The document lists 10 pending office works, including:
1) Preparing an invoice for the Dargai Project letter
2) Addressing an issue raised by Sheikh Mohammadi regarding installing 3x79 MVA transformers
3) Removing transmission constraints in South Pakistan, which involves an email reply and presentation addressing constraints from transformers, transmission lines, and planning department comments
4) Finalizing key performance indicators with additional proposed points
5) Preparing a response letter to address various points raised in a previous letter from MEPCO
The document lists 10 pending office works, including:
1) Preparing an invoice for the Dargai Project letter
2) Addressing an issue raised by Sheikh Mohammadi regarding installing 3x79 MVA transformers
3) Removing transmission constraints in South Pakistan, which involves an email reply and presentation addressing constraints from transformers, transmission lines, and planning department comments
4) Finalizing key performance indicators with additional proposed points
5) Preparing a response letter to address various points raised in a previous letter from MEPCO
The document lists 10 pending office works, including:
1) Preparing an invoice for the Dargai Project letter
2) Addressing an issue raised by Sheikh Mohammadi regarding installing 3x79 MVA transformers
3) Removing transmission constraints in South Pakistan, which involves an email reply and presentation addressing constraints from transformers, transmission lines, and planning department comments
4) Finalizing key performance indicators with additional proposed points
5) Preparing a response letter to address various points raised in a previous letter from MEPCO
1. Dargai Project ka letter (iski invoice banani hai)
2. Sheikh Mohammadi Transformer issue jisme wo keh rhy hain k 3x79 MVA ky transformer laganay hain 3. Transmission Constraints removal in South 3.1. One part is Email part. Email Reply came on 12-07-2023 (Wed). 3.2. Other part is Presentation Part Presentation is submitted. It had constraints of Transformer, Transmission Lines as well and the Planning Department gave their comments in the file. 4. Key Performance Indicators work pending, I gave some points that can be added in the list to Hamza bhai. 5. MEPCO Wala letter jismay hamne unsy discussion krni hai. Unho ny jo letter diya tha, usmay unho ny bohat points raise kiye thy jo ak letter me answer nhi kiye ja sakty. 6. CASA Waala Kaam pending hai. Jismy CISE contractor hai hamara aur wo studies perform kr rha hai. Iski dynamic performance study (reverse power flow me) aai hai hamary pass. 7. Inquiry Report of 7.1. Nokhar to Lahore North 7.2. K2,K3 Lines 8. Low Voltage Issue at Ghazi Road and Quetta Industrial. 9. CASA Converter station jo Noshera me hai, uska letter aya hoa hai. Converter statation Noshera. 10. Grid Connection for Thar Mining Project (Letter from Engro)