11 Time beget
The table below shows a time schedule for different activities that will be performed in doing the
thesis.

Table 3.3 Time Beget break down


No Activities Time duration
1 Writing research proposal November 1-22
2 Instrument development November 23- December 16
3 Pilot testing and Validation December 17- January 15
4 Final data collection January16- February 5
5 Data entry February 6-February 20
6 Data analysis & First draft submission February 21- April 15
7 Final draft submission April 30
3.12. Budget Break Down

This is the overall budget break down of my proposal.

Table 3.4 Budget break down

No Items Units Quantity Unit Price Total Remark


Price
1 Stationary Packets 3 120 Br. 360 Current
 A4 computer paper price
2 Transparent Cover Number 3 10 Br. 30.00
3 Hard Cover Number 3 10 Br. 30.00
4 Pen Number 6 10 Br. 60.00
5 Per Dim Days 45 300 Br. 13,500.00
6 Transport and Taxi 3 days 3 500 1,500 &
services /at AA & Gilgel 150.00
Beles Towns
7 Photocopy services No of 1000 1 Br 1,000.00
pages
8 Internet Services costs Minute 700 0.50 cent/min 350.00
9 Computer writing service Pages 200 5 Br./page 1,000.00
10 Printing service (Draft & pages 400 1Br. 400.00
Final Research Documents)
11 Contingency costs 2,000.00
Total 20,380.00

Justifications: - Total budget /cost/ required to this study is ET. Birr 20,380.00 (twenty three
thousands one hundred forty Ethiopian Birr). It is because of the place of study is far from the Bihar
Addis Ababa by 542 km and every material and service costs are increasing now a days, due to
different reasons.