E3 Parking levels

Sr. no. Location punch points


1 P1 lobby LV shaft Gypsum+paint touch up
2 P1 lobby minor temp cable need to remove
3 P1 lobby ceiling need to finish properly
4 P1 east side door frame need to finish properly
5 P1 north side column bottom need to touchup
6 tube light need to fix properly.
7 P2 lobby LV shaft need to finish properly
8 P2 West-North side Paint behind fire pipes
9 P2 West side grey paint required
10 P3 lobby Handle of door need to fix
11 P3 east side earthing patti need to provide properly
12 P3 east side Tie rod portion need to finish properly.
13 P3 west side tie rod need to remove
14 P3 Paint of shaft balance at some locations
15 Podium common bed west side 1 coat balance
16 podium kota minor gap filling.
17 scooter parking Point shown at site .WIP