You are on page 1of 1

Họ và tên: Nguyễn Cao Hiếu Lam

MSSV: 49.01.701.059
Lớp: 49.01.SPANH.C
The given maps depicts changes that Dreamland has encountered in two different
years.
Overall, there were considerable alterations in Dreamland over a period the 31
year interval starting from 1992, which transformed the town into a largely
residential area. As can be seen from the map, most of the available facilities have
been updated.
Looking at the details, in 1992, the town had very few comfortable feature. As
regards the East of the town, there was a toy shop and kindergarten next to the
children playground and a bus stop while at the West of Dreamland stood an old
market and a pond. Following the High Street down the Fairy Avenue, there lied a
forest at the South of the city.
In the year 2023, the town undergone diverse improvements compared to 1992.
In terms of the Eastern part of the town, the toy store was deleted while the bus
stop was enlarged and renovated into a metro station which was still in progress.
Similarly, the kindergarten and the playground was replaced by the university
and the hall of residence respectively. With regard to the Western region, one
marked point is the building of the apartment complex. The new shopping mall
was constructed in place of the old market and the pond was reconstructed into
the Tiara fountain. The woods positioned at the Southern side of Dreamland was
chopped down to make room for the Angel central park.

You might also like