23RD AUGUST, 2023
To: Chairperson
Building Committee
1.0 Introduction
This report follows an Environment inspection that was done on 23 rd August, 2023 by the
Environment Officer as part of the steps towards approval process of the submitted building plan
of a church, file number: M725/D2/23/236/MBC.
2.0 Objectives
i. To determine whether the project has or does not have significant Environmental and Social
Impacts.
ii. To determine whether the proposed project does not require an Environmental and Social
Impact Assessment, Environmental Impact Review or a detailed Environmental Impact
Study.
iii. To identify possible mitigation measures where impacts are negative.
3.0 Findings
3.1 Site location
The proposed site is located at Nabweru South III Cell, Nabweru South Ward, Nansana Division,
Nansana Municipality at Geographical coordinates; Latitude: 0.357270°, Longitude:
32.546621°.
Page 1 of 5
3.3 Ecological status
The site is located on a gently sloping terrain with no vegetation since the land is already
developed. The site has soils characterized as red and shallow with a sandy-loam texture.
Consultations made from the neighboring residents indicated that there are mixed opinions
among community members about the level of noise pollution done by the church. Out of the
seven interviewed community members near the church, only one person reported discontent
with the noise from the church while the rest of the members reported that the church does not
produce a lot of noise.
PICTORIAL
Page 2 of 5
Figure 1. Google image showing location of Divine River church in the red polygon.
Page 4 of 5
prescribed by regulations. Since construction of places of worship is among those listed in the
schedule, the developer is required to submit a project brief to the Authority (NEMA) for
consideration and approval.
6.0 Discussion
The proposed church development is to be located within an area surrounded by residential
settlement and thus likely to have adverse impacts on human health through pollution of noise.
Therefore, the development proposal is subject to an Environmental and Social Assessment.
Matovu Brian
Environment Officer, Nansana
C.C Town Clerk-Nansana Municipal Council
C.C Senior Environment Officer
C.C Developer-Divine River Church
Page 5 of 5