Professional Documents
Culture Documents
Location (X, Y, Z)
Year of development
Depth
Casing Diameter
Pump capacity
Year of construction
Material of construction
Capacity
Elevated or on ground
service condition
Lay out of the pipe network; hard copy & (soft copy; Excel or AutoCAD)
Length
Material type
Diameter
Year of installation
Page 1 of 2
Lot-III (Angelelo Gonosa Water Supply Study & Design Project
VII. Water quality condition; attach copy if there is a laboratory test result
Water sold for the same period of water production for 12 months
IX. Basic Water supply challenges/problems and the need for this project
Page 2 of 2