toril District
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 115
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening of Cotabato-Davao
Davao Concrete Products 12090 National Road, Pob. Pagalungan XII 5.436 C 0.323 0.300 0.000 - - - 62.30 54.71% Poor
Section
Davao Contractors
Conc. of Bucac Road Section *82.00%
Development Cooperative 28542 XIII 2.810 C 0.320 0.200 0.300 - - - 82.00
along Bucac-Marcelina Road V. Satisfactory
(DACODECO)
Davao Contractors
*99.50%
Development Cooperative 28542 Conc. of Road at Brgy. Subasta XI 0.944 C 0.395 0.300 0.300 - - - 99.50
Outstanding
(DACODECO)
Davao Contractors
*99.00%
Development Cooperative 28542 Const. of Lined Canal XII 0.468 C 0.390 0.300 0.300 - - - 99.00
Outstanding
(DACODECO)
Davao Contractors
*88.80%
Development Cooperative 28542 Const. of MPB (Phase II) XIII 0.552 C 0.388 0.200 0.300 - - - 88.80
V. Satisfactory
(DACODECO)
Davao Contractors
Development Cooperative 28542 Const. of MPB, Brgy. Mabini XII 0.667 O 0.306 0.240 0.100 0.030 0.028 0.100 80.40 -
(DACODECO)
Davao Contractors
Const. of N.N.C.H.S. Bldg.
Development Cooperative 28542 XI 2.828 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -
(Phase V)
(DACODECO)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 116
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Davao Contractors
Repair/Rehab. of Tugpan PSCG 66.62%
Development Cooperative 28542 XIII 3.810 C 0.369 0.200 0.000 - - - 56.90
Bridge Fair
(DACODECO)
Davao Engineers
Const. of 1 CL 1 Storey Bldg. @ *93.50%
Contractors Cooperative 30944 XI 0.465 C 0.335 0.300 0.300 - - - 93.50
Quezon E/S Outstanding
(DECK)
Davao Engineers
*95.60%
Contractors Cooperative 30944 Const. of MPB at Brgy. Ma-a XI 0.375 C 0.356 0.300 0.300 - - - 95.60
Outstanding
(DECK)
Davao L.A. Parts & Conc. Reblocking of Digos 95.34%
27208 XI 4.821 C 0.360 0.300 0.300 - - - 96.00
Hardware Corporation Diversion Road Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 117
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*89.40%
Decks Construction, Inc. 25860 Const. of MPB at Apitong IV-B 0.668 C 0.394 0.200 0.300 - - - 89.40
V. Satisfactory
Dela Cruz Construction and Const. of Two (2) Cl, Bldg., San *86.60%
20775 V 0.962 C 0.366 0.200 0.300 - - - 86.60
Supply Jose Pili H/S V. Satisfactory
*78.80%
Dhayang Construction Firm 12805 Const. of MPB, Brgy. Lanzuran IX 2.333 C 0.312 0.176 0.300 - - - 78.80
Satisfactory
Digos Tesston Const. of FMR @ Baracata-Atan-
8921 XI 4.710 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -
Construction & Supplies Awe-Sebulan Road
Digos Tesston Impv't/Conc. of Lacson-Lamanan
8921 XI 3.850 O 0.368 0.300 0.100 0.030 0.058 0.100 95.60 -
Construction & Supplies Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 118
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Digos Tesston
Construction & Supplies Const./Completion of DPWH-
8921 XI 9.635 O 0.376 0.279 0.100 0.030 0.047 0.050 88.20 -
(Formerly: ACT DCSDEO Bldg., Tugbok District
Construction)
Digos Tesston
Construction & Supplies Impv't/Conc. of Lacson-Lamanan 95.50%
8921 XI 3.850 C 0.355 0.300 0.300 - - - 95.50
(Formerly: ACT Road Outstanding
Construction)
Improvement/Widening of MNR
Dimson (Manila), Inc. 112 III 88.097 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -
Package I, Meycauayan
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 119
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of Classrooms @
Northern Mindanao State 79.02%
DL Enterprises 18155 X 1.906 C 0.305 0.300 0.300 - - - 90.50
College of Science & Satisfactory
Technology
DL Enterprises 18155 Const. of Road X 1.906 O 0.200 0.300 0.070 0.030 0.047 0.067 71.40 -
DL Enterprises 18155 Const. of Road X 1.906 O 0.267 0.240 0.100 0.015 0.040 0.067 72.90 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 120
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*92.00%
DMJ Construction & Supply 17211 Const. of 6 CL @ Uacon E/S III 4.243 C 0.330 0.290 0.300 - - - 92.00
Outstanding
DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.366 0.273 0.100 0.030 0.039 0.067 87.50 -
DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.346 0.200 0.100 0.030 0.032 0.100 80.80 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 121
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Completion of CCR,
Domvee Construction Guinsiliban Sagay Road Section 53.81%
19872 X 1.850 C 0.320 0.300 0.000 - - - 62.00
Corporation along Camiguin Circumferential Poor
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 122
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 123
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconstruction and
DQT Builders Corporation Concrete Paving of Catanauan- 93.50%
7950 IV-A 14.460 C 0.347 0.300 0.300 - - - 94.70
(Formerly:DQT Builders) Buenavista Nat'l Road Phase I- Outstanding
Buenavista Sect.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 124
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Duragold Trading & Const. - Const. of One (1) Storey Multi- 92.13%
31929 X 0.471 C 0.392 0.300 0.300 - - - 99.20
CDO Branch Purpose Bldg. Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 125
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Impvt. of Bacolod
Dynamic Builders &
South Kabankalan Road, 96.56%
Construction Co., (Phil.), 24712 VI 9.538 C 0.370 0.290 0.300 - - - 96.00
Km.5+200 - Km.5+775.5 with Outstanding
Inc.
exception
Widening/Impvt. of Bacolod
Dynamic Builders &
South Kabankalan Road,Tangub
Construction Co., (Phil.), 24712 VI 9.384 O 0.390 0.225 0.100 0.023 0.047 0.067 85.20 -
Section, Km.5+775.5-
Inc.
Km.5+937.5 with exception
Widening/Impvt. of Bacolod
Dynamic Builders &
South Kabankalan Road,Tangub
Construction Co., (Phil.), 24712 VI 9.384 O 0.385 0.248 0.100 0.030 0.050 0.100 91.30 -
Section, Km.5+775.5-
Inc.
Km.5+937.5 with exception
Widening/Impvt. of Bacolod
Dynamic Builders &
South Kabankalan Road,Tangub
Construction Co., (Phil.), 24712 VI 9.476 O 0.288 0.225 0.100 0.015 0.047 0.050 72.50 -
Section, Km.5+775.5-
Inc.
Km.5+937.5 with exception
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 126
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*92.10%
E & L Reyes Construction 15338 Conc. of Brgy. II Municipal Road VII 0.932 C 0.321 0.300 0.300 - - - 92.10
Outstanding
E & L Reyes Construction 15338 Const. of Getafe Public Market VII 1.895 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -
E and D Construction 32064 Const. of MPB (DENR Building) XII 0.939 O 0.311 0.231 0.100 0.023 0.029 0.067 76.10 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 127
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 128
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Asphalt Overlay/Rehab. of
Manila-Batangas Rd., Malvar *83.30%
E. Gardiola Construction 17542 IVA 19.290 C 0.246 0.287 0.300 - - - 83.30
Section, Brgy. San Fernando & V. Satisfactory
Santiago Phase II
Const. of C-5 Ext. Proj., from 86.26%
E. Gardiola Construction 17542 NCR 95.556 C 0.295 0.300 0.300 - - - 89.50
SLEX to Sucat Road V. Satisfactory
Impv't. of Road at Nangkaan-Ki 80.12%
E. Gardiola Construction 17542 IVA 9.644 C 0.276 0.200 0.300 - - - 77.60
Santol Road Phase II V. Satisfactory
Impvt./Rehab. Along San
*91.60%
E. Gardiola Construction 17542 Celestino-San Francisco-Sto. IVA 9.642 C 0.362 0.254 0.300 - - - 91.60
Outstanding
Toribio Rd.
87.80%
E. Lapus Enterprises 10813 Const. of Balangkas Road NCR 3.514 C 0.330 0.200 0.300 83.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 129
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Roads in
Western Samar, Oquendo-Pilar *85.70%
E. Lapuz Enterprises 10813 VIII 2.865 C 0.357 0.200 0.300 - - - 85.70
Road, Sta. 00+000-Sta. 05+405 V. Satisfactory
with exceptions
E. R. Venzon Construction 19013 PSHS BRC ACA I & DORM I PSHS 8.413 O 0.3994 0.233 0.100 0.020 0.030 0.070 85.24 -
Impvt.(Conc.) of Cagliling-
E.A. Sancho Construction 5648 Matang-Buenavista-Union- V 3.791 O 0.314 0.238 0.100 0.020 0.028 0.100 80.00 -
Salvacion Road
*91.70%
E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR CAR 0.458 C 0.377 0.240 0.300 - - - 91.70
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 130
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*76.50%
E.C. Samonte Construction 31019 Conc. of Sirawal Boulevard IX 1.846 C 0.265 0.200 0.300 - - - 76.50
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 131
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
E.D. Solano Construction & Const. of MPB (Brgy. Hall) Phase *97.30%
14758 I 0.668 C 0.373 0.300 0.300 - - - 97.30
Engineering Services 2 @ Brgy. Pogo Grande Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 132
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 133
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Rehab./Replacement /
E.H. Mantuhac *78.70%
21334 Completion & Repair of Elem. & VII 0.488 C 0.187 0.300 0.300 - - - 78.70
Construction Satisfactory
Secondary SB, Matabang HS
Rehab./Reconst. of Damaged
E.L.R. Everybody's National Roads, Banay-Banay- *91.00%
6336 IV-A 9.644 C 0.340 0.270 0.300 - - - 91.00
Construction Cuenca-Mojon Road, Lipa City Outstanding
Section
*89.70%
E.M. Angeles Enterprises 10150 Const. of MPB at Brgy. Talon 2 NCR 1.912 C 0.397 0.200 0.300 - - - 89.70
V. Satisfactory
Conc./Widening of Manila-Cavite 88.10%
E.M. Aragon Enterprises 3314 IV-A 9.580 C 0.381 0.200 0.300 - - - 88.10
Road V.Satisfactory
Const. (Conc.)/Widening of
E.M. Aragon Enterprises 3314 Governor's Drive, Dasmariñas- IV-A 35.578 O 0.269 0.288 0.050 0.030 0.042 0.100 77.90 -
Carmona Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 134
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. (Conc.)/Widening of
E.M. Aragon Enterprises 3314 Governor's Drive, Dasmariñas- IV-A 35.578 O 0.331 0.300 0.050 0.030 0.042 0.100 85.30 -
Carmona Road
*81.20%
E.M. Bayatan Construction 21332 Const. of MPB Phase III @ NVPH II 1.745 C 0.312 0.200 0.300 - - - 81.20
V. Satisfactory
*88.60%
E.M. Bayatan Construction 21332 Const. of Quirino MPB II 0.470 C 0.386 0.200 0.300 - - - 88.60
V. Satisfactory
85.98%
E.M. Bayatan Construction 21332 Const. of Solano MPB II 0.939 C 0.371 0.200 0.300 - - - 87.10
V. Satisfactory
*83.80%
E.M. Bayatan Construction 21332 Const. of Sta. Rosa MPB II 0.470 C 0.338 0.200 0.300 - - - 83.80
V. Satisfactory
E.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project PRRC 11.379 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -
Impvt. of Gangal-Bazar-
E.M. Palomares 80.04%
23471 Sallapadan Bo. FMR Sallapadan CAR 12.255 C 0.286 0.300 0.300 - - - 88.60
Construction V. Satisfactory
ARC
E.P. Manantan
Conc./Reblocking of Agusan-
Construction and 6457 XI 9.949 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -
Davao Road
Development Corp.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 135
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 136
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
81.48%
EA-EC Constuction 15737 Completion of MPB V 0.376 C 0.340 0.200 0.300 - - - 84.00
V. Satisfactory
*70.70%
EA-EC Constuction 15737 Const. of Flood Control V 2.088 C 0.307 0.100 0.300 - - - 70.70
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 137
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab. of Multi-Purpose
Ed Fabro Construction 18726 Pavement @ PNR, Biday- I 1.882 O 0.376 0.200 0.100 0.030 0.022 0.100 82.80 -
Mameltac and Bangbangolan
*84.50%
Eddie G. Guillen Builders 14174 Conc. of Appari Airport Road II 2.150 C 0.345 0.200 0.300 - - - 84.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 138
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
75.10%
Eddie G. Guillen Builders 14174 Const. of Tupang River Control II 4.699 C 0.373 0.300 0.300 - - - 97.30
Satisfactory
Eddmari Construction and Sct. Ranger Housing Project,
20301 NHA 46.983 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -
Trading Phase IV
Asphalting of Arayat-Apalit-
Masantol Setback Levee
Eddmari Construction and *80.90%
20301 (Candaba-San Luis-Apalit-San III 9.510 C 0.309 0.200 0.300 - - - 80.90
Trading V. Satisfactory
Simon-Macabebe & Masantol
Section
Eddmari Construction and *94.40%
20301 Concreting of Laon FMR IV-B 0.239 C 0.444 - 0.500 - - - 94.40
Trading Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 139
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*78.20%
Edriel Enterprises 32500 Const. of Bislig Flood Control V 1.915 C 0.282 0.200 0.300 - - - 78.20
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 140
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
EFC Enterprises 11795 Maeztranza Linear Park Project PRRC 22.850 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -
Rehab./Reconst. of Damaged
National Roads Generated from
EG & I Construction *87.80%
16225 Pavement Management Sys., VII 15.873 C 0.367 0.211 0.300 - - - 87.80
Corporation V. Satisfactory
along Bacalso Ave. (NBA-Cebu
South Rd.)
EG & I Construction Const. of Access Road to RORO *97.20%
16225 VII 4.742 C 0.372 0.300 0.300 - - - 97.20
Corporation Port (Phase I) Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 141
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
87.56%
EGB Construction 13722 Const. of MPB II 1.923 C 0.378 0.248 0.300 - - - 92.60
V. Satisfactory
87.63%
EGB Construction 13722 Const. of MPB II 1.926 C 0.385 0.200 0.300 - - - 88.50
V. Satisfactory
Const. of School Building
EGB Construction 13722 (Clustered 15 Units) 1-CL@ II 0.384 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -
Bimonton E/S
Const. of Various School Bldg.,
*82.20%
EGB Construction 13722 3CL Sch. Bldg. Cabagan Pilot II 0.790 C 0.322 0.200 0.300 - - - 82.20
V. Satisfactory
School
Rehab./Impvt. of Ilagan-Delfin
*91.00%
EGB Construction 13722 Albano-Mallig Road, Ilagan- II 9.439 C 0.310 0.300 0.300 - - - 91.00
Outstanding
Delfin Albano
Rehab./Reconst. of Damaged
EGB Construction 13722 II 19.132 O 0.365 0.300 0.050 0.030 0.033 0.100 87.80 -
National Roads
Rehab./Reconst. of Damaged
EGB Construction 13722 II 19.132 O 0.366 0.240 0.000 0.030 0.033 0.067 73.60 -
National Roads
*88.20%
EGB Construction 13722 Road Conc. of Cabisera II 3.815 C 0.382 0.200 0.300 - - - 88.20
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 142
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Restoration of Tabuan
El Nido Construction & *90.30%
25814 Road Sect. & Inst. of Box Culvert IVB 6.413 C 0.303 0.300 0.300 - - - 90.30
Trading Outstanding
& Slope Protection
Eleazar V. Adlawan 89.04%
576 Conc. of Panglao National Road VII 19.049 C 0.337 0.200 0.300 - - - 83.70
Construction V. Satisfactory
Eleazar V. Adlawan Const. of Seawall, Brgy. South 79.06%
576 VII 4.778 C 0.211 0.300 0.300 - - - 81.10
Construction Poblacion Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 143
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 144
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Eroded
Embankment & Damaged Slope
EPN Builders and 81..84%
30341 Protection @ Babanuang Bridge II 0.964 C 0.280 0.200 0.300 - - - 78.00
Developers V. Satisfactory
along Santiago-Tuguegarao
Road
Repair/Rehab. of Tungcab
EPN Builders and *94.30%
30341 Bridge Approach "B" along II 0.964 C 0.343 0.300 0.300 - - - 94.30
Developers Outstanding
Cordon-Aurora Bdry. Road
Impvt. of JSH-Bagontaas-
Equi-Parco Construction 85.44%
14332 Lurogan-MVC-Lilingayeon Road, X 24.697 C 0.370 0.230 0.300 - - - 90.00
Co. V. Satisfactory
MVC Section
Impvt./Conc. of Aglayan-
Equi-Parco Construction 91.00%
14332 Zamboanguita Road, Managoc X 66.953 C 0.361 0.300 0.300 - - - 96.10
Co. Outstanding
Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 145
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Equi-Parco Construction
14332 Nasipit Port Expansion Project PPA 215.144 O 0.3984 0.3 0.1 0.03 0.07 0.1 99.84 -
Co.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 146
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.40%
Ermy Construction 15741 Const. of 3 CL at San Isidro E/S III 1.136 C 0.344 0.300 0.300 - - - 94.40
Outstanding
*89.10%
Ermy Construction 15741 Impvt./Rehab. of Cabetican Road III 1.906 C 0.291 0.300 0.300 - - - 89.10
V. Satisfactory
Ermy Construction and
*91.20%
Trading (Formerly:Ermy 15741 Rehab. of Brgy. Road at St. Niño III 0.956 C 0.312 0.300 0.300 - - - 91.20
Outstanding
Construction)
ESD Cruz Construction & Const. of Conc. Drainage @ *83.20%
32368 VIII 0.241 C 0.332 0.200 0.300 - - - 83.20
Supply Brgy. Sto. Niño V. Satisfactory
ESD Cruz Construction & Repair of Secondary Sch. Bldg., *77.90%
32368 VIII 0.648 C 0.379 0.100 0.300 - - - 77.90
Supply Rawis NHS Satisfactory
Repair/Rehab. of National Road
ESD Cruz Construction &
32368 (Pangpang-Mapanas-Gamay- VIII 9.789 O 0.320 0.240 0.100 0.015 0.030 0.100 80.50 -
Supply
Lapinig Road
ESEK Construction
12871 Completion of Malanday E/S NCR 4.772 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -
Corporation
Const. of 1 Cl Sch. Bldg. @ *93.70%
Eser Enterprises-Burot 23902 III 0.424 C 0.362 0.275 0.300 - - - 93.70
Capas East CES Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 147
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NHA-
ESR Construction and Construction of 109 Duplex
10451 Cagayan 25.295 O 0.390 0.171 0.100 0.024 0.030 0.100 81.44 -
Supplies Housing Units
De Oro
Const./Rehab. of Drainage
Euluz Construction and *81.10%
32080 System and Gutter along KG and NCR 1.433 C 0.311 0.200 0.300 - - - 81.10
Supply V. Sstisfactory
K-9th
Euluz Construction and *86.90%
32080 Const./Rehab. of MPB NCR 2.254 C 0.318 0.251 0.300 - - - 86.90
Supply V. Sstisfactory
*82.00%
Express Construction 29649 Conc./Impvt. of Sto. Tomas Ext. NCR 1.456 C 0.320 0.200 0.300 - - - 82.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 148
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
F. Gurrea Construction,
6995 Completion of Anahawon VI 9.423 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -
Incorporated
Conc. of Oton-Mambog-
F. Gurrea Construction, Caboloan-Abilay-San Jose-San
6995 VI 57.850 O 0.291 0.212 0.100 0.023 0.048 0.100 77.40 -
Incorporated Miguel Road leading to
International Airport
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 149
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
86.64%
F. Vargas Construction 2366 Const. of Cadondongan Bridge II 6.754 C 0.346 0.200 0.300 - - - 84.60
V. Satisfactory
*95.50%
F.A. Construction 9837 Const. of MPB (Covered Court) III 1.886 C 0.355 0.300 0.300 - - - 95.50
Outstanding
*81.60%
F.C. Martinez Construction 31243 Const. of 1 CL, Murcon E/S III 0.410 C 0.352 0.164 0.300 - - - 81.60
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 150
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.34%
F.F. Galang Construction 26801 Const. of Multi-Purpose Building IV-B 0.745 C 0.395 0.206 0.300 - - - 90.10
V. Satisfactory
83.68%
F.F. Rosales Construction 8814 Const. of Eco-Tourism Road IV-A 8.908 C 0.332 0.200 0.300 - - - 83.20
V. Satisfactory
Sibunag Port Improvement
F. Gurrea Construction, Inc 6995 PPA 92.203 O 0.352 0.300 0.070 0.030 0.065 0.067 88.42 -
Project
Completion of Along-Along
F.L. Reguyal Construction 3315 III 2.848 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -
Bridge, Phase IV
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 151
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 152
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 153
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 154
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Replacement of Malalag
FFJJ Construction 16712 XI 14.265 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -
Bridge
Const./Replacement of Malalag
FFJJ Construction 16712 XI 14.265 O 0.335 0.285 0.100 0.030 0.023 0.100 87.30 -
Bridge
Impvt./Conc. of Jct. Mana-
FFJJ Construction 16712 Ticulon-Lagumi-Little Baguio XI 19.250 O 0.335 0.300 0.050 0.030 0.023 0.067 80.50 -
Road
*92.90%
FFJJ Construction 16712 Repair of Jones Timbol CES XI 0.150 C 0.329 0.300 0.300 - - - 92.90
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 155
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
First Northway
*80.80%
Development and 11645 Conc. of Tablac Road I 1.609 C 0.208 0.300 0.300 - - - 80.80
V. Satisfactory
Construction Corporation
First Northway
*84.50%
Development and 11645 Const. of Banayoyo Road I 0.934 C 0.345 0.200 0.300 - - - 84.50
V. Satisfactory
Construction Corporation
First Northway Repair and Maintenance of
*86.40%
Development and 11645 Candon-Salcedo Road, Various I 0.983 C 0.264 0.300 0.300 - - - 86.40
V. Satisfactory
Construction Corporation Sections
First Northway
Development and 11645 Sulvec Port Road I 6.358 O 0.320 0.240 0.100 0.022 0.027 0.100 80.90 -
Construction Corporation
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 156
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 157
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*84.50%
FM2 Trading & Enterprises 19044 Conc. of FMR, Brgy. Luna St. I 0.960 C 0.345 0.200 0.300 - - - 84.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 158
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
82.72%
Fortunato T. Sanchez 407 Concreting of Road XIII 5.770 C 0.330 0.200 0.300 - - - 83.00
V. Satisfactory
85.52%
Four J Construction 15104 Impvt. of Cainta River IV-A 3.836 C 0.339 0.269 0.300 - - - 90.80
V. Satisfactory
Impvt. of Valenzuela General 94.89%
Four J Construction 15104 NCR 0.937 C 0.372 0.300 0.300 - - - 97.20
Hospital Bldg. Outstanding
Repair & Impvt. of McArthur 91.72%
Four J Construction 15104 NCR 9.387 C 0.334 0.300 0.300 - - - 93.40
Highway Outstanding
Four J Construction 15104 Widening of Quezon Avenue NCR 21.722 O 0.376 0.240 0.100 0.018 0.042 0.100 87.60 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 159
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Impvt. of Mallorca-
Framecon Builders 22482 III 1.853 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -
Tabuating Road
Freden Construction 22665 Const. of Lined Canal XII 1.865 O 0.284 0.200 0.100 0.030 0.032 0.200 84.60 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 160
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*88.00%
G.C.I. Construction 11346 Conc. of Cagmanaba Road V 1.911 C 0.301 0.279 0.300 - - - 88.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 161
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.30%
G.C.I. Construction 11346 Const. of Buhi-Lidong Road V 28.220 C 0.261 0.200 0.300 - - - 76.10
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 162
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Libmanan-Cabusao
G.C.I. Construction 11346 Embankment (Poblacion V 10.523 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -
Revetment)
Repair/Restoration of Damaged
G.C.I. Construction 11346 V 14.385 O 0.384 0.200 0.000 0.030 0.032 0.133 77.90 -
Dike Maipon R.C.
Repair/Restoration of Damaged
*86.30%
G.C.I. Construction 11346 Rd. Pavement along Balogo- V 28.860 C 0.263 0.300 0.300 - - - 86.30
V. Satisfactory
Nasisi
*83.90%
G.C.I. Construction 11346 Road Conc. at Palestina Road V 1.891 C 0.239 0.300 0.300 - - - 83.90
V. Satisfactory
*79.70%
G.F. Rovero Merchandising 27268 Conc. of Altavas-Jamindan Road VI 0.961 C 0.381 0.116 0.300 - - - 79.70
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 163
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.42%
Gacutan Construction 10789 Conc. of Ilocos Norte-Abra Road I 11.649 C 0.339 0.200 0.300 - - - 83.90
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 164
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Camindangan
Galeno Construction, Inc. 3427 Bridge along Candoni-Sipalay VI 11.899 O 0.294 0.300 0.100 0.030 0.059 0.100 88.30 -
Road
Completion of Camindangan
Galeno Construction, Inc. 3427 Bridge along Candoni-Sipalay VI 11.899 O 0.319 0.240 0.100 0.023 0.051 0.100 83.30 -
Road
Completion of Camindangan
Galeno Construction, Inc. 3427 Bridge along Candoni-Sipalay VI 11.954 O 0.307 0.300 0.100 0.023 0.040 0.067 83.70 -
Road
Const. of Babak-Samal-Kaputian
Gampik Construction & 85.34%
8019 Road, IGACOS, Island Garden XI 9.392 C 0.350 0.300 0.300 - - - 95.00
Development Inc. V. Satisfactory
City of Samal
Impvt./Rehab of Marbel-Allah-
Gampik Construction & 92.78%
8019 Valley-Cotabato Road, XII 14.372 C 0.371 0.300 0.300 - - - 97.10
Development Inc. Outstanding
Ampatuan-Talayan Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 165
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Package 3: Const. of MP
*91.20%
Garnic Construction 22861 Building (2nd Floor Only) @ III 0.756 C 0.359 0.253 0.300 - - - 91.20
Outstanding
Brgy. Bulac
Rehab. of Multi-Purpose
Gaver General 97.20%
24186 Pavement in Pastrana Park VI 4.819 C 0.394 0.278 0.300 - - - 97.20
Merchandising Outstanding
(Phase III)
*87.10%
Gawanato Construction 28687 Const. of Line Canal @ Talaga IV-A 0.191 C 0.371 0.200 0.300 - - - 87.10
V. Satisfactory
Concreting of Tierra Nevada-
GCI Construction 11346 V 0.955 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -
Lupi Road
72.90%
GCI Construction 11346 Repair/Rehab of LCPIS V 11.652 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90
Satisfactory
Completion of Sagay Public 90.85%
GCMG Construction 9743 X 1.845 C 0.375 0.300 0.300 - - - 97.50
Market Outstanding
78.90%
GCMG Construction 9743 Const./Conc. of Manduao Road X 0.930 C 0.334 0.200 0.300 - - - 83.40
Satisfactory
*87.60%
GED Construction 13614 Const. of Road @ San Antonio I 0.475 C 0.276 0.300 0.300 - - - 87.60
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 166
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Gemma Construction
5044 Const. of Bridge XII 3.687 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -
Supply
Gemma Construction
5044 Const. of MPB (Phase I) XII 4.767 O 0.347 0.240 0.100 0.030 0.044 0.067 82.80 -
Supply
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 167
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.38%
Geovan Marketing 10824 Const. of Agbalili River Control VI 4.815 C 0.277 0.300 0.300 - - - 87.70
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 168
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
GES Construction 30299 Taripa CIS PIO 1.012 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -
*89.80%
Geto Construction 17689 Concreting of Interior Roads IV-A 1.910 C 0.398 0.200 0.300 - - - 89.80
V. Satisfactory
Conc. of Line Canal along
89.90%
Gicar Construction 12624 Surigao-Wharf Road km. XIII 0.962 C 0.311 0.300 0.300 - - - 91.10
V. Satisfactory
1122+270 to km. 1122+560
Conc. of Line Canal with Slope
84.38%
Gicar Construction 12624 Protection along Surigao- XIII 1.927 C 0.388 0.166 0.300 - - - 85.40
V. Satisfactory
Agusan Road
Conc. of Surigao City-San Juan
Gicar Construction 12624 XIII 28.595 O 0.322 0.300 0.100 0.030 0.065 0.100 91.70 -
Coastal Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 169
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.30%
GJD Construction & Supply 25866 Const. of MPB @ Poblacion IX 0.475 C 0.372 0.181 0.300 - - - 85.30
V. Satisfactory
*75.00%
GJE Builders 18286 Conc. of FMR @ Brgy. Bawa III 0.614 C 0.250 0.200 0.300 - - - 75.00
Satisfactory
*81.30%
GJE Builders 18286 Conc. of Purok 5 Road III 1.675 C 0.313 0.200 0.300 - - - 81.30
V. Satisfactory
Const. of 1 CL Sch. Bldg. at San *84.70%
GJE Builders 18286 III 0.423 C 0.290 0.257 0.300 - - - 84.70
Juan de Valdez E/S V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 170
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion/Continuation of
78.66%
GLCT Construction 30657 Unfinished Matain Bridge along III 5.519 C 0.328 0.149 0.300 - - - 77.70
Satisfactory
Olongapo-Bugallon Road
96.40%
GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge III 13.950 C 0.364 0.300 0.300 - - - 96.40
Outstanding
Boracay Environmental
Global V Builders / HITRI
29763 Infrastucture Project Drainage PTA 94.176 S 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -
Construction joint venture
System
*82.00%
GNE Construction 21764 Const. of MPB, Poblacion IX 0.935 C 0.373 0.147 0.300 - - - 82.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 171
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair / Rehabilitation of
*99.30%
Goldbern Construction 28509 Buildings 9 & 10 @ Bagong NCR 1.690 C 0.393 0.300 0.300 99.30
Outstanding
Lipunan Condominium (BLC)
86.61%
Golden Ridge Enterprises 29946 Masao Port Expantion Project PPA 91.102 C 27.982 30.000 30.000 - - - 86.61
V.Satisfactory
Completion of Multi-Purpose
Goldfin Construction 21343 VII 1.324 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -
Building
Const. Additional Floor and
81.57%
Goldfin Construction 21343 Repair/Repair of existing MPB IX 4.718 C 0.385 0.257 0.300 - - - 94.20
V. Satisfactory
(TESDA)
85.77%
Goldfin Construction 21343 Const. of Camp Lapu-Lapu E/S VII 2.938 C 0.362 0.300 0.300 - - - 96.20
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 172
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.364 0.300 0.100 0.030 0.021 0.100 91.50 -
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.337 0.289 0.030 0.030 0.056 0.067 80.90 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 173
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Bogo-Curva-Madellin-
*80.90%
Gonzalodo Enterprises 30681 Daanbantayan Road, Antipolo VII 7.600 C 0.309 0.200 0.300 - - - 80.90
V. Satisfactory
Section
72.09%
Gonzalodo Enterprises 30681 Impvt. of MPB VII 1.885 C 0.349 0.200 0.300 - - - 84.90
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 174
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.92%
GP Construction 18653 Const. of MPB V 1.872 C 0.390 0.200 0.300 - - - 89.00
V. Satisfactory
*86.70%
GP Construction 18653 Const. of Spillway V 0.378 C 0.367 0.200 0.300 - - - 86.70
V. Satisfactory
*99.80%
GPJ Construction 10613 Conc. of Makati Ave. (Phase III) NCR 0.712 C 0.398 0.300 0.300 - - - 99.80
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 175
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 176
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 177
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Butuan-
Grace Construction Cagayan de Oro-Iligan Road, *77.90%
3771 X 9.592 C 0.242 0.237 0.300 - - - 77.90
Corporation Salay-Dampil, Lagonglong Satisfactory
Section, Looc
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 178
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
76.92%
Grand Builders 6845 Conc. of Tubod-Ganassi Road X 10.832 C 0.300 0.300 0.000 - - - 60.00
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 179
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 180
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 181
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 182
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Widening of Mc Arthur
Haidee Construction and SL2-SN-
Highway, Phase III (Package III), *98.50%
Development Corp./Al-B 00774 / JV- III 115.799 C 0.385 0.300 0.300 - - - 98.50
Replacement of Labangan Outstanding
Const. (JV) 06-078
Bridge No. 7
Geometric
*94.70%
Halrey Construction, Inc. 2267 Improvement/Rehab./Reblocking NCR 9.530 C 0.347 0.300 0.300 - - - 94.70
Outstanding
of Portions of EDSA Q.C.
Impvt./Conc. Blocking of
Katipunan Ave. & E. Rodriguez 95.48%
Halrey Construction, Inc. 2267 NCR 14.314 C 0.329 0.300 0.300 - - - 92.90
Jr. C-5 (Shuster St. to Ortigas Outstanding
Ave.)
Rehab. (Concrete Blocking) of
96.88%
Halrey Construction, Inc. 2267 EDSA from Quezon Ave. to NCR 9.554 C 0.382 0.300 0.300 - - - 98.20
Outstanding
Annapolis (South Bound)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 183
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Hanjin Heavy Industries & SLN-SN- Bohol Irrigation Project, Stage 2 93.10%
BHIP 608.709 C 0.331 0.300 0.300 - - - 93.10
Construction Co. Ltd. 000452 (BHIP2-C-2) Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 184
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
SL2-SN- 98.00%
Hanjin/Kurimoto JV Bohol Irrigation Project, Stage 2 NIA-IV 1561.392 C 0.380 0.300 0.300 - - - 98.00
000452 Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 185
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Subic-Clark-Tarlac Expressway
Hazama-Taisei-Nippon
Project, Contract Package 2 of
Steel (HTN JOINT FC-04-025 JBIC 596.889 O 0.348 0.300 0.050 0.030 0.038 0.067 83.25 -
Additional Access Roads and
VENTURE)
Interchange
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 186
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Subic-Clark-Tarlac Expressway
Hazama-Taisei-Nippon
Project, Contract Package 2 of
Steel (HTN JOINT FC-04-025 BCDA 596.889 O 0.385 0.297 0.050 0.030 0.061 0.067 88.95 -
Additional Access Roads and
VENTURE)
Interchange
HCM Construction
19382 Const. of Road/Bridge NCR 14.374 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -
Corporation
HCM Construction
19382 Const. of Road/Bridge NCR 14.374 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -
Corporation
HCM Construction Slope Protection of Creek @ 94.84%
19382 NCR 9.600 C 0.376 0.300 0.300 - - - 97.60
Corporation Brgy. Pulang Lupa & Manuyo Outstanding
Herefold Builders
20789 Impvt. of MPB IV-A 0.099 O 0.335 0.300 0.100 0.030 0.023 0.067 85.50 -
Construction and Supply
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 187
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
89.93%
HGG Builders and Supply 17824 Const. of Multi-Purpose Building V 1.929 C 0.400 0.249 0.300 - - - 94.90
V. Satisfactory
Completion of Pedestrian
Hibiscus Trading and 85.98%
28280 Overpass Across NCR 1.873 C 0.267 0.300 0.300 - - - 86.70
Construction Services V. Satisfactory
Commonwealth Ave.
Package 8: a)
Renovation/Improvement of
Hibiscus Trading and 86.32%
28280 Multi-Purpose Bldg. Brgy. NCR 1.590 C 0.282 0.277 0.300 - - - 85.90
Construction Services V. Satisfactory
Socorro: b) Completion of Multi-
Purpose Bldg. Brgy. Masagana
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 188
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 189
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
Paved Nat'l Roads Generated
Homeworld Engineering 14725 VI 30.687 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
from PMS/HDM-4, Sum-ag-
Abunan Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 190
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Replacement of
HPL General Construction 22289 Camanauan Bridge, along Dugo- II 4.240 O 0.396 0.217 0.100 0.030 0.028 0.067 83.80 -
San Vicente Road (DVSR)
Const./Replacement of
HPL General Construction 22289 Camanauan Bridge, along Dugo- II 4.240 O 0.380 0.210 0.030 0.022 0.023 0.067 73.20 -
San Vicente Road (DVSR)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 191
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 O 0.361 0.225 0.070 0.003 0.028 0.100 78.70 -
Repair/Rehab./Impvt. of Nat'l
Roads along Bagahupi-
*97.20%
I & E Construction 10410 Babatngon Road, Tanauan- VIII 24.097 C 0.372 0.300 0.300 - - - 97.20
Outstanding
Dagami Road, Mainit-San Miguel
Santoil Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 192
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Tanauan-
*87.60%
I & E Construction 10410 Dagami-Burauen Road, San VIII 19.296 C 0.376 0.200 0.300 - - - 87.60
V. Satisfactory
Miguel- Barugo Road
Rehab./Impvt. of Old Road MSR *78.70%
I & E Construction 10410 IV-A 19.204 C 0.287 0.200 0.300 - - - 78.70
, Brgy. San Antonio Satisfactory
87.64%
I.F. Blanco's Construction 25350 Conc. of Lumangbayan-Pili Road IV-B 9.410 C 0.361 0.300 0.300 - - - 96.10
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 193
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 194
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
IKM Builders & *85.50%
30252 National Road, Batangas-Lobo IV-A 9.647 C 0.255 0.300 0.300 - - - 85.50
Construction Supply V. Satisfactory
Road, Dagatan-Laurel Section
Const./Rehab. of Drainage
85.10%
ILG Enterprises 31985 System along CSCF Jct. Paete IV-A 2.434 C 0.320 0.300 0.300 - - - 92.00
V. Satisfactory
Section
IM Construction *96.70%
20074 Conc. Blocking of Susano Road NCR 2.873 C 0.367 0.300 0.300 - - - 96.70
Corporation Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 195
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
IM Construction *92.90%
20074 Widening of North Avenue NCR 8.605 C 0.329 0.300 0.300 - - - 92.90
Corporation Outstanding
Const. of Multi-Purpose *80.60%
IMB Construction 13259 VII 0.938 C 0.306 0.200 0.300 - - - 80.60
Building V. Satisfactory
Const. of FMR @ Brgy. *86.60%
Interchain Builders 28734 V 0.931 C 0.366 0.200 0.300 - - - 86.60
Magallanes-Brgy. Pating V. Satisfactory
CP1, Ligao-Pio Duran Setion,
Interior-Philworks Const. 84.28%
JV-04-014 Arterial Road Links Devt. (Phase V 328.190 C 0.231 0.300 0.300 - - - 83.10
Joint Venture V. Satisfactory
V)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 196
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Construction of Three-Storey
ISH Construction Inc. 30407 SLB 17.201 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -
School Building (12 Classrooms)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 197
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Ivahrick Contractors 13688 Const. of Flood Control NCR 2.857 O 0.280 0.119 0.100 0.030 0.005 0.200 73.40 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 198
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 199
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 200
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Bontoc-
J. C. Baac Construction 78.40%
25974 Lubuagan-Tabuk Road (Gongon CAR 13.257 C 0.370 0.300 0.300 - - - 97.00
Corporation Satisfactory
Sect.)
CP 7: Impvt./Conc. of Surigao
Sur-Davao Oriental Coastal Road
J.D. Legaspi Construction 9608 XI 191.035 O 0.211 0.300 0.100 0.030 0.060 0.100 80.10 -
(Manay-Boston) Baganga
Section Phase II
J.D. Legaspi Construction 9608 Pasig River Ferry Service Station PRRC 7.303 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 201
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP 6, Restoration of Patapat
J.H. Pajara Construction
1890 Viaduct under the Arterial Road PJHL 187.597 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -
Corp.
Links Dev. Project, Phase V
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 202
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Concreting of Farm-to-Market
J.M. Maligaya Construction *88.70%
15018 Road @ Brgy. Asis II (Sitio IV-A 0.380 C 0.387 0.200 0.300 - - - 88.70
& Construction Supply V. Satisfactory
Magsili)
J.M. Morales Construction
70.64%
& Supply (Formerly: J.M. 15574 Impvt. of MPB III 5.780 C 0.387 0.270 0.300 - - - 95.70
Satisfactory
Morales Const.)
J.M. Morales Construction
Upgrading/Rehab. of Lubao *85.20%
& Supply (Formerly: J.M. 15574 III 4.777 C 0.369 0.183 0.300 - - - 85.20
Diversion Road V. Satisfactory
Morales Const.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 203
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
81.99%
J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S III 1.091 C 0.313 0.300 0.300 - - - 91.30
V. Satisfactory
*92.30%
J.S. General Contractor 15258 Const. of MPB, Brgy. 7 IV-A 0.476 C 0.356 0.267 0.300 - - - 92.30
Outstanding
Const. of Multi-Purpose Bldg. @
J.S. General Contractor 15258 IV-A 0.475 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -
Brgy. Maranan I
Const. of Water Supply System *85.00%
J.S. General Contractor 15258 IV-A 0.575 C 0.350 0.200 0.300 - - - 85.00
@ Pantihan 1,2, & 3 V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 204
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP A, Provision of Slope
Protection, Const./Installation of
91.14%
J.T. Gamolo Construction 15759 Gabions & Const. of Retaining X 9.339 C 0.386 0.300 0.300 - - - 98.60
Outstanding
Wall along Sayre Highway Alae-
Kisolon Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 205
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. of Talobatibe-Jose
Jadestress Builders 9753 V 9.390 O 0.322 0.283 0.100 0.030 0.033 0.100 86.80 -
Panganiban Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 206
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 207
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab. of Sarangani-Sultan
Jargon Construction &
23474 Kudarat Coastal Road XII 4.746 O 0.267 0.300 0.100 0.015 0.021 0.100 80.30 -
Supply
(Malisbong Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 208
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab. of Quezon-Carangonhan
Jasmin Construction 9561 V 2.371 O 0.350 0.240 0.100 0.020 0.023 0.100 83.30 -
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 209
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*86.60%
Jaykris Enterprises 30906 Const. of Road at Lanote St. IX 0.932 C 0.366 0.200 0.300 - - - 86.60
V. Satisfactory
*98.90%
JBRC Construction 26019 Impvt. of Bago-Manarang Road I 1.896 C 0.394 0.295 0.300 - - - 98.90
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 210
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Improvement/Rehabilitation of
Jeada Construction 17869 Shore Protection alongside NHA, V 6.745 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -
Sea Breeze Homes
*89.40%
Jecel Construction Supply 21956 Const. of MPB @ San Miguel XI 0.952 C 0.394 0.200 0.300 - - - 89.40
V. Satisfactory
86.23%
Jecel Construction Supply 21956 Const. of MPB @ Upper Limonzo XI 0.952 C 0.371 0.220 0.300 - - - 89.10
V. Satisfactory
Conc. of Bagong Silang-
Jeff Construction 14774 Capalonga National Secondary V 9.450 O 0.330 0.240 0.100 0.023 0.045 0.100 83.80 -
Rd.
Rehab./Reconst. of Damaged
Jegma Construction & 86.70%
14775 Paved Nat'l Roads, Camp Lapu- VII 14.318 C 0.346 0.200 0.300 - - - 84.60
Dev't. Corporation V. Satisfactory
lapu Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 211
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 212
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Rehab./Impv't. of Multi-
Purpose Bldg. Ormoc City *91.50%
JFAP Construction 21706 VIII 0.480 C 0.374 0.241 0.300 - - - 91.50
Center for Sports & Outstanding
Development
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 213
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Upgrading/Conc. of Capinang-
Jhall Marketing & Services 15760 VI 9.545 O 0.362 0.222 0.100 0.022 0.043 0.100 84.90 -
San Dionisio Road
*85.70%
JHI Construction & Supply 19317 Const. of MPB (Phase V) I 0.948 C 0.257 0.300 0.300 - - - 85.70
V. Satisfactory
75.64%
JHJ Construction 3781 Completion of Codingle Bridge VI 4.452 C 0.200 0.200 0.300 - - - 70.00
Satisfactory
86.10%
JHJ Construction 3781 Const. of Maragubdob Bridge VI 7.999 C 0.400 0.200 0.300 - - - 90.00
V. Satisfactory
Const./Completion of DepEd
*76.4%
JHJ Construction 3781 Bldg. (Roof Deck Roofing) Phase VI 0.949 C 0.364 0.100 0.300 - - - 76.40
Satisfactory
I
*86.00%
Jim-Jake Const. & Supply 23377 Conc. of Legazpi Road I 0.288 C 0.360 0.200 0.300 - - - 86.00
V. Satisfactory
Const./Impv't. of Sitio-Agtinga-
Jireh Construction & 70.48%
8240 Madrona Estate FMR, Camili IV-B 17.443 C 0.232 0.267 0.000 - - - 49.90
Supply Satisfactory
ARC
Jirk Construction 29918 Const. of Cagayan River Control II 9.469 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 214
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 215
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
84.36%
JLV Construction & Supply 9953 Const. of Multi-Purpose Building IV-A 0.960 C 0.259 0.300 0.300 - - - 85.90
V. Satisfactory
Const. of School and MPB @ *83.00%
JLV Construction & Supply 9953 IV-A 1.430 C 0.262 0.268 0.300 - - - 83.00
Batuan CENTEX V. Satisfactory
*85.00%
JLV Construction & Supply 9953 Const. of Taliba-Tejero FMR IV-A 0.949 C 0.250 0.300 0.300 - - - 85.00
V. Satisfactory
*87.30%
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.373 0.200 0.300 - - - 87.30
V. Satisfactory
*81.60%
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.306 0.210 0.300 - - - 81.60
V. Satisfactory
Impvt./Rehab. of Multi-Purpose
84.67%
JLV Construction & Supply 9953 Building @ Brgy. Pantay IV-A 3.858 C 0.294 0.217 0.300 - - - 81.10
V. Satisfactory
Matanda
*85.30%
JMLD Construction 22679 Conc. of Road at Zone 6, Grijalvo V 0.279 C 0.353 0.200 0.300 - - - 85.30
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 216
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
76.00%
JMU Construction 6877 Const. of MPB (Gym Phase I) II 4.822 C 0.260 0.200 0.300 - - - 76.00
Satisfactory
*84.40%
J'ner Cepada Construction 30212 Const. of Libas MPB VIII 0.995 C 0.344 0.200 0.300 - - - 84.40
V. Satisfactory
*87.30%
Jobel Enterprises 19799 Const. of Drainage System IV-A 0.476 C 0.373 0.200 0.300 - - - 87.30
V. Satisfactory
*79.60%
Jobel Enterprises 19799 Const. of MPB IV-A 0.477 C 0.270 0.226 0.300 - - - 79.60
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 217
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Completion
John Ray Developer &
20795 (Repair/Rehab.) of MPB @ BPI XII 0.466 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -
Supplies
Balindog
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 218
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.70%
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building V 0.953 C 0.257 0.300 0.300 - - - 85.70
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 219
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.54%
Joselle Construction 16243 Conc. of Brgy. 2 @ Osmeña Ave. XIII 2.350 C 0.342 0.200 0.300 - - - 84.20
V. Satisfactory
78.44%
JR Contractor 9638 Const. of Drainage System, V 0.951 C 0.267 0.200 0.300 - - - 76.70
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 220
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
JR Contractor 9638 Const./Rehab. of Water Supply V 1.664 O 0.393 0.200 0.100 0.015 0.018 0.100 82.60 -
Impvt./Rehab. of Bangad-Fort
JSG Construction *86.70%
9350 Magsaysay Road, Cabanatuan III 19.143 C 0.267 0.300 0.300 - - - 86.70
Company, Inc. V. Satisfactory
City & Sta. Rosa
Impvt./Rehab. of Tanauan-
JSG Construction *83.30%
9350 Dagami Road, Cansamada - VIII 19.296 C 0.333 0.200 0.300 - - - 83.30
Company, Inc. V. Satisfactory
District IV Sect. with exceptions
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 221
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Caglanipao
Bridge, Daang Maharlika, *76.90%
JUF Construction 17987 VIII 9.645 C 0.369 0.100 0.300 - - - 76.90
Calbayog-Allen Road, Brgy. Satisfactory
Caglanipao Tinambacan District
Repair/Rehab. of Calbayog-
*86.00%
JUF Construction 17987 Catarman Road (Km. 784+739 to VIII 9.643 C 0.360 0.200 0.300 - - - 86.00
V. Satisfactory
Km. 809+270)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 222
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 223
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
JV Lagon Construction
11561 Widening of Kapingkong Bridge XII 13.377 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -
Corporation
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 224
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*89.30%
Kasanga Construction 17024 Const. of MPB at Caagutayan IV-B 0.666 C 0.393 0.200 0.300 - - - 89.30
V. Satisfactory
*86.30%
Kasanga Construction 17024 Const. of MPB at Panggalaan IV-B 0.668 C 0.363 0.200 0.300 - - - 86.30
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 225
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
71.74%
Kawi Construction 25844 Completion of MPB Phase III CAR 0.960 C 0.244 0.080 0.000 - - - 32.40
Satisfactory
Conc. of Cemetery Road, Brgy. *74.20%
KCS Construction & Supply 19641 V 0.460 C 0.323 0.119 0.300 - - - 74.20
Catabangan Proper Satisfactory
*87.20%
KCS Construction & Supply 19641 Conc. of Road at Cabuyao Road V 1.912 C 0.272 0.300 0.300 - - - 87.20
V. Satisfactory
Conc. Paving of Dapa-Union
Kent Construction 8655 XIII 5.732 O 0.233 0.200 0.050 0.030 0.032 0.067 61.20 -
Road (One Lane)
71.82%
Kent Construction 8655 Const. of MPB (Phase 2) XIII 0.480 C 0.374 0.200 0.000 - - - 57.40
Satisfactory
Kent Construction 8655 Jct. Osmeña-Pilar Road XIII 5.787 O 0.239 0.230 0.070 0.030 0.032 0.067 66.80 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 226
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*86.20%
KGD Builders 21960 Const. of 2-CL Lanton E/S XII 0.796 C 0.384 0.178 0.300 - - - 86.20
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 227
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 228
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Multi-Purpose
Kirskat Venture 32042 DOST 61.723 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -
Gynasium
Completion of PSHS WVC 99.16%
Kirskat Venture 32042 DOST 8.544 C 0.392 0.300 0.300 - - - 99.16
Gynasium Outstanding
Const. of Lupgupan Bridge *94.50%
Kirskat Venture 32042 VI 9.631 C 0.345 0.300 0.300 - - - 94.50
along Iloilo-Capiz Road Outstanding
*87.30%
Kirskat Venture 32042 Const. of Maayon River Control VI 3.197 C 0.373 0.200 0.300 - - - 87.30
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 229
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
KVC Construction 28959 Conc. of Baguio-Itogon Road CAR 13.008 O 0.340 0.211 0.100 0.020 0.025 0.067 76.30 -
77.74%
KVC Construction 28959 Const. of Tocucan Bridge CAR 4.041 C 0.359 0.200 0.300 - - - 85.90
Satisfactory
Impvt. Along Acop-Kapangan-
64.70%
KVC Construction 28959 Kibungan Road (km. 278+300 - CAR 6.704 C 0.347 0.000 0.300 - - - 64.70
Fair
km. 280+760)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 230
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*62.50%
L & L Construction 15108 Conc. of Initao Road X 0.960 C 0.325 0.300 0.000 - - - 62.50
Fair
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 231
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Conc. of Additional 2
L.A. Arizola Construction & 87.70%
31060 lanes from Church of Later Day XI 4.129 C 0.277 0.300 0.300 - - - 87.70
Supply V. Satisfactory
Saints up to Carmen
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 232
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Improvement of Cross
84.24%
L.G. Lasacar Construction 11960 Country Road, Catarman- X 4.368 C 0.349 0.008 0.300 - - - 65.70
V. Satisfactory
Mambajao Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 233
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*95.20%
L.L.A. Builders 15075 Const. of MPB IV-A 1.154 C 0.352 0.300 0.300 - - - 95.20
Outstanding
L.M.G. Construction 5719 Daang Maharlika (LZ) III 18.916 O 0.334 0.180 0.100 0.020 0.028 0.100 76.20 -
Repair/Rehab./Impvt. of
Roadways (Inst. of Road Traffic *72.40%
L.M.G. Construction 5719 III 4.624 C 0.224 0.200 0.300 - - - 72.40
Safety Devices), SLMAC Road Satisfactory
(So. Dimotol-By PassRd..)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 234
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. (Widening/Conc.) of Mc
Arthur Highway (MNR)
L.R. Tiqui Builders, Inc. 13810 III 188.051 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -
Meycauayan to Mabalacat,
Pampanga (Phase IV) Package 1
Impvt. (Widening/Conc.) of Mc
Arthur Highway (MNR)
L.R. Tiqui Builders, Inc. 13810 III 70.394 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -
Meycauayan to Mabalacat,
Pampanga (Phase IV) Package II
Impvt/Widening of Aguinaldo
L.R. Tiqui Builders, Inc. 13810 Highway and other related road IV-A 60.022 O 0.336 0.240 0.100 0.024 0.028 0.100 82.80 -
Phase II
Impvt/Widening of Aguinaldo
L.R. Tiqui Builders, Inc. 13810 Highway and other related road IV-A 60.022 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -
Phase II
NCR/Bulacan Bdry.-Bigte-Ipo
L.R. Tiqui Builders, Inc. 13810 Dam Road inc. Replacement of III 47.641 O 0.358 0.300 0.100 0.030 0.048 0.100 93.60 -
Kay Tialo Bridge
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 235
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Reconst. of Tullahan/Ugong
L.R. Tiqui Builders, Inc.
Bridge, Gen. T. de Leon (near
(Formerly Luisito R. Tiqui 13810 NCR 27.066 O 0.368 0.240 0.100 0.030 0.033 0.067 83.80 -
NLEX) near Bdry. Of Caloocan,
Builders
Valenzuela, M.M.
Reconst. of Tullahan/Ugong
L.R. Tiqui Builders, Inc.
Bridge, Gen. T. de Leon (near
(Formerly Luisito R. Tiqui 13810 NCR 27.066 O 0.367 0.240 0.100 0.018 0.051 0.100 *87.60 -
NLEX) near Bdry. Of Caloocan,
Builders)
Valenzuela, M.M.
* 75.00%
L.S. Abelar Construction 31560 Impvt. of Drainage Canal IV-A 0.096 C 0.250 0.200 0.300 - - - 75.00
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 236
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*90.80%
La Greta Construction 33080 Impvt.of MPB at Brgy. Progreso IV-A 0.142 C 0.308 0.300 0.300 - - - 90.80
Outstanding
*80.00%
LA Milagrosa Enterprises 17404 Conc. of Cabu-an Brgy. Road X 1.850 C 0.300 0.200 0.300 - - - 80.00
Satisfactory
*80.50%
LA Milagrosa Enterprises 17404 Conc. of Yumbing Road X 0.926 C 0.288 0.217 0.300 - - - 80.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 237
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Construction of PSHS-CVC
Lanao Builder &
15982 Academic Bldg. I and Dormitory DOST 9.59 O 0.3455 0.300 0.05 0.02 0.030 0.100 84.55 -
Enterprises
Bldg. I Phase I
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 238
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 239
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.10%
Landmark Builders 7400 Completion of MPB (OPD, DOPH XI 0.472 C 0.341 0.300 0.300 - - - 94.10
Outstanding
Landmark Builders 7400 Const. of MPB (Gymnasium) XI 2.800 O 0.317 0.244 0.000 0.015 0.023 0.067 66.60 -
Const./Completion of Manolo
93.73%
Landmark Builders 7400 Fortich Municipal Hall Bldg. (P- X 7.590 C 0.380 0.300 0.300 - - - 98.00
Outstanding
IX)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 240
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS X 0.595 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -
Leda Construction
Conc. of Jaro-Dagami-Burauen- 83.04%
Incorporated (Formerly: 12229 VIII 18.890 C 0.284 0.199 0.300 - - - 78.30
La Paz Road V. Satisfactory
Leda Const.)
Leda Construction
Conc. of Jaro-Dagami-Burauen- 83.92%
Incorporated (Formerly: 12229 VIII 12.280 C 0.317 0.200 0.300 - - - 81.70
La Paz Road, Jaro Section V. Satisfactory
Leda Const.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 241
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Impvt. of Palo-Carigara-
Leda Construction
Ormoc-Baybay-Maasin Road, *71.30%
Incorporated (Formerly: 12229 VIII 11.338 C 0.213 0.200 0.300 - - - 71.30
Palo-Carigara-Ormoc-Baybay- Satisfactory
Leda Const.)
Maasin Road Section
Leda Construction
Incorporated (Formerly: 12229 Rehab./Impvt. of Seawall VII 10.881 O 0.384 0.103 0.100 0.030 0.027 0.200 84.40 -
Leda Const.)
Const. and Improvement of
Legacy Construction 22465 NIA 5.936 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -
Punta Taytay Main Drainage
Widening/Impvt. of Bacolod
Legacy Construction 22465 South Kabankalan Road (Tangub VI 7.870 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -
Sect.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 242
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 243
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 244
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 245
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
89.18%
Lim General Contractor 8482 Const. of Luya Bridge V 15.827 C 0.341 0.300 0.300 - - - 94.10
V. Satisfactory
Rehab./Reconst. of Damaged
National Road along San
Lim General Contractor 8482 V 18.898 O 0.270 0.236 0.000 0.030 0.022 0.067 62.50 -
Fernando North Rd., San Jacinto
Section
78.26%
Lim General Contractor 8482 Replacement of Damaged Bridge V 14.100 C 0.342 0.200 0.300 - - - 84.20
Satisfactory
89.76%
Limar Construction 10203 Const. of Manlumay Bridge VIII 3.807 C 0.300 0.300 0.300 - - - 90.00
V. Satisfactory
Impv't. along Jct. PPH-Jones-
Limestone Construction
Maddela Road (Km. 380+000- 82.54%
and Development 4453 II 8.200 C 0.256 0.300 0.300 - - - 85.60
Km.384+320)cDivisoria Norte- V. Satisfactory
Corporation
San Bernabe Sect.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 246
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Miputak-Turno By
Liong-Co Construction &
28361 Pass Road with Drainage IX 4.716 O 0.256 0.156 0.100 0.030 0.037 0.200 77.90 -
Construction Supply
Components
Liong-Co Construction & *92.90%
28361 Conc. of FMR at Purok Gampis IX 0.951 C 0.344 0.285 0.300 - - - 92.90
Construction Supply Outstanding
Const./Completion of Multi-
Liong-Co Construction & *90.20%
28361 Purpose Building (Perimeter IX 0.089 C 0.302 0.300 0.300 - - - 90.20
Construction Supply Outstanding
Fence)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 247
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*83.90%
LLM Concrete Products 14235 Const. of MPB @ Poblacion XI 1.885 C 0.239 0.300 0.300 - - - 83.90
V.Satisfactory
Const. of Multi-Purpose (Brgy 92.90%
LLM Concrete Products 14235 XI 0.755 C 0.378 0.300 0.300 - - - 97.80
Hall) Bato Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 248
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Conc. Paving of
71.36%
LMD Construction 9410 Kagawasan-Pitogo Road IX 4.595 C 0.353 0.300 0.300 - - - 95.30
Satisfactory
(Kagawasan Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 249
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 250
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Impvt. of Catanduanes
Lo Tone Construction & 90.14%
23385 Circ. Road (Tibang-Puting V 28.495 C 0.393 0.293 0.300 - - - 98.60
Supply Outstanding
Baybay Section)
*86.10%
Lotrim Construction Inc. 12273 Rehab. of MPB XI 4.715 C 0.361 0.200 0.300 - - - 86.10
V.Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 251
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*80.90%
Lumel Glenn Construction 26817 Conc. of Sitio Tabtabong Road IV-B 1.413 C 0.209 0.300 0.300 - - - 80.90
V. Satisfactory
Const. of Drainage Canal @ Don
Lumel Glenn Construction 26817 IV-B 1.875 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -
Pedro
87.48%
Lumel Glenn Construction 26817 Rehab. of Calapan South Road IV-B 3.782 C 0.358 0.200 0.300 - - - 85.80
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 252
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Reconst. of Quezon-Mapawa-
LVRO Construction and 82.10%
18116 Capalyan-Espina-Navarro Road- XIII 4.100 C 0.321 0.200 0.300 - - - 82.10
Supply V. Satisfactory
Arellano District
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 253
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Bambang-Kasibu-
M M Construction 12012 Quezon-Solano Road (Labni II 14.225 O 0.370 0.240 0.100 0.030 0.033 0.067 84.00 -
Section)
Rehab./Reconst. of Damaged
National Roads, Daang
M M Construction 12012 II 14.468 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -
Maharlika, Poblacion Villaflores
Section
Asphalt Overlay/Patching of
M. Montesclaros 84.80%
6506 Bituminous Pavement @ Sayre X 9.338 C 0.387 0.200 0.300 - - - 88.70
Enterprises, Inc. V. Satisfactory
Highway
M. Montesclaros
6506 Const. of MPB @ Palacapao X 9.375 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -
Enterprises, Inc.
M. Montesclaros
6506 Const. of MPB @ Palacapao X 9.375 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -
Enterprises, Inc.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 254
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Proposed
M. Montesclaros 93.85%
6506 Development of DPWH Ver X 9.375 C 0.399 0.300 0.300 - - - 99.90
Enterprises, Inc. Outstanding
Overview Bldg.
Conc. of Caibiran-Cabucgayan
M.B. Ang Construction and
25001 National Circ. Road (Uson- VIII 3.725 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
Supply
Gamay Section)
85.47%
M.C. Torio Construction 10534 Alibadabad CPIP NIA-II 2.193 C 0.300 0.296 0.300 - - - 89.60
V. Satisfactory
Const. of MPB (Community *90.00%
M.C. Torio Construction 10534 II 0.283 C 0.400 0.200 0.300 - - - 90.00
Center) V. Satisfactory
Delfin Albano Communal Pump 82.3%
M.C. Torio Construction 10534 NIA-II 8.706 C 0.298 0.240 0.300 - - - 83.80
Irrigation Project V.Satisfactory
M.C.B. Zamora Const. of MPB at Brgy. *90.80%
32006 III 0.948 C 0.308 0.300 0.300 - - - 90.80
Construction & Supplies Calangain Outstanding
M.C.B. Zamora *95.90%
32006 Const. of MPB at Poblacion III 2.845 C 0.380 0.279 0.300 - - - 95.90
Construction & Supplies Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 255
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. of Baguio-Bontoc-Banaue
81.58%
M.G. Samidan Construction 16779 Road, Conc. of Mt. Data-Bontoc CAR 18.506 C 0.348 0.100 0.300 - - - 74.80
V. Satisfactory
Road, Km. 352+980-Km. 355+621
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 256
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*96.20%
M.H. Southern Construction 5841 Const. of Multi-Purpose Building XII 0.370 C 0.362 0.300 0.300 - - - 96.20
Outstanding
*79.10%
M.J. Apin Builders 12179 Const. of Sch. Bldg. Patong E/S V 0.468 C 0.291 0.200 0.300 - - - 79.10
Satisfactory
*87.70%
M.R. Santiago Construction 27329 Conc. of Road, Brgy. Maguinao III 0.947 C 0.377 0.200 0.300 - - - 87.70
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 257
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*91.20%
M.R. Santiago Construction 27329 Rehab. of Camias-Sibut Road III 5.709 C 0.312 0.300 0.300 - - - 91.20
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 258
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 259
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 260
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 261
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
86.98%
Maghuyop Construction 21641 Conc. of FMR VII 1.925 C 0.343 0.300 0.300 - - - 94.30
V. Satisfactory
83.88%
Maghuyop Construction 21641 Concreting of Road VII 2.784 C 0.345 0.222 0.300 - - - 86.70
V. Satisfactory
Const. of 2 CL Sch. Bldg. w/o CR 88.98%
Maghuyop Construction 21641 VII 0.853 C 0.352 0.256 0.300 - - - 90.80
Guinacot H/S V. Satisfactory
Const. of 4 Cl Sch. Bldg. at *93.30%
Maghuyop Construction 21641 VII 1.435 C 0.333 0.300 0.300 - - - 93.30
Pondol E/S Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 262
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.77%
Makapa Corporation 30029 Const. of Multi-Purpose Building V 1.380 C 0.391 0.300 0.300 - - - 99.10
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 263
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 264
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 265
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
98.10%
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS XII 0.783 C 0.381 0.300 0.300 - - - *98.10
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 266
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 267
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Proposed Impv't./Conc. of
95.00%
Marcus Construction 12601 Labason-Gutalac Nat'l. Rd., IX 3.913 C 0.450 - 0.500 - - - 95.00
Outstanding
Antonio-Labason River Sect.
Reblocking/Conc. Along
Marcus Construction 12601 Cotabato-Davao Road, Sadaan XII 4.625 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -
Sect.
Rehab./Impvt. of Banisilan-
Guiling-Alamada-Libungan *93.20%
Marcus Construction 12601 XII 4.742 C 0.332 0.300 0.300 - - - 93.20
Road, (Kapayawe-Grebona Outstanding
Section)
Repair/Maintenance of Libungan
Flood Control (Slope Protection *92.50%
Marcus Construction 12601 XII 1.315 C 0.325 0.300 0.300 - - - 92.50
Upstream of Approach "B" of Outstanding
Libungan Bridge) Phase II
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 268
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Turod-Banquero
Mar-deb Construction &
6715 Concrete Overflow Bridge II 9.879 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -
Development
PhaseIII
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 269
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.60%
Margarita Construction 20201 Asphalt Overlay @ Brgy. Sucol IV-A 0.480 C 0.356 0.200 0.300 - - - 85.60
V. Satisfactory
Const. of 3-Cl School Building 94.68%
Margarita Construction 20201 III 1.415 C 0.479 - 0.500 - - - 97.90
(FFHNAS) Outstanding
Rehab. of Norzagaray-Bigte *85.70%
Margarita Construction 20201 III 5.709 C 0.257 0.300 0.300 - - - 85.70
Road V. Satisfactory
97.20%
Margarita Construction 20201 Upgrading of Banga Road III 2.838 C 0.472 - 0.500 - - - 97.20
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 270
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*86.30%
Marknest Construction 16818 Concreting of Barangay Road III 0.475 C 0.263 0.300 0.300 - - - 86.30
V. Satisfactory
*86.10%
Marknest Construction 16818 Const. of MPB @ Bo. Obrero E/S NCR 4.755 C 0.387 0.174 0.300 - - - 86.10
V. Satisfactory
Const./Repair/Completion of *93.90%
Marknest Construction 16818 III 0.954 C 0.381 0.258 0.300 - - - 93.90
Water Supply Outstanding
Marknest Construction and
*81.50%
Trading (Formerly: 16818 Const. of MPB at Nueva Victoria III 0.952 C 0.315 0.200 0.300 - - - 81.50
V. Satisfactory
Marknest Construction)
*79.80%
Marquin Construction 13332 Conc. of Roads at Brgy. Cogon VII 0.882 C 0.314 0.184 0.300 - - - 79.80
Satisfactory
Const. of 3 CL SB @ Guinsay 75.37%
Marquin Construction 13332 VII 1.825 C 0.310 0.262 0.300 - - - 87.20
NHS Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 271
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Marquin Construction 13332 Proposed Const. of Line Canal VII 0.963 O 0.316 0.200 0.100 0.022 0.025 0.200 86.30 -
*84.60%
Mar-vel Construction 23722 Conc. of Road @ Brgy. Real IV-A 0.289 C 0.346 0.200 0.300 - - - 84.60
V. Satisfactory
Conc. of Road @ Brgy. Uno *79.80%
Mar-vel Construction 23722 IV-A 4.801 C 0.298 0.200 0.300 - - - 79.80
going to Brgy. Rizal Satisfactory
*69.40%
Mar-Vel Construction 23722 Conc./Rehab. of Barangay Road IV-A 3.848 C 0.194 - 0.500 - - - 69.40
Fair
Const. Impv't. of Water Supply *96.90%
Mar-vel Construction 23722 IV-A 2.464 C 0.386 0.283 0.300 - - - 96.90
System Outstanding
*87.30%
Mar-vel Construction 23722 Const. of MPB @ Brgy. Puypuy IV-A 0.480 C 0.373 0.200 0.300 - - - 87.30
V. Satisfactory
*81.60%
Mar-vel Construction 23722 Const. of Roads at Brgy. Bucal IV-A 0.334 C 0.316 0.200 0.300 - - - 81.60
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 272
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Mash Construction 20806 Const. of MPB at Brgy. Mabini IV-A 1.444 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Const./Repair/Rehab. of Brgy.
91.10%
Matco Builders 12929 Rds. @ Brgy. Balibago & Ninoy III 3.768 C 0.411 - 0.500 - - - 91.10
Outstanding
Package II
CP 8: Impvt./Conc. of Surigao
Maverick & Wee Eng Joint Sur-Davao Oriental Coastal Road
JV-07-105 XI 191.290 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -
Venture (Manay-Boston) Baganga-Cateel
Section
Impv't/Conc. of Compostela- 97.10%
Maverick Builders 14466 XI 66.371 C 0.365 0.300 0.300 - - - 96.50
Cateel Road Outstanding
Construction of Covered
Mayokins Construction 31486 PUP 2.565 O 0.400 0.060 0.070 0.030 0.000 0.000 56.00 -
Walkway along Access Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 273
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Construction of Covered
Mayokins Construction 31486 PUP 2.565 O 0.397 0.131 0.050 0.015 0.016 0.033 64.20 -
Walkway along Access Road
MBB Construction 11363 MNR, Candon-Santiago Section I 18.920 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 274
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst.of Damaged
MBB Construction 11363 Nat'l Road, Candon-Salcedo I 18.990 O 0.305 0.160 0.100 0.008 0.022 0.067 66.20 -
Road
MBB Construction 11363 Sta. Maria-Burgos Road I 1.698 O 0.277 0.240 0.100 0.022 0.027 0.067 73.30 -
MBD General
Const. of Sagayon Bridge & 89.88%
Const./Duragold Trading & JV-05-014 X 23.811 C 0.396 0.300 0.300 - - - 99.60
Approaches V. Satisfactory
Const. (JV)
Conc. of Calamba-Baliangao
MBD General Construction 9991 X 16.180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -
Road
Const. /Cementing of
85.38%
MBD General Construction 9991 Circumferential Rd., from Purok X 0.811 C 0.294 0.300 0.300 - - - 89.40
V. Satisfactory
Brgy. Mobod to Brgy. Villaflor
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 275
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Rehab. of Multi-Purpose
Meditech Trade & Pavement along McArthur *84.60%
16545 III 2.809 C 0.346 0.200 0.300 - - - 84.60
Development Highway, Mabini, Gacutan and V. Satisfactory
Plaza del Rosario St.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 276
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab. of Catanauan-Lopez
Meditech Trade & Road (Additional Safety Warning *87.30%
16545 III 4.820 C 0.373 0.200 0.300 - - - 87.30
Development Device) km. 252+000 - km. V. Satisfactory
255+000
Repair/Rehab. & Installation of
Reflectorized Pavm't Stud along
Meditech Trade & *97.30%
16545 Malicboy-P. Burgos-Unisan- IV-A 9.643 C 0.373 0.300 0.300 - - - 97.30
Development Outstanding
Pototanin Rd. & Mulanay San
Narciso Rd.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 277
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 278
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
Mel-Jean Construction
16344 National Roads, Batangas-Lobo IV-A 19.298 O 0.303 0.300 0.100 0.030 0.028 0.100 86.10 -
Corporation
Road, Bacao Section
Melrobe Builders & Const. Const. of MPB CES and Sigaboy 79.04%
29752 XI 1.813 C 0.368 0.100 0.300 - - - 76.80
Supplies AVHS, Brgy. Poblacion Sigaboy Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 279
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Menjer Construction 22815 Construction of Perimeter Fence DOST 8.853 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 280
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Scoured
*73.70%
Meta Construction 28882 Shoulders along Jct.Ipil-Panang- II 0.257 C 0.214 0.223 0.300 - - - 73.70
Satisfactory
Quirino Bdry. Road, Dappig
*85.50%
MGDJ Construction 29352 Const. of MPB @ Brgy. Quezon IV-A 1.444 C 0.355 0.200 0.300 - - - 85.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 281
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*87.20%
MGDJ Construction 29352 Const. of Multi-Purpose Building IV-A 1.340 C 0.372 0.200 0.300 - - - 87.20
V. Satisfactory
*96.70%
MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 IV-A 0.191 C 0.367 0.300 0.300 - - - 96.70
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 282
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
80.46%
Min Construction 14656 Const. of MPB (Tribal Hall) IX 0.925 C 0.268 0.182 0.300 - - - 75.00
V.Satisfactory
*89.40%
Min Construction 14656 Const. of Tribal Hall at Poblacion IX 0.943 C 0.394 0.200 0.300 - - - 89.40
V. Satisfactory
*93.30%
Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road IX 9.628 C 0.333 0.300 0.300 - - - 93.30
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 283
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
89.50%
Mindanao Rock 23479 Const. of Flood Control Taguima X 0.479 C 0.404 - 0.500 - - - 90.40
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 284
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Daang
Maharlika along Calbayog-Allen *86.10%
Miracle Builders 28502 VIII 4.823 C 0.361 0.200 0.300 - - - 86.10
Road, km. 723+700 - km. 729+700 V. Satisfactory
with exceptions
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 285
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
93.40%
MN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao IX 0.947 C 0.434 - 0.500 - - - 93.40
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 286
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 287
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab. of Papaya-Malabing-
Monte Construction & Wangal-Binugawan-Tadji- *82.10%
19474 II 1.755 C 0.321 0.200 0.300 - - - 82.10
Supply Runruno Road (Kinalabasa V. Satisfactory
Section)
Conc. of Marleodes-Dilawa
Montphil Construction Section along Dipolog Punta- *85.00%
24285 IX 3.806 C 0.350 0.200 0.300 - - - 85.00
Corporation Dansullan Sergio Osmeña V. Satisfactory
National Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 288
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*91.70%
Morning Steel Construction 30698 Const. of Flood Control III 0.846 C 0.417 - 0.500 - - - 91.70
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 289
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
92.60%
MP Villegas Construction 16683 Administration Bldg. DOST 6.975 C 0.351 0.275 0.300 - - - 92.60
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 290
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Toledo-Tabuelan-San
*79.20%
Mulaña Construction 30708 Remegio Road (Antonio Y De Pio VII 7.606 C 0.323 0.169 0.300 - - - 79.20
Satisfactory
Highway)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 291
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 292
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.90%
N.B. Salbo Construction 6091 Conc. of Golden Shower St. X 0.942 C 0.359 0.200 0.300 - - - 85.90
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 293
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
a)Rep./Rehab. of H.E.Bldg. @
77.04%
N.M.E. Construction 22984 E.Delos Santos E/S b) Const. of NCR 2.419 C 0.375 - 0.500 - - - 87.50
Satisfactory
Add'l. CL @ AA Quezon E/S
*92.00%
N.M.E. Construction 22984 Completion of MPB @ Brgy. 589 NCR 1.443 C 0.320 0.300 0.300 - - - 92.00
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 294
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
61.10%
N.V. Balbuena Construction 12055 Const. of Gabon-Hacienda FMR III 2.805 C 0.330 - 0.500 - - - 83.00
Fair
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 295
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab./Widening/Regrave 85.88%
Nale Construction 18552 VII 0.697 C 0.400 0.100 0.300 - - - 80.00
lling of FMR, Cantabon-Luzong V.Satisfactory
*82.50%
NBL Construction 30396 Conc. of FMR @ Brgy. Dao IV-A 1.888 C 0.325 0.200 0.300 - - - 82.50
V. Satisfactory
*89.80%
NBL Construction 30396 Conc. of Palico-Cadre Road IV-A 7.497 C 0.308 0.290 0.300 - - - 89.80
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 296
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc./Const./Rehab. of Bauan-
NBL Construction 30396 Mabini Circ. Road, Malimotoc I IV-A 19.295 O 0.292 0.300 0.100 0.030 0.030 0.100 85.20 -
Section
Const. of Bauan-Mabini Circ. *92.60%
NBL Construction 30396 IV-A 11.571 C 0.326 0.300 0.300 - - - 92.60
Road Outstanding
Const. of Gasang Seawall, Phase *81.10%
NBL Construction 30396 IV-A 3.134 C 0.311 0.200 0.300 - - - 81.10
II V. Satisfactory
Widening/Conc. of BauanMabini
*90.40%
NBL Construction 30396 Circ. Road, San Teodoro-Mainit IV-A 19.289 C 0.304 0.300 0.300 - - - 90.40
Outstanding
Section, Phase I
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 297
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 298
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 299
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.339 0.300 0.070 0.020 0.023 0.067 81.90 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -
SL2-
Nippon Steel Corp./Toa SN/000598 Second Magsaysay Bridge & 94.86%
PJHL 2,158.802 C 0.366 0.300 0.300 - - - 96.60
Corp. (JV) /FC-04- Butuan City By Pass Road Outstanding
001
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 300
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 301
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 302
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion/Const. of Subic-
Northern Builders/Hanjin *71.10%
FC-06-007 Cawag-Balaybay Road, Phase II III 119.113 C 0.211 0.200 0.300 - - - 71.10
(JV) Satisfactory
(Segment 4)
Conc. of Banisilan-Guiling-
Northern Cotabato 81.86%
15515 Alamada-Libungan Road XII 4.785 C 0.357 0.200 0.300 - - - 85.70
Construction and Supply V. Satisfactory
(Camansi-Nicaan Section)
Conc. of Kidapawan-Calunasan-
Northern Cotabato 92.88%
15515 M'lang Road Magsaysay- XII 5.290 C 0.454 - 0.500 - - - 95.40
Construction and Supply Outstanding
Maligaya Sect.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 303
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 304
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
86.50%
OIC Construction & Supply 23727 Waterworks Project (Level I) IV-A 2.468 C 0.389 0.200 0.300 - - - 88.90
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 305
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Widening/Conc. of Bontoc-
Tabuk-Tuguegarao Road, Phase
Omengan Construction and
5119 VI, Mamaga Bridge-Basao CAR 83.149 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -
Development Corporation
Bridge, Km. 420+970-
Km.429+940
Impvt./Widening/Conc. of Bontoc-
Tabuk-Tuguegarao Road,
Omengan Construction and *93.60%
5119 Tinglayan Bdry.-Lubuagan- CAR 14.465 C 0.336 0.300 0.300 - - - 93.60
Development Corporation Outstanding
Tabuk Sect. II Km. 472+500-
Km.495+500
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 306
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.50%
On Top Construction 32696 Const. of Salingao Flood Control CAR 0.238 C 0.355 0.200 0.300 - - - 85.50
V.Satisfactory
*81.70%
On Top Construction 32696 Const./Conc. of Singi FMR CAR 0.238 C 0.317 0.200 0.300 - - - 81.70
V.Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 307
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Multi-Purpose
Orani Builders Supply 5349 VII 0.472 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -
Building
Orguer Trading & Concreting of Road at Brgy. 84.60%
17111 IV-A 0.286 C 0.346 - 0.500 - - - 84.60
Construction Concepcion V. Satisfactory
Orguer Trading & Const. of Multi-Purpose Building *88.90%
17111 IV-A 0.477 C 0.289 0.300 0.300 - - - 88.90
Construction @ Brgy. Poblacion V.Satisfactory
Orguer Trading & *58.30%
17111 Repair of Hanging Bridge IV-A 0.190 C 0.083 - 0.500 - - - 58.30
Construction Poor
Const./Impvt. of Paclasan *82.00%
Orient Star Construction 7183 IV-B 1.881 C 0.320 0.200 0.300 - - - 82.00
Seawall V.Satisfactory
*90.10%
Orient Star Construction 7183 Rehab. of CSR Bansud Section IV-B 4.710 C 0.301 0.300 0.300 - - - 90.10
Outstanding
Repair/Maintenance of Cagancan *83.60%
Orient Star Construction 7183 IV-B 1.887 C 0.336 0.200 0.300 - - - 83.60
River Control V.Satisfactory
Conc. of Abra-Cervantes Road
Oriental Sales Center & 51.14%
3816 (km. 431+589 to Km. 432+185), CAR 4.730 C 0.293 0.186 0.300 - - - 77.90
Contractor Poor
Lagangilang Section
Oriental Sales Center &
3816 Const. of Bridge (Phase I) I 0.958 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -
Contractor
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 308
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Slope
P. C. Panopio Construction *76.70%
32824 Protection of Flood Control III 1.402 C 0.267 0.200 0.300 - - - 76.70
and Trading Satisfactory
along Camachile River
*87.60%
P.B. Grey Construction 13383 Rehab. of Road @ Litex Village IVA 1.303 C 0.376 0.200 0.300 - - - 87.60
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 309
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
P.B. Obial Construction 16784 Const. of Pedestrian Overpass VII 3.678 O 0.312 0.240 0.100 0.010 0.044 0.100 80.60 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 310
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 311
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening of Cotabato-Allah-
P.L. Sebastian 82.98%
1076 General Santos National Rd. XII 6.170 C 0.436 - 0.500 - - - 93.60
Construction V. Satisfactory
Poblacion Shariff Aguak Sect.
Completion/Continuation of
P.T. Diamond Merchandise Unfinished/On-going Bridge, *82.90%
15451 I 3.542 C 0.329 0.200 0.300 - - - 82.90
& Construction Sapilang along Manila North Satisfactory
Road
Rehab./Slope Protection of
P.T. Diamond Merchandise
15451 Calaoaan, Tamurong FMR, I 0.474 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -
& Construction
Calaoaan
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 312
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 313
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 314
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Conc. of Dulawan-
Palmares General *92.40%
24657 Marbel Road (Kalandangan XII 9.450 C 0.335 0.289 0.300 - - - 92.40
Merchandise Outstanding
Sect.)
Panay East Coast Reblocking of Pototan-Bangga
26469 VI 4.255 O 0.314 0.300 0.100 0.030 0.043 0.067 85.40 -
Construction and Supply Polot-An Road
Pangasinan New Wilson Conc. of Palapad-Torres Road, *82.20%
8313 I 0.945 C 0.322 0.200 0.300 - - - 82.20
Lumber and Construction Brgy. Palapad V. Satistfactory
Pangasinan New Wilson Const. of Multi-Purpose Bldg. for *79.80%
8313 I 0.944 C 0.298 - 0.500 - - - 79.80
Lumber and Construction Boy Scout Satisfactory
Pangasinan New Wilson Const./Opening of Lipi Norte- *82.30%
8313 I 1.919 C 0.323 0.200 0.300 - - - 82.30
Lumber and Construction Pao Road (Phase II) V. Satistfactory
Concreting of FTMR @ Palina 88.90%
Paradox Construction 18557 I 0.479 C 0.389 - 0.500 - - - 88.90
East-Awed V. Satisfactory
Const. of Farm-to-Market Road 76.20%
Paradox Construction 18557 I 0.479 C 0.262 - 0.500 - - - 76.20
Brgy. Cabaruan Satisfactory
Construction of Farm-to-Market *87.20%
Paradox Construction 18557 I 0.477 C 0.272 0.300 0.300 - - - 87.20
Road V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 315
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 316
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impv't./Conc. of Binalay-Tamban
Partido Construction and 79.83%
20631 Road, Olag-Pequeño-Sitio- V 9.553 C 0.223 0.200 0.300 - - - 72.30
Supply Satisfactory
Malibtong-Antipolo Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 317
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Bontoc-
Lubuagan-Tabuk Rd., 69.85%
PBO Construction 18403 CAR 14.190 C 0.235 0.300 0.000 - - - 53.50
Mananggol, Lubuagan-Wales Fair
Brook, Tinglayan
Impvt./Widening/Conc. of Bontoc-
Tabuk-Tuguegarao Road, Phase
PBO Construction 18403 CAR 47.185 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -
IV, Km. 461+000-Km. 467+000,
Lubuagan-Cagaluan Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 318
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Romualdez-
Santor-Calaocan-San Pascual
PBO Construction 18403 CAR 9.537 O 0.256 0.240 0.100 0.015 0.030 0.100 74.10 -
Section, Babalag-Kinama-San
Francisco Section
Pentagon Industrial
Improvement/Widening of Manila
Development & Const. Co., 12796 III 87.050 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -
North Road (MNR) Package II
Inc
Pentagon Industrial
Development & Riprapping of Sapangbalen 60.86%
12796 III 0.941 C 0.167 0.300 0.300 - - - 76.70
Construction Company, Creek Fair
Incorporated
Performance Builders & 94.00%
5303 Const. of Calatrava Seawall IV-B 0.462 C 0.440 0.500 94.00
Dev't. Corp. Outstanding
Performance Builders & 80.13%
5303 Const. of Tan-Agan Bridge II IV-B 21.239 C 0.319 0.200 0.300 - - - 81.90
Dev't. Corp. V.Satisfactory
Performance Builders &
5303 Desilting of Dubduban River IV-B 0.281 O 0.267 0.200 0.033 0.067 0.250 81.70 -
Dev't. Corp.
Persan Const. Inc.
Replacement of Loboc Bailey
(Formerly: Persan 2852 VII 11.564 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -
Bridge
Construction)
Asphalt Overlay of Putiao-Pilar-
93.94%
Persan Construction, Inc. 2852 Donsol Road (Putiao-Bayasong V 40.123 C 0.397 210.000 0.300 - - - 90.70
Outstanding
Section)
Improvement/asphalting of
70.70%
Persan Construction, Inc. 2852 Panglao Island Circumferential VII 38.360 C 0.330 0.287 0.000 - - - 61.70
Satisfactory
Road
Improvement/Const. of Bridge
91.56%
Persan Construction, Inc. 2852 along Panabo Coastal Road XI 28.764 C 0.436 - 0.500 - - - 93.60
Outstanding
(Arieta Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 319
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Conc. of Kapalong-
Persan Construction, Inc. 2852 XI 53.764 O 0.382 0.300 0.050 0.030 0.045 0.067 87.40 -
Talaingod Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 320
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*97.70%
Peter G. Chua Builders 25367 Conc. of Gil Puyat Ave. NCR 4.768 C 0.377 0.300 0.300 - - - 97.70
Outstanding
79.08%
Peter G. Chua Builders 25367 Const. of Bridge at Pamplona 3 NCR 4.609 C 0.319 0.200 0.300 - - - 81.90
Satisfactory
Const. of MPB, Phase II @ 84.36%
Peter G. Chua Builders 25367 NCR 1.048 C 0.373 0.200 0.300 - - - 87.30
Pulanglupa I V. Satisfactory
Improvement/Concreting of 77.02%
Peter G. Chua Builders 25367 NCR 0.961 C 0.278 0.200 0.300 77.80
Merville-Moonwalk Access Road Satisfactory
83.53%
Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS X 1.394 C 0.357 0.200 0.300 - - - 85.70
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 321
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reblocking of
PGO Construction 15153 Deteriorated Conc. Pavement VI 9.231 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -
along Bacolod North Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 322
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Reconst./Replacement of
Philworks Construction 84.87%
32103 Damaged Bridge, Traversia V 23.269 C 0.355 0.200 0.300 - - - 85.50
and Supply V. Satisfactory
Bridge 1
Road Opening/Upgrading of
Philworks Construction
32103 Uson-Tampuhan-Mambayawas- V 9.458 O 0.328 0.300 0.100 0.030 0.033 0.100 89.10 -
and Supply
Awayan
Ban-May-Agui-A. Lista Isabela
Phranaret Construction 16878 CAR 3.195 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -
Brgy. Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 323
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 324
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Unpaved
86.80%
Polangui Construction 8660 Shoulder with Reblocking San V 0.360 C 0.368 - 0.500 - - - 86.80
V. Satisfactory
Jose
Road Const./Rehab. @ *86.00%
Polangui Construction 8660 V 0.377 C 0.360 0.200 0.300 - - - 86.00
Bongoran V.Satisfactory
Const. of 2 CL School Bldg. @ 86.43%
Polymer-vic Construction 6157 III 0.865 C 0.293 0.090 0.300 - - - 68.30
Luakan NHS V.Satisfactory
Rehab./Impvt./Asphalt Overlay of
Polymer-vic Construction 6157 Gapan-San Fernando-Olongapo III 4.794 O 0.358 0.298 0.100 0.030 0.023 0.100 90.90 -
Road (Phase I)
Rehab./Impvt./Asphalt Overlay of
Polymer-vic Construction 6157 Gapan-San Fernando-Olongapo III 4.794 O 0.389 0.300 0.100 0.030 0.023 0.100 94.20 -
Road (Phase II)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 325
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 326
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 327
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 328
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
QM Builders 30743 Const. of Multi-Purpose Building VII 1.056 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -
*80.00%
QM Builders 30743 Const. of Pakigne Flood Control VII 2.862 C 0.300 0.200 0.300 - - - 80.00
Satisfactory
Impv't./Concreting of Kang-Actol 83.96%
QM Builders 30743 VII 1.088 C 0.429 - 0.500 - - - 92.90
Brgy. Rd. V. Satisfactory
Rehab. & Repair of Brgy. Road *81.10%
QM Builders 30743 VII 0.930 C 0.311 0.200 0.300 - - - 81.10
@ Brgy. Manlapay V.Satisfactory
Repair/Rehab. of Sibunga-
*91.10%
QM Builders 30743 Dumanjug Rd. (km. 51+950 - km. VII 9.645 C 0.311 0.300 0.300 - - - 91.10
Outstanding
53+298)
Repair/Rehab. of Tangke *82.40%
QM Builders 30743 VII 0.918 C 0.324 0.200 0.300 - - - 82.40
Drainage V.Satisfactory
Repair/Rehab./Conc. of Trocio *86.70%
QM Builders 30743 VII 5.158 C 0.367 0.200 0.300 - - - 86.70
St. Brgy. Poblacion V.Satisfactory
Repair/Rehab./Impvt. of Simala- *92.40%
QM Builders 30743 VII 9.478 C 0.324 0.300 0.300 - - - 92.40
Lindogon Brgy. Road Outstanding
Const. of Two Classroom School 92.50%
Quality Builder Corporation 17790 VII 1.350 C 0.425 - 0.500 - - - 92.50
Bldg Outstanding
Concreting of Road @ Sitio 86.10%
Queen City Builders 21535 XI 0.611 C 0.361 - 0.500 - - - 86.10
Habitat Coronon V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 329
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 330
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
R N V Construction 12570 Rehab./Impvt. of Romblon DEO IV-B 4.693 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 331
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 332
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*84.70%
R.A. Abaño Construction 11828 Const. of Farm-to-Market Road IV-A 0.653 C 0.347 - 0.500 - - - 84.70
V. Satisfactory
Const. of Multi-Purpose Bldg. At 96.40%
R.A. Abaño Construction 11828 IV-A 0.236 C 0.464 - 0.500 - - - 96.40
Brgy. Malinao-Ilaya Outstanding
Rehab./Impvt. of Maculcol
R.A. Pahati Gravel and *73.70%
22495 Dike/Approach including Impvt. III 7.795 C 0.280 0.157 0.300 - - - 73.70
Sand Satisfactory
Of Access Road
R.A. Pahati Gravel and Rehab./Impvt. of River Banks *85.00%
22495 III 3.856 C 0.350 0.200 0.300 - - - 85.00
Sand (Abitonan River) V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 333
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
R.A.M. Builders 10549 Rehab./Impvt. of MSR-Old Route IV-A 14.328 O 0.315 0.300 0.100 0.020 0.030 0.100 86.50 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 334
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
75.50%
R.C. Tagala Construction 11597 Const. of Boac River Control IV-B 3.981 C 0.282 - 0.500 - - - 78.20
Satisfactory
90.90%
R.C. Tagala Construction 11597 Const. of Libtangin River Control IV-B 4.748 C 0.313 0.296 0.300 - - - 90.90
Outstanding
Const. of Manggamnan Bridge
R.C. Tagala Construction 11597 IV-B 1.672 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -
Approach
Const. of Pagbahan Flood
R.C. Tagala Construction 11597 IV-B 13.920 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -
Control (Phase I)
Const. of Sch. Bldg. (4 CL) Narra *84.50%
R.C. Tagala Construction 11597 IVB 3.789 C 0.345 0.200 0.300 - - - 84.50
Pilot Sch. V. Satisfactory
86.88%
R.C. Tagala Construction 11597 Const. of Taritien Bridge IV-B 4.230 C 0.369 0.300 0.300 - - - 96.90
V. Satisfactory
Const. of Various School Bldg. 80.34%
R.C. Tagala Construction 11597 IV-B 9.043 C 0.393 - 0.500 - - - 89.30
(Tagumpay E/S) V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 335
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 336
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Conc. of Bislig-Manay
R.D. Interior Junior
6483 Road (Boston-Bislig Sect. with XIII 289.168 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -
Construction
Monkag & San Vicente Bridge)
Impvt./Conc. of Bislig-Manay
R.D. Interior Junior
6483 Road (Boston-Bislig Sect. with XIII 289.168 O 0.326 0.300 0.100 0.030 0.038 0.100 89.40 -
Construction
Monkayo & San Vicente Bridge)
Impvt./Conc. of Bislig-Manay
R.D. Interior Junior
6483 Road (Boston-Bislig Sect. with XIII 289.168 O 0.294 0.281 0.100 0.022 0.055 0.100 85.20 -
Construction
Monkayo & San Vicente Bridge)
Impvt./Conc. of Bislig-Manay
R.D. Interior Junior
6483 Road (Boston-Bislig Sect. with XIII 289.168 O 0.352 0.300 0.100 0.030 0.055 0.100 93.70 -
Construction
Monkayo & San Vicente Bridge)
Construction of Overpasses
91.17%
R.D. Policarpio & Co., INC. 4414 Project in the Province of BCDA 208.033 C 0.351 0.300 0.300 - - - 95.07
Outstanding
Bataan, Pampanga and Tarlac
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 337
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP 6: Impvt./Conc. of Surigao
R.D. Policarpio Company, Sur-Davao Oriental Coastal Road
4414 XI 157.077 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -
Inc. (Manay-Boston) Baganga
Section Phase I
Impvt. (Widening/Conc. of
McArthur Highway (MNR)
R.D. Policarpio Company, Meycauayan (Bulacan) to
4414 III 45.805 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -
Inc. Mabalacat (Pampanga) Ph-IV
Package VII, Replacement of
Tinajero Bridge & App.
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 338
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
85.21%
R.F. Diaz Construction 3998 Impvt./Rehab. of MPB NCR 2.387 C 0.369 0.300 0.300 - - - 96.90
V. Satisfactory
68.54%
R.F.G. Construction 13188 Const. of MPB @ Brgy. 12 XIII 1.925 C 0.336 0.131 0.000 - - - 46.70
Fair
Const. of Municipal Public 81.86%
R.F.G. Construction 13188 XIII 1.795 C 0.311 0.300 0.300 - - - 91.10
Market, Phase III V. Satisfactory
Const. of Sabang Bridge III 90.14%
R.F.G. Construction 13188 XIII 9.167 C 0.364 0.300 0.300 - - - 96.40
Phase V Outstanding
Const. of Sabang Bridge III, 79.38%
R.F.G. Construction 13188 XIII 4.583 C 0.328 - 0.500 - - - 82.80
Phase IV Satisfactory
71.30%
R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB XIII 0.927 C 0.343 0.300 0.000 - - - 64.30
Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 339
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.49%
R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal III 0.930 C 0.272 0.300 0.300 - - - 87.20
V. Satisfactory
76.23%
R.J. Ibarra Construction 23538 Const. of MPB @ San Marcelino III 2.072 C 0.305 0.151 0.300 - - - 75.60
Satisfactory
Repair/Rehab. of Slope
Protection along Linasin Creek, *71.30%
R.J. Ibarra Construction 23538 III 1.930 C 0.213 0.200 0.300 - - - 71.30
San Marcelino-San Antonio Satisfactory
Road
R.K.X. Odiamar *86.50%
16107 Const. of MPB @ Penfrancia V 1.498 C 0.365 0.200 0.300 - - - 86.50
Construction V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 340
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*73.50%
R.M. Nuñez Construction 26206 Const. of Lower Bicutan Bridge NCR 3.297 C 0.235 0.200 0.300 - - - 73.50
Satisfactory
Repair/Replacement of Lined
Canal & Road Embankment 83.64%
R.M. Padillo Builders 31206 VIII 2.848 C 0.337 0.200 0.300 - - - 83.70
Protection at Daan Maharlika km. V.Satisfactory
903+400 - km. 906+200
86.10%
R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road III 4.026 C 0.361 - 0.500 - - - 86.10
V.Satisfactory
83.89%
R.M. Vitug Construction 9227 Const. of MPB III 0.931 C 0.313 0.200 0.300 - - - 81.30
V. Satisfactory
*82.80%
R.M. Vitug Construction 9227 Const./Impvt. of San Jose Road III 5.703 C 0.328 0.200 0.300 - - - 82.80
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 341
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Aritao-Dupax-Kasibu-
89.38%
R.O. Builders & Dev. Corp. 22393 Quirino Road, Mangagyang- II 6.566 C 0.366 0.172 0.300 - - - 83.80
V. Satisfactory
Banganan Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 342
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Aritao-Dupax-Kasibu-
R.O. Builders &
22393 Quirino Road, Mangayang II 16.182 O 0.351 0.279 0.100 0.020 0.033 0.067 85.00 -
Development Corporation
Section
*85.50%
R.O.M. Builders 28654 Conc. of Roads in Brgy. Kapito IV-A 0.471 C 0.355 0.200 0.300 - - - 85.50
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 343
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 344
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*82.10%
R.T. Morabe Construction 11377 Conc. of Municipal Road VIII 4.720 C 0.321 0.200 0.300 - - - 82.10
V.Satisfactory
Conc. of Oras-San Policarpio 61.20%
R.T. Morabe Construction 11377 VIII 9.430 C 0.341 0.109 0.000 - - - 45.00
Road Sect. Fair
Const. of Oras-Concepcion- 83.46%
R.T. Morabe Construction 11377 VIII 11.428 C 0.385 - 0.500 - - - 88.50
Jipapad Rd V.Satisfactory
*87.10%
R.T. Morabe Construction 11377 Impvt. of ABC Hall VIII 0.192 C 0.371 0.200 0.300 - - - 87.10
V.Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 345
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 346
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*86.70%
R.T.Y. Construction 10341 Const. of Line Canal IV-A 0.240 C 0.267 0.300 0.300 - - - 86.70
V. Satisfactory
Const. of Magsaysay Elem. *85.50%
R.T.Y. Construction 10341 IV-A 0.481 C 0.355 0.200 0.300 - - - 85.50
School V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 347
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Calbayog-Catarman
Road, Mag-ubay-Nabang Sect., 83.38%
R.V. Construction 6110 VIII 4.275 C 0.385 0.300 0.300 - - - 98.50
km.798+800-km. 803+500 w/ V. Satisfactory
exceptions
*82.50%
R.V. Construction 6110 Const. of Cabay Seawall VIII 2.821 C 0.325 0.200 0.300 - - - 82.50
V. Satisfactory
R.V. Construction 6110 Const. of Covered Court VIII 1.392 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 348
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
R.V. Laborte Builders 20459 Completio of Olongtao MPB IV-A 3.370 O 0.325 0.300 0.100 0.020 0.023 0.100 86.80 -
Concreting of Torrijos-
Buenavista Road with exception
90.14%
R.V. Laborte Builders 20459 Km.78+034-Km.78+463 (Marilao IV-B 8.687 C 0.314 0.300 0.300 - - - 91.40
Outstanding
Sect.) and Km.72+300-
Km.73+367, Banocboc Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 349
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*89.50%
R.V. Laborte Builders 20459 Const. of 1-Cl School Building IV-A 0.376 C 0.295 0.300 0.300 - - - 89.50
V. Satisfactory
85.76%
R.V. Laborte Builders 20459 Rehab. of FMR, Sitio Yungib IV-A 0.383 C 0.347 0.300 0.300 - - - 94.70
V. Satisfactory
Rehab./Impvt. of MSR-Jct.-
88.16%
R.V. Laborte Builders 20459 Tiaong Dolores Road (Asphalt IV-A 14.359 C 0.353 0.300 0.300 - - - 95.30
V. Satisfactory
Section)
Rehab./Recont. And Conc.
Paving of Mulanay-San 89.98%
R.V. Laborte Builders 20459 IV-A 9.640 C 0.361 0.300 0.300 - - - 96.10
Francisco-San Andres Nat'l V. Satisfactory
Road, San Andres Section
R.V. Rieta Trading & Gen. Conc. of Binakayan Diversion *95.90%
28671 IV-A 9.553 C 0.359 0.300 0.300 - - - 95.90
Construction Road Outstanding
R.V. Rieta Trading & Gen. Concreting of Roads at San *92.00%
28671 IV-A 0.288 C 0.320 0.300 0.300 - - - 92.00
Construction Rafael III Outstanding
R.V. Rieta Trading & Gen.
28671 Const. of 2 Storey MPB IV-A 0.575 O 0.295 0.263 0.100 0.030 0.018 0.100 80.60 -
Construction
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 350
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion (Impvt./Conc.
Rabbit Construction & Paving) of Licomo-Quiniput 77.46%
8545 IX 33.007 C 0.306 0.300 0.000 - - - 60.60
Development Corporation Road, Segment 1 (Sinoropan- Satisfactory
Vitali Section)
Rabbit Construction & Reconst. of Zamboanga City-
8545 IX 46.600 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -
Development Corporation Labuan-Limpapa Road
*86.00%
Rachel Faye Construction 30339 Conc. of Modayan-Kitongan FMR CAR 0.284 C 0.360 0.200 0.300 - - - 86.00
V. Satisfactory
Impvt./Rehab. of Drainage,
Rachki Enterprises *88.80%
17689 Marcos Highway (Intermittent IV-A 0.956 C 0.388 0.200 0.300 - - - 88.80
(Formerly: Geto Const.) V. Satisfactory
Sections)
Riprapping/Impvt. of Various
Rachki Enterprises *80.50%
17689 Brgys. (Package II) Upper East IV-A 2.586 C 0.305 0.200 0.300 - - - 80.50
(Formerly: Geto Const.) V. Satisfactory
Kamias Creek
Const. of DPWH Ifugao DEO, 71.22%
Racso Construction 14601 CAR 2.378 C 0.339 0.118 0.000 - - - 45.70
Phase II Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 351
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Conc. of Banaue-
70.72%
Racso Construction 14601 Hungdan-Tinoc-Benguet Bdry. CAR 1.899 C 0.351 0.088 0.300 - - - 73.90
Satisfactory
Road, Gohang-Ujah Section
Raf General Construction 6699 Const. of Baguinge-Mappit FMR CAR 0.465 O 0.322 0.196 0.100 0.007 0.030 0.100 *75.50 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 352
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Deepening/Earthdiking of
*90.00%
Ramar Enterprises 8092 Nancascasan River, Balangibang- V 19.155 C 0.400 - 0.500 - - - 90.00
V. Satisfactory
Apad-Lanigay Sect.
91.46%
Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road V 4.738 C 0.371 0.300 0.300 - - - 97.10
Outstanding
Ramconstrack Dev't Rehab. of Old Hospital Building, 55.97%
22821 II 1.904 C 0.297 0.200 0.300 - - - 79.70
Services & Supplies Malasin Poor
Concreting of Siquijor
Ramona Construction and 92.06%
14661 Circumferential Road Sta. 0+000- VII 1.867 C 0.341 0.300 0.300 - - - 94.10
Enterprises Outstanding
Sta.0+130
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 353
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
62.62%
Rano's Construction 11433 Const. of Public Market XII 1.366 C 0.358 0.300 0.300 - - - 95.80
Fair
Repair/Rehab. & Impv't. of 80.00%
Rano's Construction 11433 XI 4.815 C 0.300 - 0.500 - - - 80.00
Cabidianan-Mainit Sect. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 354
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 355
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 356
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*85.40%
RD Cobacha Construction 8878 Const. of MPB @ Brgy. Lamak VIII 0.950 C 0.354 0.200 0.300 - - - 85.40
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 357
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. of Multi-Purpose
Redcar Trading & *89.30%
27368 Pavement @ Victoria Homes E/S NCR 2.372 C 0.387 0.206 0.300 - - - 89.30
Construction V. Satisfactory
(Tunasan E/S Annex)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 358
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Regenterprises Const.
Const. of Abatan E/S School 71.32%
*Fabrication* Supplies & 17177 II 0.442 C 0.328 0.137 0.300 - - - 76.50
Bldg. Satisfactory
Gen. Services
Regenterprises Const.
Const. of Drainage along Daang
*Fabrication* Supplies & 17177 II 4.649 O 0.310 0.157 0.100 0.030 0.044 0.200 84.10 -
Maharlika
Gen. Services
Regional Infrastructure Conc. of Bah-bah-Prosperidad *84.70%
26373 XIII 2.819 C 0.347 0.200 0.300 - - - 84.70
Development Corporation Road V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 359
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Gurel-Bokod-Kabayan
81.53%
Reko General Konstruct 14663 Buguias Road, km. 304+240-Km. CAR 6.669 C 0.355 0.100 0.300 - - - 75.50
V. Satisfactory
394+978
73.82%
Rely Construction & Supply 10433 Conc. of Bislig-Trento Road XIII 18.949 C 0.152 0.300 0.300 - - - 75.20
Satisfactory
Conc. of Juction Lingig-Trento
Rely Construction & Supply 10433 XIII 28.878 O 0.342 0.212 0.100 0.030 0.043 0.100 82.70 -
Road
76.90%
Rely Construction & Supply 10433 Const. of Bigaan Bridge XIII 14.383 C 0.230 0.200 0.300 - - - 73.00
Satisfactory
76.60%
Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon XI 1.886 C 0.379 0.060 0.300 - - - 73.90
Satisfactory
84.30%
Rely Construction & Supply 10433 Const. of Flood Control XI 4.381 C 0.301 0.200 0.300 - - - 80.10
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 360
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rely Construction & Supply 10433 Impvt. of Cadalian-Baguio Road XI 14.164 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -
Rehab./Impv't. of Tagum-
Asuncion-Kapalong-Sto. Tomas- *86.00%
Rely Construction & Supply 10433 XI 14.461 C 0.360 0.200 0.300 - - - 86.00
Dapecol-Panabo Circ. Road, V. Satisfactory
Kapalong-Sto. Tomas Sect.
Repair/Rehab. of T-A-K-ST.-D-P
*91.90%
Rely Construction & Supply 10433 Circ. Road and Jct. Agusan- XI 4.714 C 0.319 0.300 0.300 - - - 91.90
Outstanding
Davao Road-Panabo Wharf Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 361
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rene T. Bayawa
Const. of 1 Unit 2 CL School *78.90%
Construction & Hauling 20740 IX 0.757 C 0.275 0.214 0.300 - - - 78.90
Bldg. @ Balok E/S Satisfactory
Services
Rene T. Bayawa
Repair/Rehab. of Library Bldg. at *87.00%
Construction & Hauling 20740 IX 0.283 C 0.270 0.300 0.300 - - - 87.00
Sindangan NHS V. Satisfactory
Services
Completion of Itbud Diversion 95.80%
RENZ Const. & Trading 25605 II 0.479 C 0.458 - 0.500 - - - 95.80
Road Outstanding
Rehab./Reconst. of Damaged
Revere Construction & National Roads, Batangas- *90.50%
17426 IV-A 14.470 C 0.313 0.292 0.300 - - - 90.50
Supply Quezon Road, Padre Garcia Outstanding
Section
Revere Construction & Road Upgrading of Talisay-
17426 IV-A 13.506 O 0.323 0.300 0.100 0.030 0.033 0.100 88.60 -
Supply Laurel-Agoncillo Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 362
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
97.66%
Reydan Builders 13059 Const. of Pedestrian Overpass XI 4.718 C 0.395 0.293 0.300 - - - 98.80
Outstanding
Const. of San Felipe RCDG 84.88%
Reydan Builders 13059 XII 3.856 C 0.387 0.145 0.300 - - - 83.20
Bridge V. Satisfactory
88.91%
Reydan Builders 13059 Const. of Shadol I Bridge XII 4.308 C 0.381 0.293 0.300 - - - 97.40
V. Satisfactory
Conc. of Various Municipal and
Reyrose Construction 20748 II 1.149 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -
Brgy. Roads
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 363
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*92.80%
RGP Builders 20680 Const. of Water Works System III 0.288 C 0.428 - 0.500 - - - 92.80
Outstanding
92.50%
RGS Construction 14095 Concreting of Purok 4, FMR IX 0.180 C 0.425 - 0.500 - - - 92.50
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 364
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt. of Manikling-Lavigan
Rhodwill Parts and *90.90%
18871 Road (Cambaleon-Talisay XI 14.470 C 0.309 0.300 0.300 - - - 90.90
Hardware Outstanding
Section)
Rhodwill Parts and Impvt./Rehab. of Manhoc-Ban-ao
18871 XI 9.605 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -
Hardware Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 365
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
87.98%
Rim Construction 15938 Conc. of Bulanao-Paracelis Road CAR 3.199 C 0.393 - 0.500 - - - 89.30
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 366
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Ritche-Nathalie Builders
27501 Tangub-Polao By-Pass Road X 8.582 O 0.339 0.300 0.100 0.023 0.045 0.100 90.70 -
and General Merchandise
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 367
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 368
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Sinucalan
92.48%
Roadtech Construction 17580 Bridge along Urd. Jct.-Dagupan I 2.704 C 0.375 - 0.500 - - - 87.50
Outstanding
Rd
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 369
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 370
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 371
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
83.31%
Romina Construction 32090 Const. of MPB at G. Perfecto H/S NCR 2.989 C 0.381 0.200 0.300 - - - 88.10
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 372
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of Catangan-Cabitoonan-
Ronwood Const. Supply 25311 XIII 9.644 O 0.284 0.213 0.100 0.030 0.032 0.100 75.90 -
Libertad Road & Bridges
93.48%
Ronwood Const. Supply 25311 Const. of Drainage System XIII 0.928 C 0.381 0.300 0.300 - - - 98.10
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 373
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 374
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 375
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 376
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Regravelling incl.
Royal Sea Bees 81.50%
30099 slope protection & drainag of CAR 4.787 C 0.326 0.237 0.300 - - - 86.30
Construction V. Satisfactory
Bontoc-Lubuagan-Tabuk Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 377
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of Flood
*91.90%
RSP Enterprises Inc. 16795 Control/Drainage, Guadalupe XI 0.661 C 0.319 0.300 0.300 - - - 91.90
Outstanding
Village, Matina Crossing
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 378
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
Rusmen Builders & National Roads, Banay-Banay- *91.40%
10674 IV-A 13.509 C 0.347 0.267 0.300 - - - 91.40
Development Corporation Cuenca-Mojon Road, San Jose Outstanding
Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 379
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehabilitation of Various
S.J. Yu Construction 17048 Buildings @ C.L. Montelibano VI 4.090 O 0.361 0.195 0.000 - - - 55.60 -
Regional Hospital
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 380
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.90%
San Fernando Builders 21295 Const. of Multi-Purpose Bldg. I 2.846 C 0.349 0.300 0.300 - - - 94.90
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 381
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 382
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
82.92%
Santech Builders 16797 Const. of Multi-Purpose Building XIII 4.652 C 0.274 0.300 0.300 - - - 87.40
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 383
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening of Makar-Tupi-Marbel
81.26%
Sarangani Rockmixer 6549 Road (Labangal-Apopong XII 7.150 C 0.369 0.200 0.300 - - - 86.90
V. Satisfactory
Section)
87.70%
Sarex Builders 23734 Conc. of Road at Brgy. Dagupan XII 0.469 C 0.335 0.287 0.300 - - - 92.20
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 384
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*95.20%
Sarex Builders 23734 Const. of MPB XII 0.286 C 0.388 0.264 0.300 - - - 95.20
Outstanding
*93.00%
Sarex Builders 23734 Const. of MPB @ Brgy Ilbocean XII 0.330 C 0.330 0.300 0.300 - - - 93.00
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 385
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 386
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
Paved National Roads along
SCP Construction 8797 X 18.867 O 0.365 0.240 0.100 0.030 0.035 0.067 83.70 -
Butuan City-Cagayan de Oro
City-Iligan City Road
SCV Construction 14523 Const. of Multi-Purpose Building X 0.933 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 387
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
88.26%
Settlers Builder 21643 Const. of Libonan Bridge VI 7.199 C 0.400 0.200 0.300 - - - 90.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 388
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 389
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Silliman Avenue
22759 Completion of MPB VII 0.870 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -
Construction & Supply
Silliman Avenue Const. of Provincial Road-Purok 79.64%
22759 XI 0.469 C 0.324 0.000 0.500 0.000 0.000 0.000 82.40
Construction & Supply 2 Sulop Cemetery Satisfactory
Silliman Avenue Const./Completion of San Jose *88.30%
22759 XIII 2.595 C 0.383 - 0.500 - - - 88.30
Construction & Supply Public Market (Phase II) V. Satisfactory
Const. of Bucayao-Magasawang
Sixteen Enterprises - 89.60%
18187 Tubig River Flood Control IV-B 4.038 C 0.417 0.000 0.500 0.000 0.000 0.000 91.70
Calapan Branch V. Satisfactory
Mitigation Projects
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 390
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Iligan-Cagayan
Socor Construction *96.00%
8020 de Oro-Butuan Road (Initao- X 14.305 C 0.360 0.300 0.300 - - - 96.00
Corporation Outstanding
Lugait Section)
Rehab./Impvt. of Asphalt
Socor Construction *95.50%
8020 Pavement along Sulat-Borongan VIII 9.461 C 0.355 0.300 0.300 - - - 95.50
Corporation Outstanding
Road Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 391
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab./Impvt. of National
Socor Construction *82.50%
8020 Road (Asphalt Overlay) VIII 24.115 C 0.325 0.200 0.300 - - - 82.50
Corporation V. Satisfactory
Borongan-Guiuan
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 392
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Conc. of *95.30%
Solid Rock Construction 8958 NCR 48.138 C 0.353 0.300 0.300 - - - 95.30
Commonwealth Ave. Outstanding
Completion/Repair of
Widening/Slope Protection along 94.16%
Soy Eng Construction 15533 IX 2.788 C 0.359 0.300 0.300 - - - 95.90
Rizal Shrine-Rizal Town Coastal Outstanding
Loop Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 393
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Completion of
*83.90%
Soy Eng Construction 15533 Multipurpose Bldg., Jose Rizal IX 0.703 C 0.345 0.194 0.300 - - - 83.90
V. Satisfactory
Memorial State College
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 394
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of Concreting of
72.24%
SPNR Builders 31329 Road & Drainage Canal @ III 3.796 C 0.062 0.292 0.300 - - - 65.40
Satisfactory
Guinhawa
Rehab. of Roman Expressway *94.70%
SPNR Builders 31329 III 2.880 C 0.347 0.300 0.300 - - - 94.70
(Bilolo Section) Outstanding
*84.90%
SPNR Builders 31329 Road Concreting at Sta. Cruz III 0.477 C 0.349 0.200 0.300 - - - 84.90
V. Satisfactory
Const. of S.B. Sen. Rene
Spring Star Construction *97.20%
20240 Cayetano Science & Technology NCR 2.865 C 0.372 0.300 0.300 - - - 97.20
and Supply Outstanding
Memorial H/S
Const. of Multi-Purpose Bldg., 88.06%
Springfield Construction 14097 III 0.473 C 0.368 0.263 0.300 - - - 93.10
(Public Market) V. Satisfactory
Const. of Sto. Niño Public *94.40%
Springfield Construction 14097 IV-B 1.800 C 0.344 0.300 0.300 - - - 94.40
Market Outstanding
Square Cube Trading
Completion of MPB @ del 36.94%
Division and Consruction 25120 VII 0.093 C 0.276 0.100 0.300 - - - 67.60
Carmen Este Poor
Division
Square Cube Trading
Conceting/Improvement of Loay 71.66%
Division and Consruction 25120 VII 14.155 C 0.384 0.239 0.000 - - - 62.30
and Carmen Satisfactory
Division
Square Cube Trading
Impvt. of MPB @ Brgy. *88.90%
Division and Consruction 25120 VII 0.948 C 0.289 0.300 0.300 - - - 88.90
Kalunasan V. Satisfactory
Division
Square Cube Trading Const. of Farm-to-Market Road
Division and Construction 25120 (Sta. 0+000-Sta. 3+820) Brgy. VII 9.439 O 0.311 0.024 0.100 0.010 0.013 0.100 55.80 -
Division Capt. Claudio
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 395
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Sta. Anastacia Builders 32472 Rehabilitation of Sta. Cruz RIS NIA 4.178 O 0.378 0.1574 0.1 0.023 0.045 0.1 80.35 -
83.20%
Sta. Cruz Construction 9301 Const. of MPB (Lying-in Center) V 1.405 C 0.378 0.154 0.300 - - - 83.20
V.Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 396
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Itogon-Dalupirip-San
Stay Construction 23323 CAR 17.321 O 0.307 0.155 0.100 0.020 0.025 0.100 70.70 -
Manuel Bdry. Road
Const. of Buiguias NHS, Bot- 71.25%
Stay Construction 23323 CAR 2.633 C 0.343 0.032 0.300 - - - 67.50
oan Extension Satisfactory
Steel City Fabricators Const. of 1 CL Sch. Bldg. at *90.20%
27035 X 0.494 C 0.366 0.236 0.300 - - - 90.20
Corporation Mimbunga NHS Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 397
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 398
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Sto. Niño Construction 4867 Conc. of Loguilo By-Pass Road X 8.679 O 0.301 0.299 0.100 0.030 0.040 0.067 83.70 -
75.48%
Sto. Niño Construction 4867 Conc. of Midsalip-Sominot Road IX 9.299 C 0.298 0.107 0.300 - - - 70.50
Satisfactory
*88.60%
Sto. Niño Construction 4867 Const. of MPB @ Brgy. 24 X 0.943 C 0.386 0.200 0.300 - - - 88.60
V. Satisfactory
*91.40%
Sto. Niño Construction 4867 Const. of Multi-Purpose Building IX 0.484 C 0.365 0.249 0.300 - - - 91.40
Outstanding
Const./Extension of Dipolog
76.36%
Sto. Niño Construction 4867 Flood Control Dipolog City- IX 4.712 C 0.347 0.200 0.300 - - - 84.70
Satisfactory
Dapitan City Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 399
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Brgy.
*96.00%
Sto. Niño Construction 4867 Kauswagan, Diplahan, IX 0.941 C 0.460 - 0.500 - - - 96.00
Outstanding
Zamboanga Sibugay
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 400
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Western
76.20%
Stoneline Construction 13132 Circumferential Roads (Purok XII 1.901 C 0.343 0.200 0.300 - - - 84.30
Satisfactory
Balas-Purok Sagingan Sect.)
Concrete Reblocking of
67.38%
Stoneline Construction 13132 Cotabato-Alla-Marbel National XII 4.761 C 0.331 0.200 0.000 - - - 53.10
Fair
Road
Stoneline Construction 13132 Const. of MPB XII 0.761 O 0.347 0.240 0.100 0.020 0.027 0.100 83.40 -
Stoneline Construction
Concreting of SKC Lugay-Lugay
(Formerly: Abubakar 13132 XII 3.717 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -
Road
Engineering Exponent)
Stoneline Construction
84.90%
(Formerly: Abubakar 13132 Const. of MPB XII 0.761 C 0.359 0.225 0.300 - - - 88.40
V. Satisfactory
Engineering Exponent)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 401
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*88.60%
Subcon Corporation 25079 Conc. of Mactan St. III 1.387 C 0.386 0.200 0.300 - - - 88.60
V. Satisfactory
Concreting of E-25th St. and
82.90%
Subcon Corporation 25079 26th St. (Elicano St.,-Dead End) III 1.302 C 0.377 0.200 0.300 - - - 87.70
V. Satisfactory
East
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 402
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
94.20%
Sunstone Construction 11122 Const. of FTMR @ Barangiran XII 0.428 C 0.442 - 0.500 - - - 94.20
Outstanding
*94.00%
Sunstone Construction 11122 Const. of MPB @ Brgy. Batiocan XII 0.287 C 0.340 0.300 0.300 - - - 94.00
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 403
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Impvt./Asphalt Overlay of
Sunwest Construction and *88.90%
15906 Shoulders of Calayucay-Sula- V 11.415 C 0.389 0.200 0.300 - - - 88.90
Development Corporation V. Satisfactory
Mosboron Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 404
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 405
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*92.70%
T.A.D. Construction 14098 Const. of Olo Bridge VII 2.744 C 0.327 0.300 0.300 - - - 92.70
Outstanding
Const./Completion of MPB at *79.80%
T.A.D. Construction 14098 VII 0.472 C 0.261 0.237 0.300 - - - 79.80
Caitican Satisfactory
Repair/Maintenance of Lined
*83.20%
T.A.D. Construction 14098 Canal along Lucena Bdry.- IVA 0.289 C 0.232 0.300 0.300 - - - 83.20
V. Satisfactory
Tayabas-Lucban Road
Widening/Conc. of Poblacion-
T.N.J. Buhong
19687 Banaue-Brgy. Bangaan, Awaan- CAR 23.123 O 0.268 0.126 0.070 0.008 0.030 0.033 53.50 -
Construction
Banagan Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 406
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Replacement of Deteriorated
Tabs Construction & Macadam Road to PCCP along 90.18%
10495 XII 5.217 C 0.472 - 0.500 - - - 97.20
Construction Supplies Davao-Cotabato Road (NORCIT- Outstanding
KPES Sect.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 407
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
97.90%
TCAT Construction 20822 Const. of Municipal Hall VIII 0.961 C 0.479 - 0.500 - - - 97.90
Outstanding
Conc. of Brgy. Road @ Brgy. *87.50%
TDR Construction & Supply 8560 IVA 0.470 C 0.275 0.300 0.300 - - - 87.50
Kawit V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 408
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Maintenance by Contract
Package I, CY-2003 R-10, 83.30%
The Steadfast Builders 8176 NCR 5,279 C 0.408 - 0.500 - - - 90.80
Tayuman, Zaragosa, Moriones V. Satisfactory
and Juan Luna
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 409
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Upgrading/Concreting with
*88.00%
The Steadfast Builders 8176 Drainage Impv't. of Brgy. 118, NCR 2.052 C 0.380 0.200 0.300 - - - 88.00
V. Satisfactory
Zone 9
The Tuscan Structures and *81.70%
18257 Conc. of Bugko-Nenita Road VIII 14.313 C 0.317 0.200 0.300 - - - 81.70
Supplies V. Satisfactory
The Tuscan Structures and Const./Impvt./Rehab. of
18257 VIII 18.795 O 0.289 0.245 0.100 0.023 0.047 0.100 80.40 -
Supplies Bantayan-Malobago Road
Repair/Rehabilitation/ 85.41%
Three W Builders, Inc 19722 NIA 34.95 C 0.3358 0.2184 0.300 - - - 85.41
Construction of Butas Dam V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 410
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Thunderheads
22420 Conc. of Road @ San Isidro IV-B 0.951 O 0.372 0.300 0.100 0.023 0.047 0.067 90.90 -
Construction Corporation
Thunderheads 91.62%
22420 Conc. of Road @ San Isidro IV-B 0.951 C 0.347 0.280 0.300 - - - 92.70
Construction Corporation Outstanding
Thunderheads 89.60%
22420 Const. of Paclasan Seawall IV-B 0.875 C 0.396 - 0.500 - - - 89.60
Construction Corporation V. Satisfactory
85.71%
Tibaraw Construction 22710 Const. of Multi-Purpose Building VIII 1.702 C 0.370 0.200 0.300 - - - 87.00
V. Satisfactory
Const./Rehab. of FMR, Bagacay- 40.00%
Tibaraw Construction 22710 VIII 1.789 C 0.000 - 0.500 - - - 50.00
Concord Road Poor
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 411
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion/Conc. of Road @
*83.40%
TM Abad Construction 9302 Panorama Hills, Etn. Brgy. IV-A 0.431 C 0.290 0.244 0.300 - - - 83.40
V. Satisfactory
Cupang
89.20%
TM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S NCR 2.894 C 0.383 0.300 0.300 - - - 98.30
V. Satisfactory
FC-01-
054/SLI- Const. of the Agno River Control
Toa Construction MFCDP-II 708.981 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -
SN- Project, Phase II, Package I
004426
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 412
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
FC-01-
054/SL2- Const. of the Agno River Control
Toa Construction MFCDP-II 925.116 O 0.355 0.200 0.100 0.030 0.065 0.200 95.00 -
SN- Project, Phase II, Package I
000567
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 413
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion of
Toledo Construction 70.58%
6349 Approaches/Slope Protection of NCR 7.623 C 0.371 0.300 0.300 - - - 97.10
Corporation Satisfactory
Kaliraya Bridge
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 414
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Asphalt Overlay-Preventive
Toreja's Construction Maintenance Palico-Balayan- *83.10%
15453 IV-A 20.740 C 0.231 0.300 0.300 - - - 83.10
Supply Corporation Batangas Rd. (Balayong- V. Satisfactory
Manghinao I Sect.)
Rehab./Reconst. of Lobo-
Toreja's Construction Malabrigo-San Juan Road, *87.00%
15453 IV-A 19.294 C 0.270 0.300 0.300 - - - 87.00
Supply Corporation Malabrigo, Soloc-Sawang & V. Satisfactory
Mabilog na Bundok Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 415
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 416
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 417
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Restoration of Legazpi-
81.52%
TR Construction 11697 Punta De Jesus Road, Imalnod V 1.436 C 0.305 0.200 0.300 - - - 80.50
V. Satisfactory
Section
Const. of 4 Storey 82
Tracsom Builders 72.64%
5935 Classrooms Academic Building NCR 14.316 C 0.256 0.201 0.300 - - - 75.70
Incorporated Satisfactory
@ Eulogio Rodriguez E/S
Improvement of Midsayap-
Traffic Supplies and *87.50%
19584 Dulawan-Marbel Road (Sta. Km. XII 0.946 C 0.375 0.000 0.500 0.000 0.000 0.000 87.50
Construction Corp. V. Satisfactory
1776-Sta. Km. 1793+000)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 418
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*74.50%
Tribu Design Construction 12756 Const. of Pantal Bailey Bridge CAR 0.665 C 0.284 0.161 0.300 - - - 74.50
Satisfactory
Tri-dom Trading and *86.00%
10843 Const. of Viga River Control V 3.856 C 0.260 0.300 0.300 - - - 86.00
Construction V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 419
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Trinnadel Const. & Supply 15801 Const. of Multi-Purpose Building III 2.794 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 420
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.10%
Triple P Construction 31616 Const. of Mabulso MPB II 0.469 C 0.341 0.300 0.300 - - - 94.10
Outstanding
*87.80%
Triple P Construction 31616 Const. of Malasin MPB II 0.285 C 0.358 0.220 0.300 - - - 87.80
V. Satisfactory
Const. of Mauan Women's *88.10%
Triple P Construction 31616 II 0.188 C 0.381 0.200 0.300 - - - 88.10
Association MPB V. Satisfactory
Tri-sons Construction and Const. of Gymnasium Bldg. @ 62.20%
16890 XII 0.963 C 0.371 0.300 0.000 - - - 67.10
Supply Brgy. Paitan Fair
Triumph Builders and Steel Const. of one(1) unit Three- 98.30%
2272 NHA 18.007 C 0.383 0.300 0.300 - - - 98.30
Inc. Storey School Building Outstanding
Conc./Repair/Rehab. of Tangub
TSD Builders Construction 88.26%
22129 Bridge I, along Bacolod-South VI 1.569 C 0.291 0.300 0.300 - - - 89.10
and Supply V. Satisfactory
Kabankalan Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 421
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*87.70%
T-Square Builders 14268 Const. of MPB XII 0.477 C 0.277 0.300 0.300 - - - 87.70
V. Satisfactory
Impvt./Conc. of Road at
T-Square Builders 14268 Bansalan-Mt. Apo National Park XI 28.919 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 422
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehabilitation A. *84.60%
Tuchar Construction 13644 NCR 4.869 C 0.346 0.200 0.300 - - - 84.60
Bonifacio Avenue V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 423
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Impvt./Rehab. of La Perla-
Ubas Construction 18875 VIII 14.160 O 0.400 0.300 0.100 0.020 0.023 0.033 87.60 -
Cabulaloan-Yabyaban Road
Const./Impvt./Rehab. of La Perla-
Ubas Construction 18875 VIII 14.160 O 0.132 0.300 0.100 0.030 0.037 0.100 69.90 -
Cabulaloan-Yabyaban Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 424
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const./Impvt./Rehab. of La Perla-
Ubas Construction 18875 VIII 14.160 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -
Cabulaloan-Yabyaban Road
Impvt. of Monkayo-Diwalwal
Ulticon Bluilders, Inc. 17267 XI 92.878 O 0.374 0.277 0.100 0.030 0.037 0.100 91.80 -
Road
Impvt. of Monkayo-Diwalwal
Ulticon Bluilders, Inc. 17267 XI 92.878 O 0.332 0.300 0.100 0.030 0.043 0.100 90.50 -
Road
Maint./Impv't. of Malalag-Malita-
90.52%
Ulticon Bluilders, Inc. 17267 Jose Abad Santos Road, XI 19.268 C 0.328 0.300 0.300 - - - 92.80
Outstanding
Kumassie-Bagsak Sect.
Rehab./Impvt. of Bukidnon-
Davao City Road, Puntian- * 79.20%
Ulticon Bluilders, Inc. 17267 X 13.810 C 0.292 0.200 0.300 - - - 79.20
Sinuda Section (selective Satisfactory
Sections)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 425
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 426
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Completion (Impvt./Conc.
Paving) of Licomo-Quiniput 89.60%
Unitec Builders, Inc. 4803 IX 16.521 C 0.342 0.230 0.300 - - - 87.20
Road, Segment IV (Curuan V. Satisfactory
Poblacion Section)
*81.90%
Unitec Builders, Inc. 4803 Const. of MPB at San Roque VIII 0.946 C 0.319 0.200 0.300 - - - 81.90
V. Satisfactory
Uy Construction &
Conc. of Bais-Kabankalan Road
Development/ARN Builders JV-07-001 VII 95.268 O 0.388 0.238 0.100 0.024 0.055 0.100 90.50 -
@ Intermittent Section
(JV)
Uy Construction &
Conc. of Bais-Kabankalan Road
Development/ARN Builders JV-07-001 VII 95.268 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -
@ Intermittent Section
(JV)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 427
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Widening/Asphalting-Overlay of
Uy Construction and Bais-Kabankalan Road including 94.98%
12336 VII 22.315 C 0.384 0.300 0.300 - - - 98.40
Development ReConst. of (2) Bridges-Cang- Outstanding
abok & Canlumbong
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 428
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
81.08%
V.C.P. Concrete Products 7713 Pavement along Surigao-Davao XIII 9.594 C 0.239 0.300 0.300 - - - 83.90
V. Satisfactory
Coastal Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 429
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Improvement of Quilo-Quilo
V.R. Patron Builders &
13487 Road, Padre Garcia Integrated IV-A 6.550 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -
Developers
ARC
Improvement of Quilo-Quilo
V.R. Patron Builders &
13487 Road, Padre Garcia Integrated IV-A 6.550 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -
Developers
ARC
V.R. Patron Builders & Impvt./Rehab. of Banay-banay *92.80%
13487 IV-A 3.816 C 0.328 0.300 0.300 - - - 92.80
Developers Mojon Jct. Road Outstanding
Impvt./Rehab. of Flood Control
V.R. Patron Builders & Project along Tagaytay-Tuy- *90.70%
13487 IV-A 4.775 C 0.307 0.300 0.300 - - - 90.70
Developers Nasugbu Road, Kaylaway Outstanding
Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 430
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Damaged
V.R. Patron Builders &
13487 National Roads, Manila- IV-A 19.292 O 0.380 0.254 0.100 0.030 0.030 0.100 89.40 -
Developers
Batangas Road, Lipa Section
V.R.D.J. Construction 19837 Const. of Sto. Tomas MPB II 3.818 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 431
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 432
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*92.30%
VAR Builders 20327 Sagay City Resettlement Project NHA 5.910 C 0.323 0.300 0.300 - - - 92.30
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 433
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Reconst./Reblocking/Asphalt
*89.20%
Ven Ray Construction 18310 Overlay of Cebu Toledo Wharf VII 37.225 C 0.387 0.205 0.300 - - - 89.20
V. Satisfactory
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 434
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Reconst. of Siquijor
Ven Ray Construction 18310 VII 31.737 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -
Circ., Siquijor-Larena Rd. Sect.
Repair/Rehab. of Luyang-
83.24%
Ven Ray Construction 18310 Canggumantong Rd. VII 9.645 C 0.214 0.202 0.300 - - - 71.60
V. Satisfactory
(Intermittent Section)
Repair/Rehab./Impvt./Maint. of
*87.10%
Ven Ray Construction 18310 Siquijor Circ. Road, Larena- VII 24.989 C 0.371 0.200 0.300 - - - 87.10
V. Satisfactory
Enrique Villanueva Road Section
Vertical Builders 14029 Const. of 2 Cl @ FVR E/S III 1.351 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -
Vertical Builders 14029 Datu Paglas Resttlement Project NHA 5.925 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -
82.98%
Vertical Builders 14029 Saub River Flood Control XII 1.897 C 0.315 0.225 0.300 - - - 84.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 435
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
CP MN - D3 (Katipunan-Manukan
Vicente T. Lao Construction 7040 ADB 462.152 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -
Road)
CP MN-D (3-1) Nipaan -
Vicente T. Lao Construction 7040 Sindangan Rd., Oroquieta- ADB 184.345 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -
Sindangan Road
Impvt. of Tagum-Asuncion-
*82.00%
Vicente T. Lao Construction 7040 Kapalong-Sto. Tomas-Dapecol- XI 16.396 C 0.220 0.300 0.300 - - - 82.00
V. Satisfactory
Panabo Circ. Road, Left Side
Impvt./Conc. Paving of
Vicente T. Lao Construction 7040 Sindangan-Siayan-Dumingag IX 28.546 O 0.304 0.240 0.000 0.030 0.042 0.100 71.60 -
Road
Impvt./Conc. Paving of
Vicente T. Lao Construction 7040 Sindangan-Siayan-Dumingag IX 28.948 O 0.345 0.240 0.100 0.030 0.040 0.100 85.50 -
Road
Impvt./Concrete Paving of
Vicente T. Lao Construction 7040 Gutalac-Baliguian-Siocon Road, IX 48.156 O 0.270 0.252 0.000 0.030 0.042 0.100 69.40 -
Sta. Maria Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 436
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Impvt./Rehab. of Butuan-
88.90%
Vicente T. Lao Construction 7040 Cagayan de Oro-Iligan Road, X 9.461 C 0.263 0.206 0.300 - - - 76.90
V. Satisfactory
Dampil-Kabulawan Section
Impvt./Rehab. of Dipolog-
*71.30%
Vicente T. Lao Construction 7040 Polanco-Piñan Jct. Oroquieta IX 14.316 C 0.291 0.122 0.300 - - - 71.30
Satisfactory
Road, Barcelona-Polanco Sect.
Impvt./Rehab. of Dipolog-
*80.70%
Vicente T. Lao Construction 7040 Sindangan-Liloy Road, Talinga- IX 28.943 C 0.307 0.200 0.300 - - - 80.70
V. Satisfactory
Bacungan Section
Impvt./Rehab. of Road, Davao- *93.90%
Vicente T. Lao Construction 7040 XI 12.408 C 0.339 0.300 0.300 - - - 93.90
Cotabato Road Outstanding
Impvt./Rehab. of Sindangan- *98.80%
Vicente T. Lao Construction 7040 IX 4.899 C 0.388 0.300 0.300 - - - 98.80
Liloy Road Outstanding
Laguindingan Resttlement
Vicente T. Lao Construction 7040 NHA 38.798 O 0.383 0.297 0.000 0.018 0.047 0.067 81.16 -
Project, Phase II
Reconst. of Dipolog-Polanco-
*88.80%
Vicente T. Lao Construction 7040 Piñan Jct. Oroquieta Nat'l Road, IX 19.092 C 0.387 0.201 0.300 - - - 88.80
V. Satisfactory
Pob. Piñan Section
Rehab./Impvt. of Banisilan-
*89.30%
Vicente T. Lao Construction 7040 Guiling-Alamada-Libungan Road XII 11.433 C 0.359 0.234 0.300 - - - 89.30
V. Satisfactory
(Nicaan-Montay Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 437
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Impvt. of Dualing-New
*91.80%
Vicente T. Lao Construction 7040 Panay-Midsayap Road XII 14.288 C 0.360 0.258 0.300 - - - 91.80
Outstanding
Kimagango Highway Junction
Upgrading/Impvt./Rehab. Along
Dipolog By Pass Road Ph III, *88.30%
Vicente T. Lao Construction 7040 IX 9.635 C 0.283 0.300 0.300 - - - 88.30
Dicayas-Minaog Section (Supply V. Satisfactory
& Installation of Traffic Eng'g)
Upgrading/Impvt./Rehab. of
Dipolog-Oroquieta Road 84.23%
Vicente T. Lao Construction 7040 IX 14.456 C 0.346 0.136 0.300 - - - 78.20
(Supply & Installation of Traffic V. Satisfactory
Eng'g)
Conc. of Brgy. Road @
Vicmar Construction Inc. 28997 IV-A 1.416 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -
Poblacion
Const. of Baywalk Facilities,
Vicmar Construction Inc. 28997 Foreshore Area, Phase 3, Brgy. IV-A 9.594 O 0.360 0.272 0.100 0.030 0.035 0.100 89.70 -
11
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 438
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion IV-A 1.423 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -
95.00%
Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa IV-A 0.476 C 0.450 - 0.500 - - - 95.00
Outstanding
Rehab./Impvt. of Batangas-Lobo
Vicmar Construction Inc. 28997 IV-A 6.803 O 0.354 0.300 0.100 0.030 0.030 0.100 91.40 -
Road
Rehab./Impvt. of Damaged
National Road at Batangas-
Vicmar Construction Inc. 28997 Tabangao-Lobo Road, Pulot IV-A 19.295 O 0.344 0.300 0.100 0.030 0.035 0.100 90.90 -
Aplaya-Talahib Pandayan
Section
Victoria Development and 75.92%
32638 Conc. of Belen-Consuegra Road VIII 9.473 C 0.288 0.200 0.300 - - - 78.80
Construction Supply Satisfactory
Victoria Development and *85.10%
32638 Const. of MPB VIII 0.933 C 0.351 0.200 0.300 - - - 85.10
Construction Supply V. Satisfactory
Victoria Development and Rehab./Impvt. of Villaba Flood 82.56%
32638 VIII 3.785 C 0.307 0.200 0.300 - - - 80.70
Construction Supply Control V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 439
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 440
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*75.40%
Vicvera Builders, Inc. 13903 Rehab. of Road, Brgy. Poblacion NCR 2.087 C 0.257 0.197 0.300 - - - 75.40
Satisfactory
Vigan Fortune Construction 3887 Candon-Salcedo Road I 18.922 O 0.344 0.060 0.100 0.022 0.025 0.067 61.80 -
85.70%
Vigan Fortune Construction 3887 Const. of Darapidap Seawall I 9.454 C 0.333 0.200 0.300 - - - 83.30
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 441
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Replacement of 81.42%
Vigan Fortune Construction 3887 I 7.127 C 0.310 0.200 0.300 - - - 81.00
Gongogong Bridge along MNR V. Satisfactory
Rehab./Replacement of Paing
Vigan Fortune Construction 3887 I 8.362 O 0.272 0.300 0.100 0.030 0.035 0.100 83.70 -
Bridge 2 along MNR
Rehab./Replacement of Paing
Vigan Fortune Construction 3887 I 8.362 O 0.302 0.271 0.100 0.030 0.037 0.100 84.00 -
Bridge 2 along MNR
Stone Masonry of Sabangan
*79.30%
Vigan Fortune Construction 3887 Seawall, Phase III, Sabangan, I 1.207 C 0.293 - 0.500 - - - 79.30
Satisfactory
Santiago
Viguz Construction 77.94%
8178 Const. of Candi-is Bridge VIII 5.518 C 0.348 0.189 0.300 - - - 83.70
Corporation Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 442
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Viguz Construction
Const./Extension of Canturing 81.40%
Corporation (Formerly: 8178 VIII 9.449 C 0.130 0.300 0.300 - - - 73.00
River Control (Bogo Section) V. Satisfactory
Viguz Const.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 443
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 444
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Rehab. of Gapan-
*83.70%
VRF Construction 15301 Peñaranda-Fort Magsaysay III 7.720 C 0.337 0.200 0.300 - - - 83.70
V. Satisfactory
Road
VRP Builders Construction *84.70%
25056 Road Conc. @ Brgy. Maugat IV-A 0.481 C 0.347 0.200 0.300 - - - 84.70
and Supply V. Satisfactory
Impvt./Conc. of Tabuk-Tinglayan
VUC Engineering 7918 CAR 4.777 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -
Road (Bantay Section)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 445
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
84.49%
VVER Construction 14122 Continuation of MPB at Sibulan VII 0.917 C 0.289 0.300 0.300 - - - 88.90
V. Satisfactory
Repair/Rehab. of Upper *84.40%
VVER Construction 14122 VII 1.393 C 0.337 0.207 0.300 - - - 84.40
Cabangcalan V.Satisfactory
Impvt. of Farm to Market Road,
*92.40%
W B X Construction 28370 Brgy. Bagbaguin Sto. Tomas III 2.569 C 0.324 0.300 0.300 - - - 92.40
Outstanding
Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 446
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Const. of 4 Storey 12 Cl
*77.60%
W. Palma Construction 11988 Secondary Sch. Bldg. @ Roman VII 6.895 C 0.376 0.100 0.300 - - - 77.60
Satisfactory
Duterte Memorial NHS
81.35%
W.C. Doyola Construction 26044 Paguite CIS PIO 833.488 C 0.339 0.175 0.300 - - - 81.35
V.Satisfactory
Upgrading/Impvt. of Manila
W.D. Navarro Construction
14327 North Road (Jct. Bangag- II 20.042 O 0.320 0.240 0.100 0.020 0.033 0.067 78.00 -
Co.
Mabanguc-Paruddun Sect.)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 447
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Concreting of Oroqueta-Calamba
Walter Ng Lao Construction 23739 X 1.603 O 0.351 0.300 0.000 - - - 65.10 -
Mt. Rd.,
Panansalan-Cartagena
Walter Ng Lao Construction 23739 NIA 5.787 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -
Communal Irrigation System
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 448
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*83.70%
WCS Construction, Inc. 6516 Const. of Buang River Control V 8.073 C 0.337 0.200 0.300 - - - 83.70
V. Satisfactory
80.49%
WCS Construction, Inc. 6516 Const. of Lubad Bridge V 23.885 C 0.386 0.172 0.300 - - - 85.80
V. Satisfactory
Const. of MPB Covered Court 86.05%
WCS Construction, Inc. 6516 V 4.279 C 0.357 0.200 0.300 - - - 85.70
(Phase I) V. Satisfactory
WCS Construction, Inc. 6516 Yawa River (Banag Section) V 47.661 O 0.328 0.160 0.100 0.008 0.038 0.200 83.40 -
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 449
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 450
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 451
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Improvement/Concrete Paving
along Rizal Shrine-Rizal Town
Westmin Enterprises and 91.92%
20989 Coastal Road, Guimputlan- IX 2.758 C 0.388 0.200 0.300 - - - 88.80
Construction Services Outstanding
Banbanan-Carang Road Section
(Guimputlan-Banbanan Sect.)
*86.90%
Westwalk Corporation 30650 Const. of MPB NCR 2.101 C 0.369 0.200 0.300 - - - 86.90
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 452
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.30%
Wizard Enterprises 27504 Const. of Water Works System IV-A 0.964 C 0.343 0.300 0.300 - - - 94.30
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 453
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 454
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 455
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Toledo-Pinamungajan-
83.76%
Yakal Construction 9685 Aloguinsan-Mantalongon Road VII 9.470 C 0.273 0.300 0.300 - - - 87.30
V. Satisfactory
(Bojo Section)
83.00%
Yakal Construction 9685 Const. of Anas Flood Control VIII 3.798 C 0.350 0.300 0.300 - - - 95.00
V. Satisfactory
80.76%
Yakal Construction 9685 Const. of Balaquid Bridge VIII 3.649 C 0.360 0.300 0.300 - - - 96.00
V. Satisfactory
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 456
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 457
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Conc. of Dayhagan-Salvacion-
Yoyen Enterprises 15541 VIII 12.537 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -
Coob-Libertad Road
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 458
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Repair/Restoration of *93.10%
Yoyen Enterprises 15541 VIII 0.248 C 0.331 0.300 0.300 - - - 93.10
Buenavista Slope Protection Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 459
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*68.30%
YSL Builders 19516 Const. of MPB (Mini Gym) IX 1.079 C 0.383 0.000 0.300 - - - 68.30
Fair
Rehab./Const. of Damaged
Yu Construction 10470 Paved National Road along TER VII 15.052 O 0.353 0.240 0.100 0.030 0.048 0.100 87.10 -
(Loay-Jagna)
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 460
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
*94.50%
Z.F. Construction 17676 Const. of 2-CL Building III 0.809 C 0.345 0.300 0.300 - - - 94.50
Outstanding
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 461
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
Rehab./Asphalting of Road,
*95.80%
ZM Construction 9052 Slope Protection along Iba North III 7.165 C 0.358 0.300 0.300 - - - 95.80
Outstanding
Road
Conc. of Tubod-Lakewood-
*73.10%
ZMS Construction 10471 Pob.Lakewood Nat'l Secondary IX 14.235 C 0.316 0.115 0.300 - - - 73.10
Satisfactory
Road, Sibuwan-Tubod Section
Conc. of Tubod-Lakewood-
*76.00%
ZMS Construction 10471 Pob.Lakewood Nat'l Secondary IX 14.248 C 0.348 0.112 0.300 - - - 76.00
Satisfactory
Road, Tubod-Sibuwan Section
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 462
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
18 June 2009
* 1st/Final
* For DPWH, only the region and PMO office are listed
8th CPES release Page 463