Professional Documents
Culture Documents
5.5.13.1.2. Lift/rotate rail up/inboard and reinstall retaining pins in pivot lugs to secure
rail in new location.
5.5.13.1.4. Two retaining pins are removed from the pallet lock cavity.
5.5.13.1.5. After the rail is rotated inboard, lock is placed in new cavities exposed and
secured with retaining pins.