You are on page 1of 3

QUOTE

To : Edwin Loquina Number : Q21412


Matina Balusong Extension Date : November 29, 2021
Davao City No. of Pages :3
Price Validity : 30 Days
Payment Terms : Pre-payment & for bank deposit
Delivery Time : 20 working days upon receipt of the
order

Item Description Amount


1 ETAP New License - 1 Single Commercial Stand Alone, 500 Bus Php 798,870.00
o Base Package Core Modules
▪ Base Module Multi-Dimensional Digital-Twin Platform, Revisions, Libraries, Wizards
▪ Load Flow, AC Power Flow, 3-Phase & 1-Phase Systems, Voltage Drop, Result Analyzer
▪ Panel Schedule Schedules, Calculations, 3-Phase, 1-Phase, NEC, IEC
o Cable IEEE, ICEA, Cable Ampacity & Sizing - IEEE, ICEA, NEC (Free)
NEC
o Renewables Wind Turbine Generator, PV Array - PV Pro, Controls, Libraries,
Profiles (Free)
o HVDC Link Control Schemes, Dynamic Modes, Rectification, Inversion (Free)
o Short Circuit, AC ANSI & IEC, Balanced 3-Phase & 1-Phase, Duty Evaluation, Analyzer
o Arc Flash, AC IEEE 1584 2018 & NFPA 70E 2021 - Analyzer, Work Permit, Safety
Labels
o Star™ Protection, Selectivity, Sequence of Operation, Protective Devices
o Star Auto-Eval Auto-Evaluation of Protection, Selectivity, Zone, Arc Flash
o 1-Year UUC One Year of Free Upgrade and User-Support (UUC)

Amount : Php 798,870.00


Add VAT (12%) : 95,864.40
Total Amount : Php 894,734.40

ELTECHS E&C CORPORATION www.eltechs.com.ph


Alfonso, Concepcion, Tarlac, 2316 • Tel/Fax: (045) 609-0011 • info@eltechs.com.ph
Terms and Conditions
I. ETAP Software & License
The software program is available in ETAP 21.0.1 version which runs in 64-bit Microsoft Windows 7 / 8 / 8.1 / 10, Windows
Server 2012, 2012R2, 2016 & 2019 operating systems. Please refer to the enclosed “ETAP 21 System Requirements”.
The above price includes first-year off-site software support via ETAP Help Center web portal, email, and phone. In addition,
one full year of program upgrades is included in the Upgrade and User-Support Contract (UUC). You will directly receive all
upgrades (through download from the ETAP Help Desk web portal) that are released for your ETAP system during your UUC
period - at no additional charge. Follow-up user support and program upgrades for the Single-Commercial license will be
provided at 12% of the prevailing integrated price annually.
The licensee is Edwin Loquina, for Davao City office. Note the software is provided with a USB security dongle key. If the
dongle key is defective or damaged and the UUC is valid, it can be replaced by returning it for replacement. However, if it is
lost or stolen, it cannot be replaced.
Note that the terms and condition of the ETAP License Agreement (LGA) accepted upon installation will apply to this order.

II. Ordering & Payment


To order the license for ETAP, we need the following:
(a) Purchase order
(b) Payment
(c) Contact information (name and email) of the license custodian. The license custodian will be the one to receive email
notifications when new version of ETAP becomes available.
The payment is to be deposited or wired to our bank account. The bank account information will be provided at the time of the
order. Note any bank deposit or wire fee is a separate charge and the responsibility of the payor. If tax is withheld, the BIR
2307 shall be provided and send by courier (e.g. LBC, 2GO, etc.) to Eltechs E&C Corp. office.

III. Delivery
The license dongle key and pertinent documents will be delivered to Edwin Loquina, Davao City residence through LBC in 20
working days (under normal condition i.e., no pandemic or calamities) upon receipt of the order. While the ETAP Software
installer is distributed as download and the designated license custodian must sign-up to the ETAP Help Center Portal at
https://helpcenter.etap.com/ to download.

IV. Non-Exclusive Basic Online Training


After purchased of the license, up to two engineers from the company can join, for free, one of our ETAP 100PH Half-Day
basic online trainings being held on a pre-set schedule. Please visit https://etap.com/events/events-schedule or
www.eltechs.com.ph for details. Seat reservation is limited and on a first-come-first serve basis.

V. Others
On-site software support (e.g., software installation), training, and other related services are not included in the price.
This quote is a matter to be kept confidential between ETAP, Eltechs E&C Corporation and Edwin Loquina.

Prepared by:

Lee Alvin Manio


ELTECHS E&C CORPORATION

Enclosure: ETAP 21 System Requirements

ELTECHS E&C CORPORATION www.eltechs.com.ph


Alfonso, Concepcion, Tarlac, 2316 • Tel/Fax: (045) 609-0011 • info@eltechs.com.ph
ETAP 21 System Requirements
Operating System (64-bit)
 Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
 Microsoft Windows 8 & 8.1 (Standard, Professional)
 Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
 Microsoft® Server 2016 (Standard), Server 2019 (Standard)
 Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
 Microsoft .NET Framework v3.5 (SP1)
 Microsoft .NET Framework v4.7.1
 Microsoft Redistributables
o Microsoft Visual C++ 2005
o Microsoft Visual C++ 2008
o Microsoft Visual C++ 2013
o Microsoft Visual C++ 2015
 Microsoft SQL Server Compact 4.0 SP1 x64
 Microsoft Windows Update (KB2670838)
 Microsoft SQL Server 2012 Express LocalDB (x64) SP4
 Microsoft SQL Server 2012 Native Client (x64)
 SAP Crystal Reports runtime engine for .NET Framework CR13 SP26
 SQLite ODBC Driver 0.9995
 Intel® Visual Fortran Redistributable
o Intel® 64 Setup 2016.4.246
o Windows® on Intel® 64 11.1.072

Other Third-Party Software


 DB Browser for SQLite
 Python 3.8.4
 Microsoft SQL Management Studio 2012 (x64)
 MongoDB 4.2.3 2008R2Plus SSL (64 bit)

PC Configuration Requirements
 64-bit hardware
 USB port for security key
 Ethernet port w/ network access (for network licensing & software download)
 20 to 200 GB hard disk space (based on project size, number of buses)
 Recommended Display
o 21" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)

You might also like