1. What is the lot dimension of the project?

A 24m x 99m B 53m x 105m

C 24m x 91m D 55m x 105m

2. What is the AMBF of the project base on the given data?

A 2,220 sqm B 2,064 sqm

C 1,820 sqm D 1,960 sqm

3. What is the USA of the project base on the given data?

A 720 sqm B 960 sqm

C 807 sqm D 687 sqm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 1/13
12/16/23, 12:32 AM DEV CONS

4. What is the Total Gross Floor Area of the project base on its
given data

A . 2,560 sqm B 2,484 sqm

C 1,796 sqm D 2,064 sqm

5. What is the Percentage of Site Occupancy of the project in


relation with its lot?

A 40% B 50%

C 75% D 37%

6. Base on Rule VII & VIII of National Building Code, what is


the designated FLAR for the project?

A 3.0 B 9.0

C 1.2 D 2.5

7. What is the declared zoning classification of the site?

A GI B Division C

C SPE D G-1

8. If the building of this compound is defined as rectangle, what


will be the building dimension of the project?

A 20m x 91m B 48m x 99m

C 55m x 105m D 24m x 91m

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 2/13
12/16/23, 12:32 AM DEV CONS

9. What is the Maximum Allowable Construction Area of the


project base on the given data?

A 3,501 sqm B 2,064 sqm

C 4,758 sqm D 4,760 sqm

10. What is the range of the number of tiles to be used in the Engineering Department
office using 600mm x 1200mm ceiling tiles?

A 233 pcs B 235 pcs

C 250 pcs D 58 pcs

11. What is the area/room aligned in ground floor with the Engineering department office?

A Storage 1 B Lobby

C Storage 2 D Business Center

12. Given that the slab at second floor is 0.12 meters thick, how
many kilograms of steel reinforcing bars needed if it requires
15kgs of reinforcing bars per cubic meter of concrete?
Exclude the area of stairwell of 3m x 6m.

A 723.6 kgs B 6,030 kgs

C 6,300 kgs D 756 kgs

13. Assuming that docking/delivery platform of the project is


450mm above NGL, and the tread width of the stair is
300mm, what will be the Total Run of the stair?

A 450mm B 300mm

C 600mm D 150mm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 3/13
12/16/23, 12:32 AM DEV CONS

14. Base on Rule VII & VIII of National Building Code, what is
the Allowable Maximum PSO of the project?

A 70% B 50%

C 60% D 80%

15. Assuming that the workshop will be covered with T&G


flooring. Compute for the total number of boardfoot to be
used if the workshop (excluding the 60sq.m T&B/locker
room) will use 1”x4”x4’ T&G flooring with an effective width
of 3.5”.

A 8,700 bft B 1,448 sqm

C 2,040 sqm D 9,200 bft

16. Based on the NBCP Section 811 of Rule VIII, what is the
minimum requirement for air changes for an office?

A none of the choices B 0.85 cu.m.

C 1.20 cu.m. D 0.29 cu.m.

17. Base on project given, what is not included in the GFA?

A Business Center side deck B Locker room

C Engineering Department office D Storage 2

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 4/13
12/16/23, 12:32 AM DEV CONS

18. What is the percentage of site occupancy of the 2-storey


commercial building within the C1 lot?

A 12% B 20%

C 15% D 11%

19. What is the Gross Floor Area for the Light Industrial project

A 2,240 sqm B 2,800 sqm

C 3,200 sqm D 2,250 sqm

20. What is the Total Gross Floor Area of the 2-storey


residential?

A 620 sqm B 860 sqm

C 320 sqm D 560 sqm

21. What is the the Total Gross Floor Area of the commercial
building base on the given area?

A 11,250 sqm B 336 sqm

C 12,000 sqm D 672 sqm

22. Base on Rule VII & VIII of National Building Code, what is
the designated FLAR for the residential site of the project?

A 2.00 B 3.00

C 1.50 D 1.30

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 5/13
12/16/23, 12:32 AM DEV CONS

23. Base on the project given data, assuming the given building
dimension of the commercial building, what is the area of
the roof if it has 1.20m eaves on all sides?

A 336 sqm B 437.76 sqm

C 89.6 sqm D 450 sqm

24. Base on the project given data, what will be GFA of the
second floor of the owners house?

A 4125 sqm B 240 sqm

C 320 sqm D 560 sqm

25. Base on project given data, roughly compute for the total length of handrail to be used
in the perimeter of the gazebo if it has a two openings of 1.2m eac

A 22.8 lm B 24 lm

C 12 lm D 21.6 lm

26. What is the AMBF of the project base on its given data?

A 414.5 sqm B 456.2 sqm

C 506.7 sqm D 439.4 sqm

27. What is the zoning classification of the project?

A C-1 B R-5

C R-3 D R-3 Max

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 6/13
12/16/23, 12:32 AM DEV CONS

28. What is the USA of the project base on its given data?

A 187.5 sqm B 67 sqm

C 105.2 sqm D 208.5 sqm

29. What is the ISA of the project base on its given data?

A 21% B 10%

C 3% D 5%

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 7/13
12/16/23, 12:32 AM DEV CONS

30. Base on Rule VII & VIII of National Building Code, what will
be the Maximum Allowable ISA of the project?

A 64.8 sqm B 129.6 sqm

C 120 sqm D 47.9 sqm

31. Base on Rule VII & VIII of National Building Code, what will
be the Maximum Allowable PSO of the project?

A 55% B 70%

C 80% D 60%

32. What will be the area of the balcony for each studio type
unit?

A 57.33 sqm B 3.84 sqm

C 1.20 sqm D 7.20 sqm

33. Which is considered as non-GFA for the project?

A parking space B 3.84 sqm balcony

C hallway D 2BR unit

34. What is included in the GFA of the the project?

A roof deck party place B driveway

C 7.20 sqm balcony D fire exit/service stair

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 8/13
12/16/23, 12:32 AM DEV CONS

35. How much gallon of paint will be used for the 2 coatings of the entire hallway of the
residential floors if 1gal of paint covers 25 sqm?

A 18 gal B 20 gal

C 15 gal D 3 gal

36. Base on project given data, How many car parking slot can
be occupied in the given parking area?

A 21 slot B 18 slot

C 14 slot D 12 slot

37. Base on project given data, what is the acquired USA of the
project?

A 15.17 sqm B 16 sqm

C 4 sqm D 8 sqm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 9/13
12/16/23, 12:32 AM DEV CONS

38. What is the AMBF of the project base on the given data?

A 113.66 sqm B 148 sqm

C 140 sqm D 191.80 sqm

39. Having 30% of the 3rd floor area of this project is allotted for
the office of the developers firm, with a ceiling height of
2.40m, based on the NBCP Section 807 of Rule VIII, what is
the maximum number of users can be within this office
space?

A 20 persons B 22 person

C 15 persons D 13 persons

40. In accordance to RA 9514, Floor level changes shall not


vary by more than?

A 1.3cm B 11mm

C 12mm D 1.25cm

41. Base on Rule VII & VIII of National Building Code, what is
the Minimum USA for the project?

A 16 sqm B 15.17 sqm

C 8 sqm D 4 sqm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 10/13
12/16/23, 12:32 AM DEV CONS

42. Base on Rule VII & VIII of National Building Code, what is
the Maximum ISA for the project?

A 155.4 sqm B 30.34 sqm

C 140 sqm D 60.68 sqm

43. Base on project given data, what is the acquired MACA of


the project?

A 155.4 sqm B 163.4 sqm

C 140 sqm D 295.4 sqm

44. Base on Rule VII & VIII of National Building Code, what is
the combined Minimum USA and Maximum ISA for the
project?

A 45.51 sqm B 163.4 sqm

C 75.58 sqm D 295.4 sqm

45. Base on Rule VII & VIII of NBCP, Table VII.I, what is the
Allowable Maximum TGFA of the project?

A 3,276.72 sqm B 2912.64 sqm

C 2,730.6 sqm D 3,094 sqm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 11/13
12/16/23, 12:32 AM DEV CONS

46. Base on the Rule VII & VIII of NBCP, what is the ratio for
minimum required parking slot for the project?

A 1slot:75sqm GFA B 1slot:100sqm GFA

C 1slot:70sqm GFA D 1slot:50sqm GFA

47. Base on the project given data, what is the TGFA of the
project?

A 700 sqm B 774.6 sqm

C 560 sqm D 996 sqm

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 12/13
12/16/23, 12:32 AM DEV CONS

Answer Key

1. b 2. b 3. c 4. b

5. d 6. d 7. a 8. d

9. c 10. b 11. d 12. a

13. c 14. b 15. b 16. d

17. a 18. d 19. a 20. d

21. b 22. c 23. b 24. b

25. d 26. d 27. d 28. a

29. c 30. b 31. b 32. b

33. a 34. c 35. a 36. d

37. d 38. c 39. d 40. a

41. b 42. d 43. d 44. c

45. c 46. c 47. d

https://quizizz.com/print/quiz/657bef2f92b3164c75e4c79d 13/13