You are on page 1of 74

Project GPC LPG Plant

Document No. GPC-LPG-MC-200 Company Sigma


Rev. 1.0
Inlet Separator Leaktest Sub. No. GPC-LPG-MC-201
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-101 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet Separator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Inlet Gas Compressor Sub. No. GPC-LPG-MC-202
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : C-100 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet Gas Compressor

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Inlet Gas Compressor Sub. No. GPC-LPG-MC-203
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : C-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet Gas Compressor

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Inlet compressor discharge Sub. No. GPC-LPG-MC-204
Document Title
cooler Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : AC-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet compressor discharge cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Inlet Gas filter coalescer Sub. No. GPC-LPG-MC-205
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-401 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet Gas filter coalescer

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Fuel gas scrubber Leaktest Sub. No. GPC-LPG-MC-206
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-409 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Fuel gas scrubber

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Treated gas scrubber Sub. No. GPC-LPG-MC-207
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-402 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Treated gas scrubber

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Flash tank Leaktest Sub. No. GPC-LPG-MC-208
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-403 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Flash tank

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Anti-Foam Injection pump Sub. No. GPC-LPG-MC-209
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-607 A/B LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Anti-Foam Injection pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Circulation Pump Sub. No. GPC-LPG-MC-210
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-601 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Circulation Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Circulation Pump Sub. No. GPC-LPG-MC-211
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-602 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Circulation Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Particulate filter Sub. No. GPC-LPG-MC-212
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-407 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Particulate filter

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine charcoal filter Leaktest Sub. No. GPC-LPG-MC-213
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-406 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine charcoal filter

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Lean / Rich Amine exchanger Sub. No. GPC-LPG-MC-214
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-201 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Lean / Rich Amine exchanger

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Booster Pump Sub. No. GPC-LPG-MC-215
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-603 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Booster Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Booster Pump Sub. No. GPC-LPG-MC-216
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-604 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Booster Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Booster Pump Seal Sub. No. GPC-LPG-MC-217
Document Title Flush cooler Leaktest Date
certificate

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-303 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Booster Pump Seal Flush cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Booster Pump Seal Sub. No. GPC-LPG-MC-218
Document Title Flush cooler Leaktest Date
certificate

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-304 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Booster Pump Seal Flush cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Surge Tank Leaktest Sub. No. GPC-LPG-MC-219
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-405 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Surge Tank

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Still Reflux pump Leaktest Sub. No. GPC-LPG-MC-220
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-605 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Still Reflux pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Still Reflux pump Leaktest Sub. No. GPC-LPG-MC-221
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-606 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Still Reflux pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water Expansion tank Sub. No. GPC-LPG-MC-222
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-409 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water Expansion tank

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water Circulation Pump Sub. No. GPC-LPG-MC-223
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-608 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water Circulation Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water pump seal flush Sub. No. GPC-LPG-MC-224
Document Title
cooler Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-305 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water pump seal flush cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water Circulation Pump Sub. No. GPC-LPG-MC-225
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-609 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water Circulation Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water pump seal flush Sub. No. GPC-LPG-MC-226
Document Title
cooler Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-306 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water pump seal flush cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Contactor Leaktest Sub. No. GPC-LPG-MC-227
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : T-501 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Contactor

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine cooler Leaktest Sub. No. GPC-LPG-MC-228
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-301 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine Still Leaktest Sub. No. GPC-LPG-MC-229
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : T-502 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine Still

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Reflux accumulator Leaktest Sub. No. GPC-LPG-MC-230
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-404 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Reflux accumulator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Amine reboiler Leaktest Sub. No. GPC-LPG-MC-231
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-202 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Amine reboiler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Reflux condenser Leaktest Sub. No. GPC-LPG-MC-232
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : A-302 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Reflux condenser

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot water heater Leaktest Sub. No. GPC-LPG-MC-233
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : H-701 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot water heater

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Inlet secrubber Leaktest Sub. No. GPC-LPG-MC-234
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Inlet secrubber

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
DEH inlet gas filter separator Sub. No. GPC-LPG-MC-235
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: DEH inlet gas filter separator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
dehydrator Leaktest Sub. No. GPC-LPG-MC-236
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : D-1A LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: dehydrator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
dehydrator Leaktest Sub. No. GPC-LPG-MC-237
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : D-1B LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: dehydrator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
regeneration gas scrubber Sub. No. GPC-LPG-MC-238
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-300 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: regeneration gas scrubber

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Sub. No. GPC-LPG-MC-239
Document Title dust filter Leaktest certificate
Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-2 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: dust filter

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
regen gas lube oil filter Sub. No. GPC-LPG-MC-240
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : F-400 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: regen gas lube oil filter

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
rich gas chiller Leaktest Sub. No. GPC-LPG-MC-241
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-3 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: rich gas chiller

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
warm preheater Leaktest Sub. No. GPC-LPG-MC-242
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-2 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: warm preheater

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
warm gas/gas exchanger Sub. No. GPC-LPG-MC-243
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: warm gas/gas exchanger

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
cold preheater Leaktest Sub. No. GPC-LPG-MC-244
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-5 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: cold preheater

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
cold gas/gas exchanger Sub. No. GPC-LPG-MC-245
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-4 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: cold gas/gas exchanger

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
cold separator Leaktest Sub. No. GPC-LPG-MC-246
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-2 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: cold separator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
bottom reboiler Leaktest Sub. No. GPC-LPG-MC-247
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-6 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: bottom reboiler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
deethanizer Leaktest Sub. No. GPC-LPG-MC-248
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : T-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: deethanizer

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
regeneration gas cooler Sub. No. GPC-LPG-MC-249
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : AC-2 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: regeneration gas cooler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
regeneration gas heater Sub. No. GPC-LPG-MC-250
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : H-1 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: regeneration gas heater

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigerant condenser Sub. No. GPC-LPG-MC-251
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : AC-3 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigerant condenser

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigerant accumulator Sub. No. GPC-LPG-MC-252
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-6 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigerant accumulator

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigerant discharge oil trap Sub. No. GPC-LPG-MC-253
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-5 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigerant discharge oil trap

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigeration compressor Sub. No. GPC-LPG-MC-254
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : C-500 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigeration compressor

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigerant flash tank Leaktest Sub. No. GPC-LPG-MC-255
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-4 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigerant flash tank

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
refrigerant suction scrubber Sub. No. GPC-LPG-MC-256
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-X LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: refrigerant suction scrubber

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot Oil Surge Drum Leaktest Sub. No. GPC-LPG-MC-257
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-100 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot Oil Surge Drum

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot Oil Pump Leaktest Sub. No. GPC-LPG-MC-258
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : PU-101 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot Oil Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot Oil Pump Leaktest Sub. No. GPC-LPG-MC-259
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : PU-102 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot Oil Pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Hot Oil Heater Leaktest Sub. No. GPC-LPG-MC-260
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : H-100 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Hot Oil Heater

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
depropanizer Leaktest Sub. No. GPC-LPG-MC-261
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : T-2 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: depropanizer

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
depropanizer condenser Sub. No. GPC-LPG-MC-262
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-10 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: depropanizer condenser

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
depropanizer reboiler Sub. No. GPC-LPG-MC-263
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-11 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: depropanizer reboiler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
debutanizer Leaktest Sub. No. GPC-LPG-MC-264
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : T-3 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: debutanizer

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
debutanizer condenser Sub. No. GPC-LPG-MC-265
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-12 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: debutanizer condenser

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
debutanizer reboiler Leaktest Sub. No. GPC-LPG-MC-266
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : E-13 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: debutanizer reboiler

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Flare knock out drum Sub. No. GPC-LPG-MC-267
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-102 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Flare knock out drum

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Fuel gas drum Leaktest Sub. No. GPC-LPG-MC-268
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : V-103 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Fuel gas drum

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
firefighting water tanks Sub. No. GPC-LPG-MC-269
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : TK-101 A/B LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: firefighting water tanks

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
firefighting water pumps Sub. No. GPC-LPG-MC-270
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : P-101 A/B/C LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: firefighting water pumps

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
diesel tank Leaktest Sub. No. GPC-LPG-MC-272
Document Title
certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : TK-102 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: diesel tank

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Methanol Tank and pump Sub. No. GPC-LPG-MC-274
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : TK-103 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Methanol Tank and pump

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
Sub. No. GPC-LPG-MC-282
Document Title Burn pit Leaktest certificate
Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : X-109 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: Burn pit

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS:
Project GPC LPG Plant
Document No. GPC-LPG-MC-200 Company Sigma
Rev. 1.0
instrument air compressors Sub. No. GPC-LPG-MC-283
Document Title
Leaktest certificate Date

MECHANICAL COMPLETION TEST


ACCEPTANCE CERTIFICATE TYPE
VESSELS EQUIPMENT
LEAKTEST

SUB-SYSTEM : X-110 LOCATION: Ras Gharib SITE: GPC LPG

DESCRIPTION: instrument air compressors

Design Test Test start Test finish Ambient


Test medium
pressure pressure time time temp.
: :

MECHANICAL COMPLETION CHECK LIST

✓ Branch connection check


✓ Flange rating check
✓ Flange bolts correct
✓ Flange bolts tightened
✓ Vents and drains in place
✓ Correct Pipe supports fitted, seated & guided correctly
✓ Manual isolation valves oper. satisfactorily & fitted with Open/close indicator
✓ All valves directionally correct
✓ Internals of check valves installed
✓ Access to valves adequate
✓ Strainer removal access adequate
✓ Correct slope of pipeline, where applicable
✓ Insulation clearance adequate, where applicable
✓ Insulating Gasket sets fitted according to SPECIFICATION
✓ Valve interlocks fitted correctly where required
✓ Correct nozzles fitted where applicable
✓ Parallel and lateral alignment of pipe flanges correct
✓ NDT records complete

IT IS HEREBY CERTIFIED THAT THE ABOVE SUB-SYSTEM HAS BEEN INSPECTED,


TESTED AND COMPLETED IN ACCORDANCE WITH THE REFERENCED CHECK LISTS
AND/OR ATTACHED RECORDS.
NAME SIGNATURE ORGANISATION
ISSUED
BY
VERIFIED SIGMA
BY OPERATION

COMMENTS: