FRM-002-D

TOOL BOX MEETING / SAFETY TALK / RISK ASSESSMENT BRIEFING / ______________


Main / Sub Contractor TRISTAR ENGINEERING PTE LTD
Project
Date & Time:
Conducted By:
(Name & Signature)
No. Employee Name Work Permit Designation Signature
No. No.
1. CHIN BOON KHENG 3 60445860 S/S
2. HIEW KIN LONG SXXXX891C S/S
3. LO AH KEE 3 59769674 G/W
4. CHIDAMBARAM VIJAY 0 37450596 G/W
5. RENGASAMY ILAYARAJA 0 34383111 G/W
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

ITEMS DISCUSSED
a)
b)
c)
d)
e)
f)
g)

*Note: Do not use items discussed in the TBM as hazards spotted

1
FRM-002-D

Last Minute Risk Assessment


RA (Activity & Ref):

Location of work:

Hazardous activity:
(To be filled by
supervisor)

Risks identified:
(To be filled by worker.
May be assisted by
supervisor)

Preventive measures /
actions taken:
(To be filled by worker.
May be assisted by
supervisor)

Preventive measures
taken:
(To be filled by
supervisor)

Name:
Designation:

Sign:
Date: