.Customer Services Dept.

Installation Sec

Compound Hydro Test Form


#IN# PIN

Date: ……………… Project Title: Compound Villa Buildings

Contractor Engineer Name: …………………………………..…………………… Mobile.no. ………………….


Documents Submittal (Copies):
1 Yes No
Service Site Plan (SSP)
2 Internal network Material Yes No
3 Gun Metal Ferrule Yes No
4 Gate valves Yes No

Internal network:
1. Network Pipes Pore Diameter/type: …………... mm Approved Reject
2. All Gun Metal Ferrule tie in to individuals: Approved Reject
3. All Gate/Sluice valves (control valve): Approved Reject
4. Control valves oreintation: in chamber in Service box Reject
5. Tapping for Irrigation from the network: Approved Reject
6. Tapping for Swimming Pool from the network: Approved Reject

7. Pipes Type: HDPE DI Approved Reject

Tanks:
a. Domestic Demand m3 c. Domestic tank capacity m3

b. Fire Tank capacity m3 d. Irrigation tank capacity m3

Consultant:
Name : …………………………………………….…
Mobile no. : ……………….…………………………
Email : ………………………………………….……

Tested in 6 bar: Fail Pass Pres.Drob Re-inspection

Phase 1 : ……………………………………………. Phase 2:……………………………………..

Installation Engineer Signt. : ………………………………………… date: / /

CS-CSI-P3/F5 Issue :3 01-12-2019


of 1 1