Vipul Constructions RMC plant approval reg_


Faqar Alam <alamf@KECRPG.COM>
Wed 2/23/2022 11:10 AM
To: Abhishek Shah <abhishek.shah@howeindia.com>
Cc: Salumuri Ramakrishna <salumurir@kecrpg.com>;Bikash Kali Halder
<halderb@KECRPG.COM>;Omprakash Sharma <omsharma.civil@gmail.com>;darjipiyush73@gmail.com
<darjipiyush73@gmail.com>;Satya Sistla Narayan <narayana@kecrpg.com>;Sandeep Kumar
<kumarsandeep1@kecrpg.com>;Sudhir Pandey <pandeys55@kecrpg.com>;Vishwanand Bansi Dhar
<dharvb@kecrpg.com>;Rakhshan Ahmad <ahmadr@kecrpg.com>

6 attachments (11 MB)


water.pdf; 10mm.pdf; FA.pdf; 20mm.pdf; Batching plant calibration vipul.pdf; IMG_20220222_0001.pdf;

Dear Sir,

This is a reference to the Joint visit carried out on date -16/02/2022 with Piyush Sir (Howe Rep) for
the approval of M/s Vipul Construction Concrete Batching plant situated at location -Bhuj Road
Nana Kapaya Near Maruti Showroom Mundra.

Observation of Setting up a Quality Lab/testing facility for aggregates testing, Cube testing, etc
was raised.

Now we are pleased to inform you that M/s Vipul Const. has a setup testing facility required for
aggregate testing, Slump Testing, Cube testing, etc at B/plant premises.

A joint visit was carried out on date -22/02/2022 after setting up the testing facility along with
Mr.Om Prakash Sir (Howe Rep).

I attached the following documents as discussed during a joint visit for your kind review-

1) Batching Plant Calibration


2) Lab Equipments Calibration.
3) Water Test Report.
4)Coarse / Fine Aggregates Test Report.

In view of the above, we request you to please approve M/s Vipul Construction batching Plant for
Concreting in the RE-209 project.

Regards
Faqar Alam