You are on page 1of 3

CHAPTER FOUR

BUDGET BREAKDOWN AND WORK PLAN

4.1 BUDJET BREAK DOWN

Cost of stationary materials Quantity Unit cost in birr Total in birr

paper 100 1.50 cents 150.00

Pen 3 15birr 45 birr

Pencil 3 10 birr 30 birr

Rubber 1 10 birr 10 birr

Note book 1 40birr 40birr

Ruler 1 30 birr 30 birr

Binder 1 50 birr 50birr

Secretarial cost 100 pages 10 birr 1000birr

Printing 100 5 birr 500 birr

Copy 12 4 birr 48 birr

Internet (package) - 200 birr package 200 birr

Telephone call 100 minute 0.5 birr 50 birr

Total cost 2153.00 birr

Hence the budget cost that necessary for the study will be showing by the following table.
PLAN OF RESEARCH UNDERTAKING

4.2. WORK PLAN

In order to manage the overall running of the study the researcher will develop working plan
which served as a guideline for performing activities.

No List of activities Duration(G. C)


.
1 Preparation of thesis proposal January. 1– January 30/2023

2 Submission of final draft proposal to Advisor with compiled February1– February 20/2023
questioners
3 Collecting feedback from Advisor February20– February 30/2023

4 Data collection and Administer questionnaire March 10 – March 30/2023


5 Data screening, encoding, entry, generating preliminary April – April 17 /2023
analysis and interpretation
6 Writing up of thesis April 18 – June 7/2023

7 Submission of first Thesis draft to Advisor June 8 – Jun 10/2023

8 Time for Advisor review, Incorporate Advisors Comments June 11– June 20/2023

9 Submission final thesis to program coordinator in hard copy June 21– June 28/2023
(2 copy) signed by advisor

10 Final Thesis Defense Workshop July 10 – July30/2023

You might also like