SITE TEST FORM TEST FORM:

Subject: 25kV Gas Insulated Switchgear Overhaul Revision

Location: TEST DATE


Panel No.:

1. RESISTANCE TEST Check


a) Measure the resistance between connections. □ Pass
Panel no.:
Disconnector & Earthing Mating Contact Acceptance Criteria : < 35 µohm
Resistance
Disconnector Contact

Earthing Contact

b) Panel no.: □ Pass


Disconnector & Earthing Mating Contact Acceptance Criteria : < 35 µohm
Resistance
Disconnector Contact

Earthing Contact

c) Panel no.:
Disconnector & Earthing Mating Contact Acceptance Criteria : < 35 µohm □ Pass
Resistance
Disconnector Contact

Earthing Contact

2. SF6 GAS PRESSURE CHECK Check


□ Pass

SF6 GAS PRESSURE


Gas Pressure Prior Wrks Gas Pressure After Works (before Gas Settling)

3. SF6 GAS QUALITY TEST Check

SIGN-OFF
Tested By: Witness By:
(Sign and Print) (Sign and Print)

Date: Date:

Issue Date: 9th June 2023 Page 1


SITE TEST FORM TEST FORM:
Subject: 25kV Gas Insulated Switchgear Overhaul Revision

Check SF6 gas quality after gas stabilization for over 12 hours. □ Pass
Perform Air Content, Dew Point and Gas Leakage tests and record test result below.

GAS LEAKAGE TEST


Using SF6 leakage detector Check prior Works (For Acceptance Criteria : No
to go through all busbar reference only) gas leak detected
housing joints.
Gas Leakage

AIR CONTENT TEST


Test at Gas Filling Valve SF6 Content prior Works Acceptance Criteria: > 95%
(For reference only)
SF6 Content

DEW POINT TEST


Test at Gas Filling Valve Dew Point prior Works Acceptance Criteria: < -15 ºC
(For reference only)
Dew Point

4. FINAL SF6 GAS PRESSURE CHECK Check


a) With satisfied test results above, check the SF6 gas pressure at gas pressure gauge. □ Pass
SF6 GAS PRESSURE
Gas Pressure (after gas settling)

SIGN-OFF
Tested By: Witness By:
(Sign and Print) (Sign and Print)

Date: Date: