12 v Motor 2 356.00
1 small 20.00
Nail 1 10.00
Bearing 2 240.00
TIMETABLE:
In this part of the project proposal, the proponent will evaluate the schedule implemented.
This timetable will present the start and the completion date of project. The proponent
made a crucial schedule timetable to ensure the success of the project. With this timetable
for the Mini-hydro generator this will be used to track, to decrease any errors, and to
know the appropriate resources that will be uses in the making of the Mini-hydro
generator. The proponent increases the time duration of the paper works starting from
introduction to methodology to ensure the quality of the Mini-hydro generator. A graph
will be used to represent the schedule planned:
Paper Works (Methodology Part) September 16, 2020 September 25, 2020
Total: 1 month 23
days
MANPOWER:
Workers Quantity
Engineer 5