Professional Documents
Culture Documents
T&C Form (SF6 Gas Work)
T&C Form (SF6 Gas Work)
Earthing Contact
Earthing Contact
c) Panel no.:
Disconnector & Earthing Mating Contact Acceptance Criteria : < 35 µohm □ Pass
Resistance
Disconnector Contact
Earthing Contact
SIGN-OFF
Tested By: Witness By:
(Sign and Print) (Sign and Print)
Date: Date:
Check SF6 gas quality after gas stabilization for over 12 hours. □ Pass
Perform Air Content, Dew Point and Gas Leakage tests and record test result below.
SIGN-OFF
Tested By: Witness By:
(Sign and Print) (Sign and Print)
Date: Date: