Professional Documents
Culture Documents
Charge Hand Over Between The Shifts - 1
Charge Hand Over Between The Shifts - 1
Prepared by: X X
Department Name Date
Approved by: Y Y
Department Name Date
Authorized by: Z Z
Department Name Date
Title:
CHANGE HAND OVER BETWEEN THE SHIFTS
1. Purpose
This procedure defines the requirements of the instruction to be given by current shift
officer shift to the next shift officer for charge hand over.
2. Scope
3. Validity
This SOP is valid only until next revision date and if it bears control seal.
4. Responsibility
It will be the responsibility of the shift leaders to follow the procedure. Quality assurance
manager is responsible for SOP compliance.
Log books
6. Procedure
Following are the instruction to be given by current shift officer shift to the next shift officer
for charge hand over.
Second shift officer has to write jobs done in this shift on shift logbook along with the
instructions for 1st shift.
a. Description of the job completed in the second shift.
b. Reason for not completing the job given to 2nd shift, if there is any.
c. Precautions to be taken by the first shift officer (or general shift) before
stating the production. i.e. Completion of maintenance and cleaning jobs.
d. Any special instructions concerned with machine, product, manpower etc.
e. Details of any problem that occurs in shift should be written in the shift
logbook.
f. First shift officer should refer these instructions before starting the work.
7. Abbreviations:
SOP Standard Operating Procedure
8. Related Documents /Applicable document/
None
9. Revision History
Version
Revision Description
No.
1 New