According to the Ministry of
Industry regulations. On the
Submit a document to hearing of public opinion on
conduct public hearings. the issuance of the certificate
Scheduled period In of factory operation. Factory
the ministry announcement license and factory extension
Subject Reducing the time
Practice about the consideration. Apply for a license. / The permit. Under the factory law
Factory operation results of the public (No. 2), BE.2557
And plant expansion
According to the Factory Act BE. 1. Consider the Risk
2535 BE.2557 (30 days) The officer determines the Assessment Report /
completeness / accuracy of ESA (if applicable).
the document / factory 2. Consider the EHIA
report (if applicable).
3. Consider EIA
Report results consideration (if
applicable)
Allow Disallow
Factory Group 3
30 days
Recommendations
1. Application form (ร.ง. 3/1) is required. Fill all requirements completely.
2. Submit the application to Department of Industrial Works.
3. Payment rate as specified in the Ministerial Regulation.
4. If renewal application is submitted after the expiration date, but not more than 60 days,
a fine of 20% of the fee is charged.
5. Normally, factory inspection will have been carried out before the renewal submission.
6. If all in order and the fee has been paid, the renewal license will be issued and ready for
pick-up. Or if preferred , it can be sent by post to an address indicated in the application.
7. If all of this is not in compliance, or the inspection has not been conducted, an
acknowledgement document of such application will be issued as an evidence.