JOB HAZARD ANALYSIS

DESCRIPTION OF WORK: ATTACHMENT TO WORK PERMIT NO.:

DATE:

WORKSITE: LUZON IMPORT TERMINAL


PERFORMED BY: SUWASO WINDS TECHNOLGY CONSTRUCTION INC.
VERIFIED BY: (AREA-IN-CHARGE)
PRESENCE OF PARASITE

BASIC JOB STEPS EXISTING POTENTIAL HAZARDS CONSEQUENCES RECOMMENDED CORRECTIVE MEASURES
Designate a trained PTW Coordinator.
Unfamiliar to permit system Potential injury and Property Damage
Familiarization of work site for permit application.
Injury due to non-compliance for
Incomplete Signatures Strict implementation and compliance on the requirements to the PTW procedure.
unauthorized work.
Property Damage / Physical injury due
Insufficient information stated in the Prior to fill out and application of work permit, construction team must endorse to the PTW
to lack of information on the activity to
permit. detailed activity ad specific location.
be done.
Work Permit from Client to be Obtained
Prior to start of the activity, safety task assignment is to be discussed by the supervisors to the
1 Workers not attending safety task
Injury / Death due to lack of awareness. workers capturing hazards accompanied by the activity.
Submit the PTW Two Day Before the Activity assignment
Ensure that all supervisors are noted on the activity by signing on the allocated signature box.
Injury / Death / Property Damage due Strict compliance of PTW.
Miscommunication to failure to communicate the hazard of Toolbox meeting to be discussed prior to each activity.
the activity.
Injury / Death / Property damage due
Ensure that all materials to be used are approved by the client.
Unauthorize activity to poor quality or inappropriate type of
Ensure lifting plan is approved by the client
materials to be used.
Improper lifting & body positioning Muscle strains Proper lifting techniques, Proper body position
Uneven surfaces Slips/Trips/Falls Be aware of surroundings, maintain good housekeeping
Improper/inadequate rigging Fall of Loads, Property damage Proper rigging, Personnel rigger trained (NC I,II,III if applicable)
Unauthorized Personnel in working Struck by/Crushed by equipment, load, Isolation of the lifting area (barricade and signages)
Lifting with aid of Heavy Equipment (Crane, area object. Use spotter with hi-vis vest, set buffer zone per procedure
2
boom truck) Unauthorized personnel operating Equipment failure may lead to property
Use trained operator (NC I,II,III if applicable)
equipment damage or personnel Injury
Equipment failure property damage or Personnel injury Properly inspect equipment before use, never leave equipment while load is suspended.
Loss of primary containment Chemical spills Pre-use inspection, annual inspection, spill kits
Imbalance of equipment leads to
Unsafe Soil Condition / Equipment Plat Pre compaction of Working Area And test for soil Stability
Equipment Collapse