types of hard

strata like
concrete,
conglomerate,
rock etc soil
including back MEASUREMENTS SHEET
PROJECT
filling :- Construction with of Basti Rasheedabad Mosque, Khanewal.
BOQ.Item SR. excavated soil in MEASUREMENTS
DESCRIPTION
layers not NO. QUANTITY UNIT
No No. LENGTH BREADTH HEIGHT
exceeding 6"
Excavation
thickness in
1.01 depressions,
1 around
sec-A grid 2/B~D 1 31.670 3.67 5.00 581.14 Cft
2 foundations
sec-A grid 7/B'~D 1 21.000 3.67 5.00 385.35 "
3 including
sec-K disposal
grid 7/B 1 16.170 5.67 5.00 458.42 "
Providing
of surplus
sec-B and
earth,
grid B/2~4
4 applying
cutting+ 5~6 Anti- and 1 11.500 3.67 5.00 211.02 "
5 Termite "
removing all the 1 16.625 4.67 5.00 388.19 "
6 Treatment
growth, sec-G undertrees, 1 12.000 3.17 5.00 190.20 "
floorssec-E
bushes, small
and
7 sec-J grid 1'+7'/Dstriping, in 2 2.500 2.67 5.00 66.75 "
portion parallel to
8 foundations
hard
sec-E
standing
& sec-G
(bed
and
at 2 2.500 3.17 5.00 79.25 "
& sec-J abovesides)
vertical
disposal (grid
as
9 with grid 1+8
1'+7'/C)
approved/ 2 47.330 3.17 5.00 1,500.36 "
directed (i/c all
10 pressureC~F+G~K
sec-J grid 1 / F~G
spraying 1 20.420 2.67 5.00 272.61 "
lead and
sec-D (x-dir) lift)
grid
11 equipment,
complete using
etc as 2 12.920 3.67 5.00 474.16 "
3+6 / D~F
12 Biflex
sec-C grid
directed proand FMC
D/2~7 as 1 38.125 4.17 5.00 794.91 "
sec-D
USA
per or(y-dir)
Mirage
instructions grid 5
of
13 1 22.770 3.67 5.00 417.83 "
sec-FE/3~6grid F/1~3
14 %Engineer SCIn 2 13.750 3.17 5.00 435.88 "
(charge.
sec-D
sec-H,G+Distributors
6~8
(x-dir) grid
(y-dir)
15 Friends 2 23.500 3.67 5.00 862.45 "
grid3'+5'
G+J+K / G~K / 1~3'
16 International 6 14.500 3.17 5.00 1,378.95 "
+ 5'~8 ,,,,,, + K /
17 Marketing
sec J (Grid
3'~5' j'/1~3') 1 14.500 2.67 5.00 193.58 "
18 Rawalpindi/Ibd
Boundary Wall 1 361.330 2.00 3.00 2,167.98 "
Ph: 051
Total - 10,859.03 Cft
4575690 - 1 &
Add 20% extra 13,030.84 Cft
Cell No: 0346 -
4993037) as
Anti-termite
approved
Providing, mixing,
1.02 pesticide
laying solution
and
1 through
grid 2~7
compacting / B~C an 1 22.630 44.25 - 1,001.38 Sft
approved
2 cement C~Ksub-
grid 1~8 /concrete 1 68.000 54.75 - 3,723.00 "
contractor, as
1:4:8 per
under "
manufacture's
foundations, Total etc 4,724.38 Sft
specifications
at any elevation and
Add
all to 5%
the extra
approval 4,960.60 Sft
with sand and
of
crush theof Engineer
size 3/4"
Incharge
Concrete
and 1:4:8(The
down (of
1.03 contractor quarryis/
approved
required
1 source)
sec-A grid including
2/B~D to 1 31.670 3.67 0.33 38.36 Cft
provide
curing five years
and form
2 sec-A grid 7/B'~D 1 21.000 3.67 0.33 25.43 "
guarantee for full
3 work sec-K etc,
effectivenessgrid all7/B as
of 1 16.170 5.67 0.33 30.26 "
per
sec-B grid drawings,
B/2~4
4 the 1 11.500 3.67 0.33 13.93 "
+anti-termite
specifications
5~6
5 complete
treatment). " etc as 1 16.625 4.67 0.33 25.62 "
Complete
6 directed sec-G etc as
and as 1 12.000 3.17 0.33 12.55 "
7 directed
per sec-E
sec-J and
gridsmall
instructions
1'+7'/D as
of 2 2.500 2.67 0.33 4.41 "
per instructions
portion
Engineer parallel to of
In
8 sec-E & sec-G at 2 2.500 3.17 0.33 5.23 "
Engineer
sec-J above (grid
charge.
9 Incharge.grid 1+8
1'+7'/C) / 2 47.330 3.17 0.33 99.02 "
10 (PaymentC~F+G~K
sec-J grid shall1 / F~G be 1 20.420 2.67 0.33 17.99 "
sec-D (x-dir) grid
11 made as per 2 12.920 3.67 0.33 31.29 "
3+6 / D~F
12 covered
sec-C grid area)D/2~7 1 38.125 4.17 0.33 52.46 "
sec-D (y-dir) grid
13 1 22.770 3.67 0.33 27.58 "
sec-FE/3~6grid F/1~3
14 2 13.750 3.17 0.33 28.77 "
+ 6~8
Providing, mixing,
laying, vibrating
and curing
reinforcement
cement concrete
sec-D
sec-H,G (x-dir) grid
(y-dir)
15 (RCC 1:2:4) in 2 23.500 3.67 0.33 56.92 "
grid 3'+5'
G+J+K
Foundation / G~K / 1~3'
using
16 6 14.500 3.17 0.33 91.01 "
+ 5'~8of,,,,,, +K/
17 crush
sec J (Grid required
j'/1~3') 1 14.500 2.67 0.33 12.78 "
size 3'~5'(1/2" and
18 down)underand planter sand 2 4.375 1.88 0.38 6.15 "
(of approved 0.00 "
quarry / source) 0.00 "
with minimum
Total 573.61 Cft
compressive
Add 5% extra 602.29 Cft
cube
Concrete 1:2:4strength
(Foundation) of
3000 psi at 28
1.04
days, in the RCC
1 works
sec-A gridas 2/B~Dshown 1 31.670 3.00 1.00 95.01 Cft
2 onsec-A grid 7/B'~D
drawings at 1 21.000 3.00 1.00 63.00 "
3 any sec-K grid 7/B
height/floor, 1 16.170 5.00 1.00 80.85 "
sec-B grid B/2~4
4 including the cost 1 11.500 3.00 1.00 34.50 "
of form+ 5~6work but
5 " 1 16.625 4.00 1.00 66.50 "
6 excluding sec-G
the cost
1 12.000 2.50 1.00 30.00 "
of sec-E reinforcing
small
7 steel
sec-J grid 1'+7'/D 2 2.500 2.00 1.00 10.00 "
portionallparallel
Providing, as per
mixing, to
8 laying,
sec-E above
drawings & sec-G
vibrating at 2 2.500 2.50 1.00 12.50 "
sec-J (grid
9 and grid
specifications1+8
1'+7'/C) /
curing 2 47.330 2.50 1.00 236.65 "
C~F+G~K
complete grid 1etc
10 reinforcement
sec-J / F~G as 1 20.420 2.00 1.00 40.84 "
sec-D (x-dir)
directed
cement and
concretegrid
as
11 2 12.920 3.00 1.00 77.52 "
3+61:2:4)
/ D~F inof
per instructions
12 (RCC
sec-C grid D/2~7 1 38.125 3.50 1.00 133.44 "
Engineer
following
sec-D (y-dir)works gridIn
13 charge.
using Margalla 1 22.770 3.00 1.00 68.31 "
sec-FE/3~6grid F/1~3
14 crush of required 2 13.750 2.50 1.00 68.75 "
sec-D +(x-dir)
sec-H,G 6~8 grid
15 size (1/2"(y-dir) and 2 23.500 3.00 1.00 141.00 "
grid3'+5'
G+J+K / G~K / 1~3'
16 down) and 6 14.500 2.50 1.00 217.50 "
+ 5'~8 ,,,,,, + K /
Lawrancepur
17 sec J (Grid j'/1~3') 1 14.500 2.00 1.00 29.00 "
sand 3'~5' with
Total 1,405.37 Cft
minimum
Add 5% extra
compressive 1,475.64 Cft
Concretecube
1:2:4 strength
(Plinth Beams) of
1.05 (a) 3000 psi at 28
1 days, in PB-3the RCC 1 12.330 1.13 1.00 13.87 Cft
2 works as
Sec A shown 1 40.000 0.75 1.00 30.00 "
3 on drawings " at 1 40.000 0.88 0.33 11.55 "
any height/floor,
4 " 1 40.000 0.38 1.00 15.20 "
including
PB-1 (Grid the 2cost /
5 of form work but 1 21.500 1.13 1.00 24.19 "
PB-1B~C) (Grid 7 /
6 excluding the cost 1 20.000 1.13 1.00 22.50 "
PB-1 B~C)
(Grid 1+8 /
7 of reinforcing 1 19.255 1.13 1.00 21.66 "
PB-2C~F) (Grid C /
8 steel all as per 2 4.125 1.13 1.00 9.28 "
PB-21~2(Grid
+ 7~8) 2+7 /
9 drawings 2 4.625 1.13 1.00 10.41 "
PB-6C~D) (Grid D /
10 specifications 2 4.500 0.75 1.00 6.75 "
1~2 (Grid
PB-4 + 7~8) D/
11 complete etc as 1 37.000 0.75 1.00 27.75 "
2~7)
12 directed
PB-5 (Gridand E/3~6) as 1 25.000 0.75 1.00 18.75 "
per instructions
PB-2 (Grid F / of
13 2 12.000 1.13 1.00 27.00 "
Engineer
PB-41~3(Grid
+ 6~8) 3+6 In /
14 charge. 2 14.250 0.75 1.00 21.38 "
D~F)
15 Sec C 1 22.000 0.75 1.00 16.50 "
PB-7 (Grid 1+8 /
16 2 20.250 0.75 1.00 30.38 "
PB-7G~K) (Grid K /
17 2 16.500 0.75 1.00 24.75 "
1~3' (Grid
PB-8 + 5'~8) G/
18 2 16.500 0.75 1.00 24.75 "
PB-91~3' + 5'~8)
(Grid 3'+5' /
19 2 15.255 0.75 1.00 22.88 "
PB-10 G~K)(Grid J /
20 1 16.500 0.75 1.00 12.38 "
PB-11 1~3')
(Grid K /
21 1 16.750 0.75 1.00 12.56 "
3'~5')
laying, vibrating
and curing
reinforcement
cement concrete
(RCC PB-12 1:2:4)
[x-dir]in
22 following 2 11.920 0.75 1.00 17.88 "
(Grid / works
3°+3[x-dir]
PB-12 G~J')
23 using Margalla 1 4.810 0.75 1.00 3.61 "
(Grid
PB-122 [y-dir]
/ J~J')
24 crush of required 1 7.940 0.75 1.00 5.96 "
(Grid H / 3°~3')
25 size Sec (1/2"J and 1 16.500 0.75 1.00 12.38 "
26 down)Boundary wall and 1 361.330 0.75 0.75 203.25 "
Lawrancepur 0.00 "
sand with
Total 647.54 Cft
minimum
Add 5% extra
compressive 679.92 Cft
Columns
cube strength of
1.05 (b) 3000 psi at 28
days, in the LVL
Slab +17.5' RCC
1 works as
C-1 shown 5 1.125 1.125 22.17 140.29 Cft
2 on drawings C-2 at 4 1.500 0.750 22.17 99.77 "
any height/floor,
3 C-3 2 1.750 0.750 22.17 58.20 "
including the cost
4 of formC-4 work but 1 1.125 0.750 22.17 18.71 "
5 excluding C-6 xthe2 cost 4 0.750 0.605 22.17 40.24 "
ofSlab +14.5' LVL
reinforcing
steel all
6 Providing, C-5as per
mixing, 2 0.750 0.750 19.17 21.57 "
drawings
laying, vibrating
Slab +12.5' LVL
specifications
7 and C-1 curing 4 1.125 1.125 17.17 86.92 Cft
complete etc as
reinforcement
8 C-4 4 1.125 0.750 17.17 57.95 "
directed concrete
cement and as
Slab +14'
per instructions
(RCC LVL
1:2:4) inof
9 following
Engineer C-7 works In 2 1.500 0.750 18.67 42.01 "
10 using
charge.C-8 Margalla 2 1.500 0.750 18.67 42.01 "
Slab +11.75'
crush LVL
of required
11 size (1/2" C-5 and 4 0.750 0.750 16.42 36.95 "
down)
12 Minaret over roof and 4 0.750 0.75 12.75 28.69 "
Lawrancepur "
sand with
Total 673.29 Cft
minimum
Add 5% extra
compressive 706.95 Cft
Concrete cube
1:2:4 (Slab
strength & Beams)
of
1.05 (c) 3000 psi at 28
days,
Slab: in the RCC Cft
1 works
grid 2~7as/ B~D shown 1 30.750 44.25 0.50 680.34 "
on drawings
2 Verandha roof grid at 1 11.750 28.50 0.50 167.44 "
any height/floor,
Slabs at B/S of verandah slab "
including the cost
3 of form "work but 2 24.250 6.625 0.50 160.66 "
4 excluding" the cost 2 17.125 7.50 0.50 128.44 "
5 of reinforcing
" 2 6.375 1.00 0.50 6.38 "
6 steel
Slab atall gridas4,5per
/ 1 19.875 20.25 0.50 201.23 "
Slabs at grid
7 drawings 2 23.750 18.25 0.50 433.44 "
2+7 / G~K
specifications
8 complete" etc as 4 2.000 1.00 0.50 4.00 "
D/d doam
9 directed and as -1 37.181 0.50 -18.59 "
(3.142xd^2/4)
Beams:
per instructions of "
TB (Grid G~K /In
10 Engineer 4 20.250 0.75 0.50 30.38 "
1+3'+5'+8)
11 charge. D/d col 2 1.750 0.75 0.50 1.31 "
12 D/d col 2 1.125 0.75 0.50 0.84 "
TB (Grid G+K /
13 5 16.500 0.75 0.50 30.94 "
Sec1~3'F at+ 5'~8)
grid K /
14 1 16.750 0.75 1.50 18.84 "
Sec 3~5J at grid
15 2 16.750 0.75 0.50 12.56 "
H+J
Sec D /at3~5
grid
16 Sec 2 19.255 2.08 0.50 40.05 "
1+8D/ at C~Fgrid
17 1+8 / C~F 2 19.255 0.25 0.33 3.18 "
(bottom rib)
Sec D at grid F /
18 Sec D at grid F / 2 12.000 2.08 0.50 24.96 "
1~3 + 6~8
19 1~3 + 6~8 2 12.000 2.08 0.50 24.96 "
TB (bottom
at grid Crib)/ 1~2
20 2 4.125 0.75 0.50 3.09 "
TB at+grid 7~83+6 /
21 2 10.000 0.75 0.50 7.50 "
LB5 at D~Fgrid E /
"
3~6
22 Upper portion 1 25.000 1.50 0.50 18.75 "
23 upper ribs 1 25.000 0.25 0.33 2.06 "
24 lower portion 1 25.000 0.75 1.50 28.13 "
25 lower ribs 1 25.000 0.38 0.38 3.61 "
26 TB at grid D / 2~7 1 37.000 0.75 0.50 13.88 "
TB-1 at grid 7 /
27 1 14.875 1.13 0.50 8.37 "
TB-1 B'~Cat grid 2 /
28 1 21.500 1.13 0.50 12.09 "
TB at B~C grid 2+7 /
29 2 4.625 0.75 0.50 3.47 "
Sec C~D E at Grid
30 1 35.670 2.00 0.50 35.67 "
B/2~6
31 BB-3 1 6.250 1.125 1.50 10.55 "
32 BB-3a 1 4.375 1.125 1.50 7.38 "
33 BB-4 1 9.000 1.50 1.50 20.25 "
34 B-1 2 27.250 1.00 1.50 81.75 "
35 B-2 4 5.290 1.00 1.50 31.74 "
Ring Beam
36 1 49.518 1.00 1.50 74.28 "
(L=2x3.142xr)
Mehrab upper
37 1 9.000 0.75 1.00 6.75 "
Mehrab beam lower
38 1 12.570 0.75 1.00 9.43 "
Side archbeam portion
39 Beams at 2 11.250 0.75 16.88 "
of Mehrab
intermediate "
40 levels
Sec A 1 25.000 0.75 1.00 18.75 "
41 Sec B 2 15.000 0.75 1.00 22.50 "
42 Sec G 2 15.250 0.75 1.00 22.88 "
Shade
Providing, mixing, "
Projection:
43 laying,Secvibrating
A 1 44.250 0.514 22.74 "
44 and Sec Bcuring 2 10.750 1.140 24.51 "
45 reinforcement
Sec C 1 28.500 0.300 8.55 "
46 cement Secconcrete
D 2 50.750 0.300 30.45 "
47 (RCC Sec 1:2:4) in
E 1 105.750 0.970 102.58 "
following works
48 using SecMargallaF 1 20.250 0.490 9.92 "
49 crush Sec G
of required 2 19.875 0.490 19.48 "
50 size Sec (1/2"H and 2 67.625 0.490 66.27 "
51 down) Sec J and 1 20.250 0.490 9.92 "
Lawrancepur "
sand with
Total 2,705.52 Cft
minimum
Add 5% extra
compressive 2,840.80 Cft
Concretecube
1:2:4 strength
(Lintel Beams)
of
1.05 (d) 3000 psi at 28
days,LB-3 (Grid
in the RCC 0.00 Cft
works B/2~3)
as shown
1 Sec 2-2 1 3.375 0.75 1.50 3.80 "
2 on drawings " at 1 3.375 1.62 0.25 1.37 "
any height/floor,
3 " 1 3.375 2.00 0.50 3.38 "
including the cost
4 of form Secwork 3-3 but 2 6.625 0.75 0.75 7.45 "
5 excluding" the cost 2 6.625 1.25 0.33 5.47 "
LB-3a (Grid
6 of reinforcing 0.00 "
B/5~7)
7 steel Sec all 2-2
as per 1 3.375 0.75 1.50 3.80 "
8 drawings " 1 3.375 1.62 0.25 1.37 "
specifications
complete etc as
directed and as
per instructions of
Engineer In
9 " 1 3.375 2.00 0.50 3.38 "
10 Sec 3-3 2 6.625 0.75 0.75 7.45 "
11 " 2 6.625 1.25 0.33 5.47 "
LB-1 (Grid
0.00 "
7/B~C)
12 Sec 1-1 1 17.375 0.75 0.27 3.52 "
13 " 1 17.375 1.13 0.50 9.77 "
14 " (Arch portion) 3 13.347 0.38 15.02 "
15 Grid 7/C~D 1 4.625 0.75 0.75 2.60 "
LB-2 (Grid
0.00 "
2/B~C)
16 Sec 1-1 1 17.375 0.75 0.27 3.52 "
17 " 1 17.375 1.13 0.50 9.77 "
18 " (Arch portion) 3 13.347 0.38 15.02 "
19 Grid 2/C~D 1 4.625 0.75 0.75 2.60 "
LB-4 (Grid
0.00 "
D/2~7)
20 Beam 1 33.250 0.75 0.75 18.70 "
21 Arch Portion 1 13.480 0.75 10.11 "
LB-9 (Grid C /
22 2 4.125 0.75 0.75 4.64 "
1~2 (Grid
LB-7 + 7~8)8 /
0.00 "
C~F)
23 Beam 1 22.250 0.75 0.75 12.52 "
24 Arch Portion 2 5.500 2.00 0.75 16.50 "
D/d Arch inner
25 -2 5.460 0.75 -8.19 "
LB-8portion
(Grid 1 /
0.00 "
C~F)
26 Beam 1 22.250 0.75 0.75 12.52 "
27 Arch Portion 1 5.500 2.00 0.75 8.25 "
D/d Arch inner
28 -1 5.460 0.75 -4.10 "
LB-9portion
(Grid 3+6 /
29 2 14.250 0.75 0.75 16.03 "
LB-6D~F)
(Grid F /
0.00 "
1~3 + 6~8)
30 Beam 1 13.875 0.75 0.75 7.80 "
31 Arch Portion 1 5.500 2.00 0.75 8.25 "
D/d Arch inner
32 -1 5.460 0.75 -4.10 "
LB-9 portion
(Grid G /
33 1 16.500 0.75 0.75 9.28 "
LB-101~3')
(Grid G /
0.00 "
5'~8)
34 Beam 1 16.500 0.75 0.75 9.28 "
35 Arch Portion 1 7.500 3.00 0.75 16.88 "
D/d Arch inner
36 -1 12.090 0.75 -9.07 "
portion
LB-9 (Grid
37 3 21.750 0.75 0.75 36.70 "
3'+5'+8 / G~K)
38 D/d col -2 0.750 0.75 0.75 -0.84 "
39 D/d col -4 2.750 0.75 0.75 -6.19 "
LB-13 (Grid 1 /
40 1 1.00 "
G~K)
41 Beam 1 20.250 0.75 0.75 11.39 "
42 Arch Portion 1 4.125 2.00 0.75 6.19 "
D/d Arch inner
43 -1 4.320 0.75 -3.24 "
portion
44 Arch Portion 1 5.080 2.75 0.75 10.48 "
D/d Arch inner
45 -1 5.460 0.75 -4.10 "
LB-11 portion
(Grid K /
46 0.00 "
1~3' + 5'~8)
47 Beam 2 16.500 0.75 0.75 18.56 "
48 Arch Portion 4 5.500 2.00 0.75 33.00 "
D/d Arch inner
49 -4 5.460 0.75 -16.38 "
LB-12 portion
(Grid K /
50 0.00 "
3'~5')
51 upper beam 1 16.750 1.00 0.75 12.56 "
52 lower beams 2 5.375 0.75 0.75 6.05 "
53 upper arch 1 7.500 3.25 0.75 18.28 "
laying, vibrating
and curing
reinforcement
cement concrete
(RCC
D/d Arch1:2:4) innerin
54 following works -1 -9.430 0.75 7.07 "
portion
55 usinglower arches
Margalla 2 5.375 2.00 0.75 16.13 "
D/d Arch inner
56 crush of required -2 4.270 0.75 -6.40 "
LB-9 portion
(Grid J /
57 size (1/2" and 1 16.500 0.75 0.75 9.28 "
Lintel1~3')
at court
58 down) and 2 22.000 0.54 0.25 5.94 "
yard walls
Lawrancepur "
sand with
Total 385.52 Cft
minimum
Add 10% extra
compressive 424.08 Cft
Concrete 1:2:4
cube (Dome
strength / Mehrab)
of
1.05 (e) 3000 psi at 28
days, Dome:
in the RCC Cft
works
R = 6.88' as +shown0.25' "
onA = drawings
(4 x 3.142 xat
1 1 319.459 0.50 159.73 "
any r^2)/2
height/floor,
Mehrab: "
including the cost
R = 4' + 0.50'but
ofA form "
= (4 xwork3.142 x
2 excluding the cost 1 63.625 0.50 31.81 "
r^2)/4
ofMinaret Dome:
reinforcing "
Providing,
steel all +
R = 1.75' mixing,
as per
0.29' "
A = (4 x vibrating
laying,
drawings 3.142 x
3 1 26.151 0.50 13.08 "
Middle r^2)/2
Vertical
4 and
specifications curing 1 12.568 0.25 0.50 1.57 "
portion
reinforcement
Lower
complete Vertical
etc as
5 1 12.819 0.29 1.00 3.72 "
cement
directed concrete
portion
Projection and
at Sec as
6 (RCC 1:2:4) inof
per instructions 1 10.000 1.50 15.00 "
C-C
Beams
following
Engineer works In 8 2.500 0.75 0.75 11.25 "
(intermediate)
using
charge. Margalla "
crush of required "
size (1/2" and "
down) and "
Lawrancepur "
sand with
Total 236.16 Cft
minimum
Add 10% extra
compressive 259.77 Cft
Concrete
cube 1:2:4 (Shelves)
strength of
1.05 (f) 3000 psi at 28
1 days,Shelves
in the RCC 12 4.000 1.25 0.17 10.20 Cft
2 works as " shown 4 4.000 2.00 0.50 16.00 "
3 on drawings
Shelves at 6 6.750 1.25 0.17 8.61 "
any height/floor,
4 " 2 6.750 2.00 0.50 13.50 "
including the cost
of form work but "
excludingTotal the cost 48.31 Cft
Providing
Add
of 5%reinforcing laying
extra 50.72 Cft
Steel
steel 60
all
Steel 60 Grade asgrade
per
Providing
completet
drawings and
as
1.06 Cft/KG
laying
directed first class
specifications by
1 Footing
burnt
Engineer brick 1 Kg #REF! 3.50 #REF!
complete etc as
2 Plinth
masonry Beam 1 Kg #REF! 2.50 #REF!
directed for
Incharge andwallsas
3 Column
per9"instructions
thick and of 1 Kg #REF! 3.75 #REF!
4 above
Roof
EngineerSlab/Beam in
In 1 Kg #REF! 3.00 #REF!
5 Foundation
Lintol Band Beam
charge. and 1 Kg #REF! 2.50 #REF!
6 superstructure
Dome / Mehrab at 1 Kg #REF! 2.00 #REF!
6 any
Shelvesheight/floor 1 Kg #REF! 2.00 #REF!
set in cement
Total Kg #REF!
sand mortar 1:6
including 5 making% AdditionalQua Kg #REF!
Brick Work 9" thick
openings etc or above
as
2.01 shown on
drawings i/c cost
of all materials,
scaffolding,
labour, curing,
cleaning, raking
Slab +17.5' LVL Cft
1 grid 2+7 / B~C 2 20.000 1.13 14.50 652.50 "
2 under mehrab 1 12.000 0.75 7.00 63.00 "
3 Grid B/2~4 + 5~7 2 17.000 2.00 14.50 986.00 "
D/d shelves
4 -4 4.000 1.25 5.50 -110.00 "
portion
5 D/d col portion -2 1.500 0.75 14.50 -32.63 "
6 Grid 2+7 / C~D 2 4.625 0.75 14.50 100.59 "
7 Grid D/2~7 1 37.000 0.75 14.50 402.38 "
Slab +14.5' LVL "
8 Grid E/3~6 1 25.000 0.75 11.75 220.31 "
9 Grid 3+6 / D~F 2 14.250 0.75 11.75 251.16 "
Slab +12.5' LVL "
Grid C / 1~2 +
10 2 4.125 0.75 9.50 58.78 "
7~8
11 Grid 1+8 / C~D 2 5.250 1.13 9.50 112.22 "
12 Grid 1+8 / D~F 2 14.000 1.13 9.50 299.25 "
13 Grid F/1~3 + 6~8 2 12.000 1.13 9.50 256.50 "
Slab +14' LVL "
14 Grid 3'+5' / H~K 2 16.375 0.75 11.00 270.19 "
15 D/d opening -2 4.375 0.75 7.00 -45.94 "
16 Grid H / 3'~5' 1 16.750 0.75 11.00 138.19 "
17 Grid K / 3'~5' 1 16.750 0.75 11.00 138.19 "
Slab +11.75' LVL "
Grid G / 1~3' +
18 2 16.500 0.75 8.75 216.56 "
5'~8
19 Grid 1+8 / G~K 2 20.250 0.75 8.75 265.78 "
20 Add edge portion 2 21.500 0.38 0.38 6.05 "
D/d Detail-Q of
21 -2 44.160 0.75 -66.24 "
opening
D/d Jali "
22 Detail-1 -4 4.000 0.75 4.00 -48.00 "
23 Arch portion -4 5.460 0.75 -16.38 "
24 Detail-2 -2 3.000 0.75 4.00 -18.00 "
25 Arch portion -2 4.270 0.75 -6.40 "
Elevation-02 0.00 "
26 Detail-2 -1 4.000 0.75 4.00 -12.00 "
27 Arch portion -1 5.460 0.75 -4.10 "
28 Grid J/1~3' 1 16.500 0.75 8.75 108.28 "
D/d item # 2.17
29 D/d item #doors)
2.23 0.00 "
(wooden
30 (Aluminium #VALUE! "
Wind.) Total #VALUE! Cft
Add 10% extra #VALUE! Cft
BRICK MASONRY CONCRETE PLASTERING
PREPARED BY AS
Quantity Surveyor S
Ratio 1: 4 Ratio 1 :2:4 Ratio 1:2
Quantity "Cft" 285 Quantity "Cft" 436 Quantity "Sft" 2235
Bricks 3847.5 Cement"Bags" 76.736 Thickness "in" 0.5
Cement"Bags" 13.680 Sand "Cft" 191.840 Cement"Bags" 31.538
Sand "Cft" 68.400 Crush "Cft" 383.680 Sand "Cft" 78.846

3"

9" 4½"
PREPARED BY ASGHAR ALI
Quantity Surveyor SMEC/ACC
Detailed Cost Estimate of Madrasa Babo Khwaza Khela District Swat

S.NO Description Unit Quantity Rate Amount (Rs)

1 Excavation cft 7236 8.26 59,759

2 Stone cft 4482 25 112,050

3 Cement bags 1670 1166 1,947,055

4 sand cft 4744 30 142,320

5 crush cft 6308 25 157,700

6 Steel 1/2" Kg 14,361 240 3,446,733

8 Bricks Nos 54642 13 710,346

9 Door & Windows Sft 741 658 487,578

10 Paint Sft 17,954 50 897,713

11 Terrazo Flooring cft 6,291 60 377,467

12 Marble Skirting sft 345 120 41,400

13 Labour Cost cft 4331 160 692,960

Total Material Cost +Labour Cost 9,073,080.32

Electricity 2% of Total Cost 181,461.61

Water Supply & Sanitary 3% of Total Cost 272,192.41

Net Total Cost 9,526,734


Detailed Cost Estimate of Madrasa Babo Khwaza Khela District Swat
Basement

S.NO Description Unit Quantity Rate Amount (Rs)

1 Cement bags 380 1166 443,042

2 sand cft 1075 30 32,250

3 crush cft 1960.86 25 49,022

4 Steel 1/2" Kg 4,325 240 1,037,934

5 Bricks Nos 4039.35 25 100,984

6 Door & Windows Sft 140 658 92,120

7 Paint Sft 4,208 50 210,400

8 Marble on Floor Sft 685 60 41,120

9 Tile sft 1,740 800 1,392,000

10 Marble Skirting sft 146 120 17,518

11 Labour Cost cft 1314.9 160 210,384

Total Material Cost +Labour Cost 3,626,772.63

Electricity 2% of Total Cost 72,535.45

Water Supply & Sanitary 3% of Total Cost 108,803.18

Net Total Cost 3,808,111


MAIN SUMMARY GROUND FLOOR
Religious Building

Material
Labour Cost Material Cost Total Amount
Sr. No Description Qty Remarks
Cement Sand Crush Steel (Rs) (Rs) (Rs)
(Bags) Cft Cft Kg
1 Excavation - - - - - 108,540
2 Lean Concrete 1:4:8 under foundations - - - - -
3 RCC in Foundation - - - -
4 Lintel Beams - - - -
5 Roof beams 685.5 122 310 620
6 Stair 53.9 10 25 50
7 Slab 657.4 116 290 580
8 Columns Concrete 0.0 - - -
9 Steel 4324.7 4,325
10 Stone Masonary in Foundation -
11 Brick masonry 285.00 15 90
1/2" thick cement sand plaster in (1:2)
12 2,234.86 35 100
cement, sand
13 PCC 1:2:4 under the floor with sand 436.00 80 200 400
Providing and laying 3/4" thick Terrazzo
14 1,362.53
Flooring in grey cement (1:2)
15 Marble Skirting 145.98
16 3 x Coats of Plastic Emulsion paint 3,208.44
17 Door -
18 Window -
NET TOTAL 363 940 1,740 4,325 - - - -
Material Rate
Amount of Material
10 Add 5% extra contengencies
11 NET TOTAL AMOUNT
SUMMARY
CEMENT CONSUMPTION
A3 +A2 Class Qty
1:1.2:2.885 A-3 3000PSi

Concrete (1:2:4) Ratio


Concrete 1+1.2+2.688
Material in (M3) 5247.62
1 Dry Material 1.54
Dry Material in (M3) 1
Cement (Bags) 1
Sand 1.2
Crush 2.885

A1 Class Qty
1:1.2:2.885 A-3 3000PSi

Concrete (1:2:4) Ratio


Concrete 1+2+4
Material in (M3) 1.00
1 Dry Material 1.54
Dry Material in (M3) 1
Cement (Bags) 1
Sand 1.79
Crush 3.5

CLASS B CONC Class Qty


1:1.2:2.885 A-3 3000PSi

Concrete (1:2:4) Ratio


Concrete 1+2.83+3.5
Material in (M3) 642.80
1
1 Dry Material 1.54
Dry Material in (M3) 1
Cement (Bags) 1
Sand 2.83
Crush 3.5

LEAN CONC Class Qty


1:1.2:2.885 A-3 3000PSi

Concrete (1:2:4) Ratio


Concrete 1+3+5.76
Material in (M3) 39.20
1 Dry Material 1.54
Dry Material in (M3) 1
Cement (Bags) 1
Sand 3.00
Crush 5.779
UMMARY
CONSUMPTION
2 Class Qty 15.400

Sum of Ratio Factor Material


4.89

8,081.34
8,081.34
1,653.00 0.035 47228.48
1,983.60 1983.6 70060.60902
4,768.90 4768.9 168437.3809

Class Qty

Sum of Ratio Factor Material


7.00 68.6

2
2
0 0.035 6
0 0 14
1 1 27

CONC Class Qty

Sum of Ratio Factor Material


7.33
989.92
989.92
135.05 0.035 3858.58
382.19 382.2 13499.01974
472.68 472.7 16694.90074

ONC Class Qty

Sum of Ratio Factor Material


9.78

60.37
60.37
6.17 0.035 176.38 51,269.71
18.52 18.5 654.1152756
35.68 35.7 1260.044059
Lean Conc 39.35
#VALUE! Bed 37.8
#VALUE! Wall & slab 132.7

3503.030451227 73,563.64 103,299.79


8421.869043159 176,859.25 214,593.19

137.2
98
235.2 0.252
227.7912 29.4
7.4088 9.8
0.6937762788 14.57 14,875.36
1.35982 28.56 18,881.25

51269.71
674.9509869266 14,173.97
834.745036835 17,529.65

#VALUE!
#VALUE!

2563.485735239 53,833.20
32.70576377953 686.82 668 0.804808194
63.00220296063 1,323.05 1287 1.26323892
#VALUE!
#VALUE! 62.2900
#VALUE! 144.5350
522.2767
MAIN SUMMARY BASEMENT +GROUND FLOOR +FIRST FLOOR
Religious Building

Sr. No Description Amount Remarks

1 Structural Works Basement 1,683,919


2 Structural Works Ground Floor 3,935,922
3 Structural Works First Floor 5,591,395
4 Architectural Works Basement 616,520
5 Architectural Works Ground Floor 4,818,614

6 Architectural Works First Floor 4,393,582

7 Total cost of construction 21,039,951

8 Water supply & sanitary 3% of total cost 631,199

9 Electrical work 4% of total cost 841,598

10 TOTAL AMOUNT 22,512,748

11 Add 5% extra contengencies 1,125,637

12 NET TOTAL AMOUNT 23,638,385


MAIN SUMMARY GROUND FLOOR
Religious Building

Material
Labour Cost Material Cost Total Amount
Sr. No Description Qty Remarks
Cement Sand Crush Steel (Rs) (Rs) (Rs)
(Bags) Cft Cft Kg
1 Excavation 7,236.00 - - - - 108,540
2 Lean Concrete 1:4:8 under foundations 416.13 39 197 394 -
3 RCC in Foundation 272.00 48 120 239
4 Lintel Beams 445.5 78 196 392
5 Roof beams 511.9 90 225 450
6 Stair 56.9 10 25 50
7 Slab 2165.5 381 953 1,906
8 Columns Concrete 1037.3 183 456 913
9 Steel 14361.4 14,361
10 Stone Masonary in Foundation 4,482.00
11 Brick masonry 3,902.66 187 937
1/2" thick cement sand plaster in (1:2)
12 18,503.15 261 653
cement, sand
13 PCC 1:2:4 under the floor with sand 2,231.50 392 982 1,964
Providing and laying 3/4" thick Terrazzo
14 6,291.12
Flooring in grey cement (1:2)
15 Marble Skirting 690.34
16 3 x Coats of Plastic Emulsion paint 17,954.26
17 Door 178.50
18 Window 562.28
NET TOTAL 1,670 4,744 6,308 14,361 - - - -
Material Rate
Amount of Material
10 Add 5% extra contengencies
11 NET TOTAL AMOUNT
MAIN SUMMARY GROUND FLOOR
Religious Building

RCC in Columns
Excavation Lean Concrete Lintel Beams Roof beams Stair Slab Steel
Foundation Concrete
Sr. No Description Qty

1 Excavation 7,236.00
2 Lean Concrete 1:4:8 under foundations 416.13
3 RCC in Foundation 272.00
4 Lintel Beams 445.5
5 Roof beams 511.9
6 Stair 56.9
7 Slab 2165.5
8 Columns Concrete 1037.3
9 Steel 14361.4
10 Stone Masonary in Foundation 4,482.00
11 Brick masonry 3,902.66
1/2" thick cement sand plaster in (1:6)
12 18,503.15
cement, sand
13 PCC 1:2:4 under the floor with sand 2,231.50
Providing and laying 3/4" thick Terrazzo
14 6,291.12
Flooring in grey cement (1:2)
15 Marble Skirting 690.34
16 3 x Coats of Plastic Emulsion paint 17,954.26
17 Door 178.50
18 Window 562.28
NET TOTAL
Material Rate

10 Add 5% extra contengencies


11 NET TOTAL AMOUNT
ABSTRACT OF COST GROUND FLOOR
Religious Building
Ser Description Quantity Rate (Rs) Unit Amount (Rs)

1 STRUCTURAL WORKS:
1.01 b Excavation 7236 15.00 Cft 108,540
1.02 Lean Concrete 416 150.00 Cft 62,419
1.03 1:4:8
RCC inunder 272 280.00 Cft 76,160
1.04 foundations
Foundation
RCC in Super
a Structure
Plinth Beams - 320.00 Cft -
b Lintel Beams 446 280.00 Cft 124,743
c Roof beams 512 280.00 Cft 143,318
d Stair 57 280.00 Cft 15,945
e Slab 2166 280.00 Cft 606,340
1.05 Columns 1037 230.00 Cft 238,568
1.06 Concrete
Steel 14361 225.00 Kg 3,231,312
Total (Structural Works) 3,990,202
ABSTRACT OF COST GROUND FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2 ARCHITECTURAL WORKS:
2.01 Stone Masonary in Foundation 4,482 120 Cft 537,840
2.02 Brick masonry 3,903 220 Cft 858,586
2.03 1/2" thick cement sand plaster in (1:6)
cement, sand 18,503 40 Sft 740,126
2.04 PCC 1:2:4 under the floor with sand 2,232 180 Cft 401,670
2.05 Providing and laying 3/4" thick Terrazzo
Flooring in grey cement (1:2) 6,291 120 Sft 754,934
2.06 Marble Skirting 690 150 Rft 103,551
2.07 3 x Coats of Plastic Emulsion paint 17,954 40 Sft 718,170
2.08 Door 179 950 Sft 169,575
2.09 Window 562 950 Sft 534,161
Total (Architectural Works) 4,818,614
SUMMARY BASEMENT
Religious Building

Sr. No Description Amount Remarks

1 Structural Works (a) 1,683,919


2 Architectural Works 616,520

3 Total cost of construction 2,300,439

4 Water supply & sanitary 3% of total cost 69,013

5 Electrical work 4% of total cost 92,018

6 TOTAL AMOUNT 2,461,470

7 Add 5% extra contengencies 123,073

8 NET TOTAL AMOUNT 2,584,543


SUMMARY GROUND FLOOR
Religious Building

Sr. No Description Amount Remarks

1 Structural Works (a) 3,990,202


2 Architectural Works 4,818,614

3 Total cost of construction 8,808,816

4 Water supply & sanitary 3% of total cost 264,264

5 Electrical work 2% of total cost 176,176

6 TOTAL AMOUNT 9,249,256

7 Add 3% extra contengencies 277,478

8 NET TOTAL AMOUNT 9,526,734


SUMMARY FIRST FLOOR
Religious Building

Sr. No Description Amount Remarks

1 Structural Works (a) 5,591,395


2 Architectural Works 4,393,582

3 Total cost of construction 9,984,977

4 Water supply & sanitary 3% of total cost 299,549

5 Electrical work 4% of total cost 399,399

6 TOTAL AMOUNT 10,683,925

7 Add 5% extra contengencies 534,196

8 NET TOTAL AMOUNT 11,218,121


ABSTRACT OF COST GROUND FLOOR +FIRST FLOOR+BASEMENT
Religious Building

Description Quantity Rate (Rs) Unit Amount (Rs)


1 STRUCTURAL WORKS:
1.01 b Excavation of foundations etc in all kinds/type of soil up to any depth including excavation
in all types of hard strata like concrete, conglomerate, rock etc soil including back filling
with excavated soil,Compacted Earth 95% Modified AASHTO Compaction in 6" th. Layers
in depressions, around foundations including disposal of surplus earth, cutting and
removing all the growth, trees, bushes, striping, hard standing and disposal as directed (all
lead and lift) complete etc as per instructions of Engineer In charge.

7236 15.00 Cft 108,540


1.02 Providing, mixing, laying and compacting cement concrete 1:4:8 under foundations, at any
elevation with sand (from approved attached sources) and crush (from approved attached
sources) of size 3/4" and down including curing and form work etc, all as per drawings,
specifications complete as per instructions of Engineer In charge. 416 180.00 Cft 74,903
1.03 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Foundation using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 3000 psi at 28 days, in the RCC works as shown on drawings ,
including the cost of form work etc but excluding the cost of reinforcing steel as per
drawings specifications and as per instructions of Engineer In charge.

272 350.00 Cft 95,200


1.04 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in following works using crush(from approved attached sources)of required
size (1/2" and down) and sand (from approved attached sources) with minimum
compressive cylinder strength of 3000 psi at 28 days, in the RCC works as shown on
drawings at any height/floor, including the cost of form work but excluding the cost of
reinforcing steel all as per drawings specifications and as per instructions of Engineer In
charge.
0
a Plinth Beams 686 320.00 Cft 219,363
b Lintel Beams 837 350.00 Cft 293,076
c Roof beams 1024 350.00 Cft 358,295
d Stair 168 350.00 Cft 58,720
e Slab 7811 390.00 Cft 3,046,431
1.05 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Coloumns using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 4000 psi at 28 days, in the RCC works as shown on drawings at any
height/floor, including the cost of form work but excluding the cost of reinforcing steel all as
per drawings specifications complete and as per instructions of Engineer In charge.

1769 450.00 Cft 795,825


1.06 Supply, cutting, bending, binding and fixing in position grade 40 high yield deformed steel
reinforcement bars conforming to ASTM-A-615 with minimum yield stress of 40,000 psi at
any height/floor, including the cost of binding wire of 16 gauge, unspecified overlaps, (not
shown in drawings) wastage, rolling margin, concrete cover blocks, removal of rust from
bars if any etc, complete in all respects as per drawings, specifications and to the approval
of the Engineer In charge (Spacer bars, un-specified laps and chairs will not be paid).
Complete etc as directed and as per instructions of Engineer In charge.

29524 275.00 Kg 8,119,193


Total (Structural Works) 13,169,545
ABSTRACT OF COST BASMENT
Religious Building

Description Quantity Rate (Rs) Unit Amount (Rs)


1 STRUCTURAL WORKS:
1.01 b Excavation of foundations etc in all kinds/type of soil up to any depth including excavation
in all types of hard strata like concrete, conglomerate, rock etc soil including back filling
with excavated soil,Compacted Earth 95% Modified AASHTO Compaction in 6" th. Layers
in depressions, around foundations including disposal of surplus earth, cutting and
removing all the growth, trees, bushes, striping, hard standing and disposal as directed (all
lead and lift) complete etc as per instructions of Engineer In charge.

- 15.00 Cft -
1.02 Providing, mixing, laying and compacting cement concrete 1:4:8 under foundations, at any
elevation with sand (from approved attached sources) and crush (from approved attached
sources) of size 3/4" and down including curing and form work etc, all as per drawings,
specifications complete as per instructions of Engineer In charge.
- 180.00 Cft -
1.03 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Foundation using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 3000 psi at 28 days, in the RCC works as shown on drawings ,
including the cost of form work etc but excluding the cost of reinforcing steel as per
drawings specifications and as per instructions of Engineer In charge.

- 350.00 Cft -
1.04 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in following works using crush(from approved attached sources)of required
size (1/2" and down) and sand (from approved attached sources) with minimum
compressive cylinder strength of 3000 psi at 28 days, in the RCC works as shown on
drawings at any height/floor, including the cost of form work but excluding the cost of
reinforcing steel all as per drawings specifications and as per instructions of Engineer In
charge.

a Plinth Beams 686 320.00 Cft 219,363


b Lintel Beams - 350.00 Cft -
c Roof beams - 350.00 Cft -
d Stair 54 350.00 Cft 18,859
e Slab 657 390.00 Cft 256,398
1.05 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Coloumns using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 4000 psi at 28 days, in the RCC works as shown on drawings at any
height/floor, including the cost of form work but excluding the cost of reinforcing steel all as
per drawings specifications complete and as per instructions of Engineer In charge.

- 450.00 Cft -
1.06 Supply, cutting, bending, binding and fixing in position grade 40 high yield deformed steel
reinforcement bars conforming to ASTM-A-615 with minimum yield stress of 40,000 psi at
any height/floor, including the cost of binding wire of 16 gauge, unspecified overlaps, (not
shown in drawings) wastage, rolling margin, concrete cover blocks, removal of rust from
bars if any etc, complete in all respects as per drawings, specifications and to the approval
of the Engineer In charge (Spacer bars, un-specified laps and chairs will not be paid).
Complete etc as directed and as per instructions of Engineer In charge.

4325 275.00 Kg 1,189,299


Total (Structural Works) 1,683,919
ABSTRACT OF COST GROUND FLOOR
Religious Building

Description Quantity Rate (Rs) Unit Amount (Rs)


1 STRUCTURAL WORKS:
1.01 b Excavation of foundations etc in all kinds/type of soil up to any depth including excavation
in all types of hard strata like concrete, conglomerate, rock etc soil including back filling
with excavated soil,Compacted Earth 95% Modified AASHTO Compaction in 6" th. Layers
in depressions, around foundations including disposal of surplus earth, cutting and
removing all the growth, trees, bushes, striping, hard standing and disposal as directed (all
lead and lift) complete etc as per instructions of Engineer In charge.

7236 15.00 Cft 108,540


1.02 Providing, mixing, laying and compacting cement concrete 1:4:8 under foundations, at any
elevation with sand (from approved attached sources) and crush (from approved attached
sources) of size 3/4" and down including curing and form work etc, all as per drawings,
specifications complete as per instructions of Engineer In charge.
416 180.00 Cft 74,903
1.03 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having 272 350.00 Cft 95,200
1.04 design mixmixing,
Providing, in Foundation using crush
laying, vibrating (from approved
and curing attached
reinforcement sources)
cement of required
concrete size
RCC having
design mix in following works using crush(from approved attached sources)of required
size (1/2" and down) and sand (from approved attached sources) with minimum
compressive cylinder strength of 3000 psi at 28 days, in the RCC works as shown on
drawings at any height/floor, including the cost of form work but excluding the cost of
reinforcing steel all as per drawings specifications and as per instructions of Engineer In
charge.

a Plinth Beams - 320.00 Cft -


b Lintel Beams 446 320.00 Cft 142,563
c Roof beams 512 320.00 Cft 163,792
d Stair 57 320.00 Cft 18,222
e Slab 2166 280.00 Cft 606,340
1.05 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Coloumns using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 4000 psi at 28 days, in the RCC works as shown on drawings at any
height/floor, including the cost of form work but excluding the cost of reinforcing steel all as
per drawings specifications complete and as per instructions of Engineer In charge.

1037 230.00 Cft 238,568


1.06 Supply, cutting, bending, binding and fixing in position grade 40 high yield deformed steel
reinforcement bars conforming to ASTM-A-615 with minimum yield stress of 40,000 psi at
any height/floor, including the cost of binding wire of 16 gauge, unspecified overlaps, (not
shown in drawings) wastage, rolling margin, concrete cover blocks, removal of rust from
bars if any etc, complete in all respects as per drawings, specifications and to the approval
of the Engineer In charge (Spacer bars, un-specified laps and chairs will not be paid).
Complete etc as directed and as per instructions of Engineer In charge.

14361 225.00 Kg 3,231,225


Total (Structural Works) 3,935,922
ABSTRACT OF COST FIRST FLOOR
Religious Building

Description Quantity Rate (Rs) Unit Amount (Rs)


1 STRUCTURAL WORKS:
1.01 b Excavation of foundations etc in all kinds/type of soil up to any depth including excavation
in all types of hard strata like concrete, conglomerate, rock etc soil including back filling
with excavated soil,Compacted Earth 95% Modified AASHTO Compaction in 6" th. Layers
in depressions, around foundations including disposal of surplus earth, cutting and
removing all the growth, trees, bushes, striping, hard standing and disposal as directed (all
lead and lift) complete etc as per instructions of Engineer In charge.

- 15.00 Cft -
1.02 Providing, mixing, laying and compacting cement concrete 1:4:8 under foundations, at any
elevation with sand (from approved attached sources) and crush (from approved attached
sources) of size 3/4" and down including curing and form work etc, all as per drawings,
specifications complete as per instructions of Engineer In charge. - 180.00 Cft -
1.03 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Foundation using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 3000 psi at 28 days, in the RCC works as shown on drawings ,
including the cost of form work etc but excluding the cost of reinforcing steel as per
drawings specifications and as per instructions of Engineer In charge.

- 350.00 Cft -
1.04 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in following works using crush(from approved attached sources)of required
size (1/2" and down) and sand (from approved attached sources) with minimum
compressive cylinder strength of 3000 psi at 28 days, in the RCC works as shown on
drawings at any height/floor, including the cost of form work but excluding the cost of
reinforcing steel all as per drawings specifications and as per instructions of Engineer In
charge.

a Plinth Beams - 320.00 Cft -


b Lintel Beams 392 350.00 Cft 137,148
c Roof beams 512 350.00 Cft 179,148
d Stair 57 350.00 Cft 19,931
e Slab 4988 390.00 Cft 1,945,488
1.05 Providing, mixing, laying, vibrating and curing reinforcement cement concrete RCC having
design mix in Coloumns using crush (from approved attached sources) of required size
(1/2" and down) and sand (from approved attached sources) with minimum compressive
cylinder strength of 4000 psi at 28 days, in the RCC works as shown on drawings at any
height/floor, including the cost of form work but excluding the cost of reinforcing steel all as
per drawings specifications complete and as per instructions of Engineer In charge.

731 450.00 Cft 329,063


1.06 Supply, cutting, bending, binding and fixing in position grade 40 high yield deformed steel
reinforcement bars conforming to ASTM-A-615 with minimum yield stress of 40,000 psi at
any height/floor, including the cost of binding wire of 16 gauge, unspecified overlaps, (not
shown in drawings) wastage, rolling margin, concrete cover blocks, removal of rust from
bars if any etc, complete in all respects as per drawings, specifications and to the approval
of the Engineer In charge (Spacer bars, un-specified laps and chairs will not be paid).
Complete etc as directed and as per instructions of Engineer In charge.

10839 275.00 Kg 2,980,619


Total (Structural Works) 5,591,395
ABSTRACT OF COST BASEMENT+ GROUND FLOOR +FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2 ARCHITECTURAL WORKS:
2.01 Providing and laying stone masonry for walls in
Foundation at any height/floor set in cement sand
mortar 1:6 including making openings etc as
shown on drawings i/c cost of all materials,
scaffolding, labour, curing, cleaning, raking out
joints etc, all as per drawings, specifications,
complete and as per instructions of Engineer
incharge.
4,482.00 200 Cft 896,400
2.02 Providing and laying Brick masonry for walls any
Thickness in Superstructure at any height/floor set
in cement sand mortar 1:6 including making
openings etc as shown on drawings i/c cost of all
materials, scaffolding, labour, curing, cleaning,
raking out joints etc, all as per drawings,
specifications, complete and as per instructions of
Engineer incharge.

7,040.33 370 Cft 2,604,920


2.03 Providing, mixing and applying 1/2" thick cement
sand plaster in (1:6) cement, sand (as per
approved source of manufacturers list) mortar on
internal surfaces of straight or curved walls etc at
any height including chipping of concrete surfaces,
scaffolding, curing, grooves, chicken mesh at
concrete-masonary joints etc all as per drawings,
specifications. Complete and as per instruction of
Engineer In charge.
34,166.78 50 Sft 1,708,339
2.04 Providing and laying PCC 1:2:4 under the floor with
sand (as per approved source of manufacturers
list) and crush (as per approved source of
manufacturers list) of size 1/2" and down
including curing and form work etc all as per
drawings , specification complete and as per
instructions of Engineer incharge.
2,667.65 220 Cft 586,882
ABSTRACT OF COST BASEMENT+ GROUND FLOOR +FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.05 Providing and laying 3/4" thick Terrazzo Flooring in
grey cement (1:2) in pannels not exceeding 16 Sft
including grinding, rubbing and polishing complete
mixed with pigment and marble chips of approved
size, chemically polished, complete etc as directed
and as per instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2" wide Marble
Divider Strips in panels)
10,980.56 200 Sft 2,196,112
2.06 Providing and laying 1/2" thick (as per approved
source of manufacturers list) Marble Skirting of
approved shade of approved size 24" long and 4"
wide or otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge

1,436.75 150 Rft 215,513


2.07 Providing and applying 3 x Coats of Plastic
Emulsion paint ICI/Berger/Nippon make at any
height/floor on internal walls /ceiling, including
preparation of surfaces, putty filling
(Berger/ICI/Nippon make) cost of all materials
labour and scaffolding etc, complete as per
specifacation and as per instructions of Engineer In
charge.
35,294.92 50 Sft 1,764,746
2.08 Providing, making and fixing in position single or
double leaf solid wooden panelled Door shutter
with first class deodar/Oak wood frame of 2"
thickness and 5" wide at top and sides, 2-1/2" wide
middle strips and 9: wide bottom, and 5mm thick
imported tinted glass with frosted pattern, or as per
approved design with deodar/Oak wood beading
both sides, and first class deodar wood/Oak
chowkat size 2-1/2"x6" fixed with wooden partitions
or as shown on drawings, i/e glue, nailing, and all
hardware of approved best quality locks with 3
keys, hinges, handles, door closers, door stopper
etc, and Lacquer polishing ICI of Berger (3 coats)
of approved shade to all wooden surfaces.

357.00 1700 Sft 606,900


ABSTRACT OF COST BASEMENT+ GROUND FLOOR +FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.09 Providing and fixing fully glazed Natural Colour/or
any shade/Coulour as approved by engineer
incharge anodized Aluminium Fixed/Sliding
Windows Section 100mm x 30mm (Deluxe Model)
at any height/floor using high strength aluminium
alloy extruded sections not less than 2 mm
thickness of Pak cable/Prime Aluminium/Chawla
of approved shade, openable panels wire gauzed
with specified aluminium screen, galvanized steel
screws, rubber vinyl brush type imported gasket
seal and all other approved fittings including 5mm
thick tinted glass. The work to be carried out
through reputed manufacturer/fabricator. All
aluminium surfaces shall be anodized champagne
colour finish and shop protected by lacquer
applications (15 micron anodic film). All joints
between frame and wall edge shall be sealed with
transparent Silicon, including the cost of extra
provision of holes etc for the additional drainage
arrangements in the bottom section all as per
drawings, specifications (Shop drawings to be got
approved by the contractor before execution).
Complete etc as per instructions of Engineer
Incharge .

919.28 691 Sft 635,219


2.1 Providing,Cutting,Fabricating and fixing in Position
Hand Rail 2.5' High at Ramp/Stair Area any height
any Floor consisiting of 2"x2" Dewdor Wood Hand
Rail Top and vertical posts 1" x1" MS 16 Gauge
Pipe to be welded with 1/8" MS Plates 3"x6"x3/16"
fixed to Floor with RawalBolts including 3 x coats
of Sythetic Enamel Paint in Addition to 1 x coats of
red Oxide grinding and cleaning etc as as directed
and as per instructions of Engineer incharge #VALUE! 1400 Sft #VALUE!
Total (Architectural Works) #VALUE!
ABSTRACT OF COST BASEMENT
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2 ARCHITECTURAL WORKS:
2.01 Providing and laying stone masonry for walls in
Foundation at any height/floor set in cement sand
mortar 1:6 including making openings etc as
shown on drawings i/c cost of all materials,
scaffolding, labour, curing, cleaning, raking out
joints etc, all as per drawings, specifications,
complete and as per instructions of Engineer
incharge.
- 200 Cft -
2.02 Providing and laying Brick masonry for walls any
Thickness in Superstructure at any height/floor set
in cement sand mortar 1:6 including making
openings etc as shown on drawings i/c cost of all
materials, scaffolding, labour, curing, cleaning,
raking out joints etc, all as per drawings,
specifications, complete and as per instructions of
Engineer incharge.

- 370 Cft -
2.03 Providing, mixing and applying 1/2" thick cement
sand plaster in (1:6) cement, sand (as per
approved source of manufacturers list) mortar on
internal surfaces of straight or curved walls etc at
any height including chipping of concrete surfaces,
scaffolding, curing, grooves, chicken mesh at
concrete-masonary joints etc all as per drawings,
specifications. Complete and as per instruction of
Engineer In charge.
1,314.9 50 Sft 65,743
2.04 Providing and laying PCC 1:2:4 under the floor with
sand (as per approved source of manufacturers
list) and crush (as per approved source of
manufacturers list) of size 1/2" and down
including curing and form work etc all as per
drawings , specification complete and as per
instructions of Engineer incharge.
436 220 Cft 95,952
ABSTRACT OF COST BASEMENT
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.05 Providing and laying 3/4" thick Terrazzo Flooring in
grey cement (1:2) in pannels not exceeding 16 Sft
including grinding, rubbing and polishing complete
mixed with pigment and marble chips of approved
size, chemically polished, complete etc as directed
and as per instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2" wide Marble
Divider Strips in panels)
1363 200 Sft 272,506
2.06 Providing and laying 1/2" thick (as per approved
source of manufacturers list) Marble Skirting of
approved shade of approved size 24" long and 4"
wide or otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge
146 150 Rft 21,897
2.07 Providing and applying 3 x Coats of Plastic
Emulsion paint ICI/Berger/Nippon make at any
height/floor on internal walls /ceiling, including
preparation of surfaces, putty filling
(Berger/ICI/Nippon make) cost of all materials
labour and scaffolding etc, complete as per
specifacation and as per instructions of Engineer In
charge.
3208 50 Sft 160,422
2.08 Providing, making and fixing in position single or
double leaf solid wooden panelled Door shutter
with first class deodar/Oak wood frame of 2"
thickness and 5" wide at top and sides, 2-1/2" wide
middle strips and 9: wide bottom, and 5mm thick
imported tinted glass with frosted pattern, or as per
approved design with deodar/Oak wood beading
both sides, and first class deodar wood/Oak
chowkat size 2-1/2"x6" fixed with wooden partitions
or as shown on drawings, i/e glue, nailing, and all
hardware of approved best quality locks with 3
keys, hinges, handles, door closers, door stopper - 1700 Sft -
etc, and Lacquer polishing ICI of Berger (3 coats)
ABSTRACT OF COST BASEMENT
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.09 Providing and fixing fully glazed Natural Colour/or
any shade/Coulour as approved by engineer
incharge anodized Aluminium Fixed/Sliding
Windows Section 100mm x 30mm (Deluxe Model)
at any height/floor using high strength aluminium
alloy extruded sections not less than 2 mm
thickness of Pak cable/Prime Aluminium/Chawla
of approved shade, openable panels wire gauzed
with specified aluminium screen, galvanized steel
screws, rubber vinyl brush type imported gasket
seal and all other approved fittings including 5mm
thick tinted glass. The work to be carried out
through reputed manufacturer/fabricator. All
aluminium surfaces shall be anodized champagne
colour finish and shop protected by lacquer
applications (15 micron anodic film). All joints - 1700 Sft -
2.1 Providing,Cutting,Fabricating and fixing in Position
Hand Rail 2.5' High at Ramp/Stair Area any height
any Floor consisiting of 2"x2" Dewdor Wood Hand
Rail Top and vertical posts 1" x1" MS 16 Gauge
Pipe to be welded with 1/8" MS Plates 3"x6"x3/16"
fixed to Floor with RawalBolts including 3 x coats
of Sythetic Enamel Paint in Addition to 1 x coats of
red Oxide grinding and cleaning etc as as directed
and as per instructions of Engineer incharge - 1400 Sft -
Total (Architectural Works) 616,520
ABSTRACT OF COST GROUND FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2 ARCHITECTURAL WORKS:
2.01 Providing and laying stone masonry for walls in
Foundation at any height/floor set in cement sand
mortar 1:6 including making openings etc as
shown on drawings i/c cost of all materials,
scaffolding, labour, curing, cleaning, raking out
joints etc, all as per drawings, specifications,
complete and as per instructions of Engineer
incharge.
4,482.00 150 Cft 672,300
2.02 Providing and laying Brick masonry for walls any
Thickness in Superstructure at any height/floor set
in cement sand mortar 1:6 including making
openings etc as shown on drawings i/c cost of all
materials, scaffolding, labour, curing, cleaning,
raking out joints etc, all as per drawings,
specifications, complete and as per instructions of
Engineer incharge.

3,902.66 220 Cft 858,586


2.03 Providing, mixing and applying 1/2" thick cement
sand plaster in (1:6) cement, sand (as per
approved source of manufacturers list) mortar on
internal surfaces of straight or curved walls etc at
any height including chipping of concrete surfaces,
scaffolding, curing, grooves, chicken mesh at
concrete-masonary joints etc all as per drawings,
specifications. Complete and as per instruction of
Engineer In charge.
18,785.4 40 Sft 751,418
2.04 Providing and laying PCC 1:2:4 under the floor with
sand (as per approved source of manufacturers
list) and crush (as per approved source of
manufacturers list) of size 1/2" and down
including curing and form work etc all as per
drawings , specification complete and as per
instructions of Engineer incharge.
2232 180 Cft 401,670
ABSTRACT OF COST GROUND FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.05 Providing and laying 3/4" thick Terrazzo Flooring in
grey cement (1:2) in pannels not exceeding 16 Sft
including grinding, rubbing and polishing complete
mixed with pigment and marble chips of approved
size, chemically polished, complete etc as directed
and as per instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2" wide Marble
Divider Strips in panels)
7232 120 Sft 867,783
2.06 Providing and laying 1/2" thick (as per approved
source of manufacturers list) Marble Skirting of
approved shade of approved size 24" long and 4"
wide or otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge
690 150 Rft 103,551
2.07 Providing and applying 3 x Coats of Plastic
Emulsion paint ICI/Berger/Nippon make at any
height/floor on internal walls /ceiling, including
preparation of surfaces, putty filling
(Berger/ICI/Nippon make) cost of all materials
labour and scaffolding etc, complete as per
specifacation and as per instructions of Engineer In
charge.
17954 40 Sft 718,170
2.08 Providing, making and fixing in position single or
double leaf solid wooden panelled Door shutter
with first class deodar/Oak wood frame of 2"
thickness and 5" wide at top and sides, 2-1/2" wide
middle strips and 9: wide bottom, and 5mm thick
imported tinted glass with frosted pattern, or as per
approved design with deodar/Oak wood beading
both sides, and first class deodar wood/Oak
chowkat size 2-1/2"x6" fixed with wooden partitions
or as shown on drawings, i/e glue, nailing, and all
hardware of approved best quality locks with 3
keys, hinges, handles, door closers, door stopper 179 1500 Sft 267,750
etc, and Lacquer polishing ICI of Berger (3 coats)
ABSTRACT OF COST GROUND FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.09 Providing and fixing fully glazed Natural Colour/or
any shade/Coulour as approved by engineer
incharge anodized Aluminium Fixed/Sliding
Windows Section 100mm x 30mm (Deluxe Model)
at any height/floor using high strength aluminium
alloy extruded sections not less than 2 mm
thickness of Pak cable/Prime Aluminium/Chawla
of approved shade, openable panels wire gauzed
with specified aluminium screen, galvanized steel
screws, rubber vinyl brush type imported gasket
seal and all other approved fittings including 5mm
thick tinted glass. The work to be carried out
through reputed manufacturer/fabricator. All
aluminium surfaces shall be anodized champagne
colour finish and shop protected by lacquer
applications (15 micron anodic film). All joints 562 1500 Sft 843,413
Total (Architectural Works) 4,641,228
ABSTRACT OF COST FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2 ARCHITECTURAL WORKS:
2.01 Providing and laying stone masonry for walls in
Foundation at any height/floor set in cement sand
mortar 1:6 including making openings etc as
shown on drawings i/c cost of all materials,
scaffolding, labour, curing, cleaning, raking out
joints etc, all as per drawings, specifications,
complete and as per instructions of Engineer
incharge.
- 200 Cft -
2.02 Providing and laying Brick masonry for walls any
Thickness in Superstructure at any height/floor set
in cement sand mortar 1:6 including making
openings etc as shown on drawings i/c cost of all
materials, scaffolding, labour, curing, cleaning,
raking out joints etc, all as per drawings,
specifications, complete and as per instructions of
Engineer incharge.

3,137.66 370 Cft 1,160,935


2.03 Providing, mixing and applying 1/2" thick cement
sand plaster in (1:6) cement, sand (as per
approved source of manufacturers list) mortar on
internal surfaces of straight or curved walls etc at
any height including chipping of concrete surfaces,
scaffolding, curing, grooves, chicken mesh at
concrete-masonary joints etc all as per drawings,
specifications. Complete and as per instruction of
Engineer In charge.
14,348.8 50 Sft 717,439
2.04 Providing and laying PCC 1:2:4 under the floor with
sand (as per approved source of manufacturers
list) and crush (as per approved source of
manufacturers list) of size 1/2" and down
including curing and form work etc all as per
drawings , specification complete and as per
instructions of Engineer incharge.
- 220 Cft -
ABSTRACT OF COST FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.05 Providing and laying 3/4" thick Terrazzo Flooring in
grey cement (1:2) in pannels not exceeding 16 Sft
including grinding, rubbing and polishing complete
mixed with pigment and marble chips of approved
size, chemically polished, complete etc as directed
and as per instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2" wide Marble
Divider Strips in panels)
3327 200 Sft 665,383
2.06 Providing and laying 1/2" thick (as per approved
source of manufacturers list) Marble Skirting of
approved shade of approved size 24" long and 4"
wide or otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge
600 150 Rft 90,065
2.07 Providing and applying 3 x Coats of Plastic
Emulsion paint ICI/Berger/Nippon make at any
height/floor on internal walls /ceiling, including
preparation of surfaces, putty filling
(Berger/ICI/Nippon make) cost of all materials
labour and scaffolding etc, complete as per
specifacation and as per instructions of Engineer In
charge.
14132 50 Sft 706,611
2.08 Providing, making and fixing in position single or
double leaf solid wooden panelled Door shutter
with first class deodar/Oak wood frame of 2"
thickness and 5" wide at top and sides, 2-1/2" wide
middle strips and 9: wide bottom, and 5mm thick
imported tinted glass with frosted pattern, or as per
approved design with deodar/Oak wood beading
both sides, and first class deodar wood/Oak
chowkat size 2-1/2"x6" fixed with wooden partitions
or as shown on drawings, i/e glue, nailing, and all
hardware of approved best quality locks with 3
keys, hinges, handles, door closers, door stopper
etc, and Lacquer polishing ICI of Berger (3 coats)
of approved shade to all wooden surfaces.

179 1700 Sft 303,450


ABSTRACT OF COST FIRST FLOOR
Religious Building

S/No Description Quantity Rate(Rs) Unit Amount(Rs)


2.09 Providing and fixing fully glazed Natural Colour/or
any shade/Coulour as approved by engineer
incharge anodized Aluminium Fixed/Sliding
Windows Section 100mm x 30mm (Deluxe Model)
at any height/floor using high strength aluminium
alloy extruded sections not less than 2 mm
thickness of Pak cable/Prime Aluminium/Chawla
of approved shade, openable panels wire gauzed
with specified aluminium screen, galvanized steel
screws, rubber vinyl brush type imported gasket
seal and all other approved fittings including 5mm
thick tinted glass. The work to be carried out
through reputed manufacturer/fabricator. All
aluminium surfaces shall be anodized champagne
colour finish and shop protected by lacquer
applications (15 micron anodic film). All joints
between frame and wall edge shall be sealed with
transparent Silicon, including the cost of extra
provision of holes etc for the additional drainage
arrangements in the bottom section all as per
drawings, specifications (Shop drawings to be got
approved by the contractor before execution).
Complete etc as per instructions of Engineer
Incharge .

357 691 Sft 246,687


2.1 Providing,Cutting,Fabricating and fixing in Position
Hand Rail 2.5' High at Ramp/Stair Area any height
any Floor consisiting of 2"x2" Dewdor Wood Hand
Rail Top and vertical posts 1" x1" MS 16 Gauge
Pipe to be welded with 1/8" MS Plates 3"x6"x3/16"
fixed to Floor with RawalBolts including 3 x coats
of Sythetic Enamel Paint in Addition to 1 x coats of
red Oxide grinding and cleaning etc as as directed
and as per instructions of Engineer incharge 535.50 1400 Sft 749,700
Total (Architectural Works) 4,393,582
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Excavation of Boundary wall

Excavation of foundations etc in all


kinds/type of soil up to any depth
including excavation in all types of hard
strata like concrete, conglomerate, rock
etc soil including back filling with
excavated soil,Compacted Earth 95%
Modified AASHTO Compaction in 6" th.
Layers in depressions, around
foundations including disposal of surplus
earth, cutting and removing all the
growth, trees, bushes, striping, hard
standing and disposal as directed (all
lead and lift) complete etc as per
instructions of Engineer In charge.

1 Long Wall of Boundary Wall 1 122.250 3.00 8.00 2,934.00 Cft

2 Short Wall of Boundary Wall 2 32.250 3.00 8.00 1,548.00 "

Total 4,482.00 Cft

Detailed Cost Estimate


Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Excavation of Boundary Wall Column

1 Column Long Wall 13 4.500 4.50 8.00 2,106.00 Cft

2 Column Short Wall 4 4.500 4.50 8.00 648.00 "

Total 2,754.00 Cft


Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Column base Concrete 1:4:8


1 Column Long Wall 13 4.000 4.00 0.50 104.00 Cft
2 Column Short Wall 4 4.000 4.00 0.50 32.00 "
Total 136.00 Cft

Detailed Cost Estimate


Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Wall Concrete 1:4:8

1 Long Wall of Boundary Wall 1 122.250 3.00 0.50 183.38 Cft


2 Short Wall of Boundary Wall 2 32.250 3.00 0.50 96.75 "
Total 280.13 Cft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:2:4 (Column Base)


Providing, mixing, laying, vibrating and
curing reinforcement cement concrete
RCC having design mix in Foundation
using crush (from approved attached
sources) of required size (1/2" and down)
and sand (from approved attached
sources) with minimum compressive
cylinder strength of 3000 psi at 28 days,
in the RCC works as shown on drawings ,
including the cost of form work etc but
excluding the cost of reinforcing steel as
per drawings specifications and as per
instructions of Engineer In charge.

1 Column Base Long Wall 13 4.000 4.00 1.00 208.00 Cft

2 Column Base Short Wall 4 4.000 4.00 1.00 64.00 "

Total 272.00 Cft


Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:2:4 (Plinth Beams)


Providing, mixing, laying, vibrating
and curing reinforcement cement
concrete RCC having design mix in
following works using crush(from
approved attached sources)of
required size (1/2" and down) and
sand (from approved attached
sources) with minimum compressive
cylinder strength of 3000 psi at 28
days, in the RCC works as shown on
drawings at any height/floor,
including the cost of form work but
excluding the cost of reinforcing steel
all as per drawings specifications and
as per instructions of Engineer In
charge.

1 Plinth Beam Basement Long Wall 4 120.000 1.00 1.00 480.00 Cft

2 Plinth Beam Basement Short Wall 2 62.330 1.00 1.00 124.66 "

3 Plinth Beam Room 5 16.170 1.00 1.00 80.85 "

Total 685.51 Cft

Detailed Cost Estimate


Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:2:4 (Lintel Beams)

1 Lintel Beam Long Wall 2 120.000 1.00 1.00 240.00 Cft

2 Lintel Beam Short Wall 2 62.330 1.00 1.00 124.66 "


3 Lintel Beam Inner Room 5 16.170 1.00 1.00 80.85 "

Total 445.51 Cft


Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:2:4 (Roof Beams)

1 Roof Beam Beam Long Wall 3 120.000 1.00 1.00 360.00 Cft
2 Roof Beam Short Wall 2 35.500 1.00 1.00 71.00 "

3 Roof Beam Inner Room 5 16.170 1.00 1.00 80.85 "

Total 511.85 Cft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 (Lintel Beams) 1st Floor
1 Lintel Beam Long Wall 2 120.000 1.00 1.00 240.00 Cft
2 Lintel Beam Short Wall 2 35.500 1.00 1.00 71.00 "
3 Lintel Beam Inner Room 5 16.170 1.00 1.00 80.85 "
Total 391.85 Cft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 (Roof Beams) Ist Floor
1 Roof Beam Beam Long Wall 3 120.000 1.00 1.00 360.00 Cft

2 Roof Beam Short Wall 2 35.500 1.00 1.00 71.00 "

3 Roof Beam Inner Room 5 16.170 1.00 1.00 80.85 "


Total 511.85 Cft
Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Stair
1 Steps 22 3.500 1.000 0.50 19.25 "
2 Landing 1 3.500 3.500 0.50 3.06 "
3 waist Slab 1 22.000 3.50 0.41 31.57 "
Total 53.88 CFT

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Stair Ground Floor
1 Steps 22 3.500 1.000 0.50 19.25 "
2 Landing 2 3.500 3.500 0.50 6.13 "
3 waist Slab 1 22.000 3.50 0.41 31.57 "
Total 56.94 CFT

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Stair Fist Floor
1 Steps 22 3.500 1.000 0.50 19.25 "
2 Landing 2 3.500 3.500 0.50 6.13 "
3 waist Slab 1 22.000 3.50 0.41 31.57 "
Total 56.94 CFT

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 Slab(Ground floor)
1 Basement Slab 1 1 32.330 40.67 0.50 657.43 cft
2 Ground Floor Slab 2 1 122.000 35.50 0.50 2,165.50 cft
3 First Floor Slab 3 1 122.000 35.50 0.50 2,165.50 cft
Total Qty 4,988.43 cft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 Slab(First floor)
1 Basement Slab 1 1 32.330 40.67 0.50 657.43 cft
2 Ground Floor Slab 2 1 122.000 35.50 0.50 2,165.50 cft
3 First Floor Slab 3 1 122.000 35.50 0.50 2,165.50 cft
Total 4,988.43 cft
Detailed Cost Estimate
Residential Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Columns
Providing, mixing, laying, vibrating
and curing reinforcement cement
concrete RCC having design mix in
Coloumns using crush (from
approved attached sources) of
required size (1/2" and down) and
sand (from approved attached
sources) with minimum compressive
cylinder strength of 4000 psi at 28
days, in the RCC works as shown on
drawings at any height/floor, including
the cost of form work but excluding
the cost of reinforcing steel all as per
drawings specifications complete and
as per instructions of Engineer In
charge.

Detailed Cost Estimate


Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:2:4 long column )


1 Column Ground Floor C1 25 13.000 1.50 1.50 731.25 Cft
Total 731.25 Cft
Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 short column )
1 Boundary Wall Column Long Wall C1 13 8.000 1.50 1.50 234.00 Cft
2 Boundary Wall Column Short Wall C1 4 8.000 1.50 1.50 72.00 "
Total 306.00 Cft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Concrete 1:2:4 long column 1st Floor)
2 Column First Floor C1 25 13.000 1.50 1.50 731.25 "
Total 731.25 cft
Detailed Cost Estimate
Religious Building
NO of MEASUREMENTS
SR. NOS of
DESCRIPTION column QUANTITY UNIT
No bars LENGTH DIA UNIT/WT
Base

Steel 40 Grade column base

Providing laying Steel 40 grade


completet as directed by Engineer ft/KG
Incharge

1 Boundary Wall Footing F1 main bars 36 17 10.000 1/2" 0.30 1,850.69 Kg

Total 1,850.69 Kg

Detailed Cost Estimate


Religious Building

SR. NOS of NO of MEASUREMENTS


DESCRIPTION QUANTITY UNIT
No bars column
LENGTH DIA UNIT/WT
Steel 40 Grade short column
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
1 Boundary Wall short column C1 10 17 12.500 5/8" 0.47 1,004.06 Kg
2 Boundary Wall short column C1 Stirrups 17 17 3.500 3/8" 0.17 172.06 Kg
Total 3/8" 172.06 Kg
Total 1/2" 1,004.06 Kg

Detailed Cost Estimate


Religious Building
MEASUREMENTS QUANTITY
SR. NOS of NO of
DESCRIPTION UNIT
No bars column LENGTH DIA UNIT/WT

Steel 40 Grade Longcolumn


Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge

1 Long column C1 10 25 17.000 1/2" 0.30 1,285.20 Kg


2 Long column C1 Stirrups 27 25 3.500 3/8" 0.17 401.86 Kg
Total 3/8" 401.86 Kg
Total 5/8" 1,285.20 Kg
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR. NOS of NO of
DESCRIPTION QUANTITY UNIT
No bars Beam LENGTH DIA UNIT/WT
Steel 40 Grade plinth beam
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
1 Plinth Beam Long Wall 8 4 126.000 1/2" 0.30 1,219.28 Kg
2 Plinth Beam Long Wall Stirrups 241 4 3.500 3/8" 0.17 573.92 Kg

3 Plinth Beam Short Wall 8 2 67.330 1/2" 0.30 325.77 Kg

4 Plinth Beam Short Wall Stirrups 125.66 2 3.500 3/8" 0.17 149.62 Kg

5 Plinth Beam Room 8 5 16.17 1/2" 0.30 195.59 Kg

6 Plinth Beam Room Stirrups 62 5 3.500 3/8" 0.17 184.56 Kg


Total 3/8" 908.10 Kg

Total1/2" 1,740.64 Kg

Detailed Cost Estimate


Religious Building
MEASUREMENTS
SR. NOS of NO of
DESCRIPTION QUANTITY UNIT
No bars Beam LENGTH DIA UNIT/WT

Steel 40 Grade Lintel beam


Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
1 Lintel Beam Long Wall 8 2 126.000 1/2" 0.30 609.64 Kg
2 Lintel Beam Long Wall Stirrups 241 2 3.500 3/8" 0.17 286.96 Kg
3 Lintel Beam Short Wall 8 2 67.330 1/2" 0.30 325.77 Kg
4 Lintel Beam Short Wall Stirrups 125.66 2 3.500 3/8" 0.17 149.62 Kg
5 Lintel Beam Room 8 5 16.17 1/2" 0.30 195.59 Kg
6 Lintel Beam Room Stirrups 62 5 3.500 3/8" 0.17 184.56 Kg

Total 3/8" 621.14 Kg

Total1/2" 1,131.00 Kg
Detailed Cost Estimate
Religious Building
MEASUREMENTS UNIT
SR. NOS of NO of
DESCRIPTION QUANTITY
No bars Beam LENGTH DIA UNIT/WT

Steel 40 Grade Roof beam


Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge

1 Roof Beam Long Wall 8 3 126.000 1/2" 0.30 914.46 Kg

2 Roof Beam Long Wall Stirrups 241 3 3.500 3/8" 0.17 430.44 Kg
3 Roof Beam Short Wall 8 2 35.500 1/2" 0.30 171.76 Kg
4 Roof Beam Short Wall Stirrups 72 2 3.500 3/8" 0.17 85.73 Kg
5 Roof Beam Room 8 5 16.17 1/2" 0.30 195.59 Kg
6 Roof Beam Room Stirrups 62 5 3.500 3/8" 0.17 184.56 Kg
Total 3/8" 700.73 Kg

Total1/2" 1,281.81 Kg

Detailed Cost Estimate


Religious Building
DESCRIPTION
SR. NOS of NO of MEASUREMENTS QUANTITY
UNIT
No bars column LENGTH DIA UNIT/WT
Steel 40 Grade Longcolumn 1st Floor
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
3 Long column C1 10 25 17.000 5/8" 0.30 1,285.20 Kg
4 Long column C1 Stirrups 27 25 3.500 3/8" 0.17 401.86 Kg

Total 3/8" 401.86 Kg


Total 5/8" 1,285.20 Kg
Detailed Cost Estimate
Religious Building
SR. NOS of Nos of MEASUREMENTS
DESCRIPTION QUANTITY UNIT
No bars beam LENGTH DIA UNIT/WT
Steel 40 Grade Lintel beam 1st Floor
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge

1 Lintel Beam Long Wall 8 2 126.000 1/2" 0.30 609.64 Kg

2 Lintel Beam Long Wall Stirrups 241 2 3.500 3/8" 0.17 286.96 Kg
3 Lintel Beam Short Wall 8 2 35.500 1/2" 0.30 171.76 Kg
4 Lintel Beam Short Wall Stirrups 72 2 3.500 3/8" 0.17 85.73 Kg
5 Lintel Beam Room 8 5 16.17 1/2" 0.30 195.59 Kg
6 Lintel Beam Room Stirrups 62 5 3.500 3/8" 0.17 184.56 Kg
Total 3/8" 557.25 Kg
Total1/2" 976.99 Kg
Detailed Cost Estimate
Religious Building
SR. NOS of Nos of MEASUREMENTS
DESCRIPTION QUANTITY UNIT
No bars beam LENGTH DIA UNIT/WT
Steel 40 Grade Roof beam 1st Floor
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
1 Roof Beam Long Wall 8 3 126.000 1/2" 0.30 914.46 Kg
2 Roof Beam Long Wall Stirrups 241 3 3.500 3/8" 0.17 430.44 Kg
3 Roof Beam Short Wall 8 2 35.500 1/2" 0.30 171.76 Kg
4 Roof Beam Short Wall Stirrups 72 2 3.500 3/8" 0.17 85.73 Kg
5 Roof Beam Room 8 5 16.17 1/2" 0.30 195.59 Kg
6 Roof Beam Room Stirrups 62 5 3.500 3/8" 0.17 184.56 Kg
Total 3/8" 700.73 Kg
Total1/2" 1,281.81 Kg
Detailed Cost Estimate
Religious Building
SR. NOS of MEASUREMENTS UNIT
DESCRIPTION nos QUANTITY
No bars LENGTH DIA UNIT/WT
Steel 40 Grade Slab Ground Floor
Providing laying Steel 40 grade
completet as directed by Engineer ft/KG
Incharge
1 Basement Slab 1 Main Bar 83 1 32.330 1/2" 0.30 811.46 Kg
2 Basement Slab 1 Distt Bar 67 1 42.670 1/2" 0.30 864.53 Kg
3 Ground Floor Slab 2 Main Bar 245 1 35.500 1/2" 0.30 2,630.12 Kg
4 Ground Slab 2 Distt Bar 72 1 138.000 1/2" 0.30 3,004.65 Kg
Total 1/2" 7,310.76 Kg
Detailed Cost Estimate
Religious Building
SR. NOS of MEASUREMENTS UNIT
DESCRIPTION nos QUANTITY
No bars LENGTH DIA UNIT/WT
Steel 40 Grade Slab Ist Floor

Providing laying Steel 40 grade


completet as directed by Engineer ft/KG
Incharge

1 Ground Floor Slab 2 Main Bar 245 1 35.500 1/2" 0.30 2,630.12 Kg
2 Ground Slab 2 Distt Bar 72 1 138.000 1/2" 0.30 3,004.65 Kg
Total 1/2" 5,634.77 Kg
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Stone Work under foundation


Providing and laying stone masonry for
walls in Foundation at any height/floor
set in cement sand mortar 1:6 including
making openings etc as shown on
drawings i/c cost of all materials,
scaffolding, labour, curing, cleaning,
raking out joints etc, all as per drawings,
specifications, complete and as per
instructions of Engineer incharge.

upto NGL

1 Long Wall of Boundary Wall 1 122.250 3.00 8.00 2,934.00 Cft

2 Short Wall of Boundary Wall 2 32.250 3.00 8.00 1,548.00 "

Total 4,482.00 Cft


Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Brick Work
Providing and laying Brick masonry for
walls any Thickness in Superstructure at
any height/floor set in cement sand
mortar 1:6 including making openings etc
as shown on drawings i/c cost of all
materials, scaffolding, labour, curing,
cleaning, raking out joints etc, all as per
drawings, specifications, complete and as
per instructions of Engineer incharge.

Brick Work upto lintel level

1 Roof Beam Beam Long Wall 3 120.000 0.75 8.50 2,295.00 Cft

2 Roof Beam Short Wall 2 35.500 0.75 13.00 692.25 "

3 Roof Beam Inner Room 5 16.170 0.75 13.00 788.29 "

Brick Work upto lintel level

4 Door D-2 6 3.500 0.75 8.50 133.88 "

5 Window W-1 7 6.000 0.75 6.00 189.00 "

Total Qty of Wall 3,775.54 "

D-1,D-2,D-3,W-1,W-2,V-1 322.88 Cft

Net Qty 3,452.66 Cft

Brick Work above Lintel Level


6 Roof Beam Beam Long Wall 2 120.000 0.75 2.50 450.00 Cft
Total Qty of brick work 3,902.66 Cft
Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Brick Work 1st Floor
Providing and laying Brick masonry for
walls any Thickness in Superstructure at
any height/floor set in cement sand
mortar 1:6 including making openings etc
as shown on drawings i/c cost of all
materials, scaffolding, labour, curing,
cleaning, raking out joints etc, all as per
drawings, specifications, complete and as
per instructions of Engineer incharge.

Brick Work upto lintel level


1 Roof Beam Beam Long Wall 2 120.000 0.75 8.50 1,530.00 Cft
2 Roof Beam Short Wall 2 35.500 0.75 13.00 692.25 "
3 Roof Beam Inner Room 5 16.170 0.75 13.00 788.29 "
Brick Work upto lintel level
4 Door D-2 6 3.500 0.75 8.50 133.88 "
5 Window W-1 7 6.000 0.75 6.00 189.00 "
Total Qty of Wall 3,010.54 "
D-1,D-2,D-3,W-1,W-2,V-1 322.88 Cft
Net Qty 2,687.66 Cft
Brick Work above Lintel Level
Wall 2 120.00 0.75 2.50 450.00 Cft
Total Qty of brick work 3,137.66 Cft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Plaster
Providing, mixing and applying 1/2" thick
cement sand plaster in (1:6) cement,
sand (as per approved source of
manufacturers list) mortar on internal
surfaces of straight or curved walls etc at
any height including chipping of concrete
surfaces, scaffolding, curing, grooves,
chicken mesh at concrete-masonary
joints etc all as per drawings,
specifications. Complete and as per
instruction of Engineer In charge.

Plaster: Sft

1 Long Walll Room Inner & Outer Sides 4 120.000 _ 13.00 6,240.00 Sft

Long Walll Boundary Wall Inner & Outer


2 2 120.000 _ 8.50 2,040.00 Sft
Sides

3 Short Walll Room Inner & Outer Sides 4 62.330 _ 13.00 3,241.16 Sft

4 Partition Wall 10 16.170 _ 13.00 2,102.10 Sft

5 Door D-2 6 3.500 _ 8.50 178.50 Sft

6 Window W-1 7 6.000 _ 8.50 357.00 Sft

Total Qty of Wall 13,623.26 Sft

D-1,D-2,D-3,W-1,W-2,V-1 535.50 Sft

Net Qty 14,172.15 Sft


Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Plaster Ist Floor
Providing, mixing and applying 1/2" thick
cement sand plaster in (1:4) cement,
sand (as per approved source of
manufacturers list) mortar on ceilings &
extenal wall etc at any height including
chipping of concrete surfaces,
scaffolding, curing, grooves, chicken
mesh at concrete-masonary joints etc all
as per drawings, specifications and as
per instruction of Engineer In charge.

Plaster: Sft
1 Long Walll Room Inner & Outer Sides 4 120.000 _ 11.00 5,280.00 Sft
2 Short Walll Room Inner & Outer Sides 4 62.330 _ 11.00 2,742.52 Sft
3 Partition Wall 10 16.170 _ 11.00 1,778.70 Sft
4 Door D-2 6 3.500 _ 8.50 178.50 Sft
5 Window W-1 7 6.000 _ 8.50 357.00 Sft
Total Qty of Wall 10,336.72 Sft
D-1,D-2,D-3,W-1,W-2,V-1 535.50 Sft
Net Qty 9,801.22 Sft
Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No Area BREADTH HEIGHT
Slab Plaster Ground Floor
Providing, mixing and applying 1/2" thick
cement sand plaster in (1:4) cement,
sand (as per approved source of
manufacturers list) mortar on ceilings &
slab etc at any height including chipping
of concrete surfaces, scaffolding, curing,
grooves, chicken mesh at concrete-
masonary joints etc all as per drawings,
specifications and as per instruction of
Engineer In charge.

Plaster: Sft
1 Total area of slab Basement 1 1314.860 _ _ 1,314.86 Sft
Total area of slab Ground Floor 1 4331.000 _ _ 4,331.00 Sft
Total Qty of Slab 5,928.15 Sft
Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No Area BREADTH HEIGHT
Slab Plaster 1st Floor
Providing, mixing and applying 1/2" thick
cement
Plaster: sand plaster in (1:4) cement, Sft
1 Total area of slab 1 4331.000 _ _ 4,331.00 Sft
Total Qty of Slab 4,547.55 Sft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Concrete 1:4:8 Floor


Providing and laying PCC 1:2:4 under the
floor with sand (as per approved source
of manufacturers list) and crush (as per
approved source of manufacturers list) of
size 1/2" and down including curing and
form work etc all as per drawings ,
specification complete and as per
instructions of Engineer incharge.

1 Basement 1 32.330 40.88 0.33 436.14 "

2 Class Room 5 19.160 16.16 0.33 510.88 "

3 Verandah 1 118.500 14.75 0.33 576.80 "

4 Lawn 1 118.500 29.25 0.33 1,143.82 "

Total 2,667.65 Cft


Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Terrazzo Flooring
Providing and laying 3/4" thick Terrazzo
Flooring in grey cement (1:2) in pannels
not exceeding 16 Sft including grinding,
rubbing and polishing complete mixed
with pigment and marble chips of
approved size, chemically polished,
complete etc as directed and as per
instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2"
wide Marble Divider Strips in panels)

1 Basement 1 32.330 40.88 _ 1,362.53 Sft

2 Class Room 5 19.160 16.16 _ 1,564.29 "

3 Verandah 1 118.500 14.75 _ 1,762.63 "

4 Lawn 1 118.500 29.25 _ 3,495.38 "

Total 8,594.06 Sft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Terrazzo Flooring 1st Floor
Providing and laying 3/4" thick Terrazzo
Flooring in grey cement (1:2) in pannels
not exceeding 16 Sft including grinding,
rubbing and polishing complete mixed
with pigment and marble chips of
approved size, chemically polished,
complete etc as directed and as per
instructions of Engineer Incharge..
(including the cost of 1/4" thick 1-1/2"
wide Marble Divider Strips in panels)
1 Class Room 5 19.160 16.16 _ 1,564.29 "
2 Verandah 1 118.500 14.75 _ 1,762.63 "
Total 3,326.91 Sft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Marble Skirting
Providing and laying 1/2" thick (as per
approved source of manufacturers list)
Marble Skirting of approved shade of
approved size 24" long and 4" wide or
otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge

1 Basement 2 32.330 _ _ 64.66 Rft


2 Basement 2 40.660 81.32 Rft
3 Class Room 12 19.160 _ _ 229.92 "
4 Class Room 12 16.160 193.92 "
5 Verandah 1 118.500 _ _ 118.5 "
6 Verandah 2 14.750 29.5
7 Lawn 1 118.500 _ _ 118.5 "

Total 836.32 Rft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Marble Skirting 1st Floor
Providing and laying 1/2" thick (as per
approved source of manufacturers list)
Marble Skirting of approved shade of
approved size 24" long and 4" wide or
otherwise,as shown on drawings on walls
including grouting complete and as per
instructions of Engineer Incharge

3 Class Room 12 19.160 _ _ 229.92 "


4 Class Room 12 16.160 _ _ 193.92 "
5 Verandah 1 118.500 _ _ 118.5 "
6 Verandah 2 14.750 _ _ 29.5 "
Total 600.43 Rft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Plastic Emulsion Paint


Providing and applying 3 x Coats of
Plastic Emulsion paint ICI/Berger/Nippon
make at any height/floor on internal walls
/ceiling, including preparation of surfaces,
putty filling (Berger/ICI/Nippon make) cost
of all materials labour and scaffolding etc,
complete as per specifacation and as per
instructions of Engineer In charge.

1 Long Walll Room Inner & Outer Sides 4 120.000 _ 13.00 6,240.00 Sft
Long Walll Boundary Wall Inner & Outer
2 2 120.000 _ 8.50 2,040.00 Sft
Sides
3 Short Walll Room Inner & Outer Sides 4 62.330 _ 13.00 3,241.16 Sft

4 Partition Wall 10 16.170 _ 13.00 2,102.10 Sft

5 Basement 2 40.500 _ 13.00 1,053.00 Sft

6 Partition Wall 2 32.330 _ 13.00 840.58 Sft

Total Qty of Wall 15,516.84 Sft

Net Qty 15,516.84 Sft


Detailed Cost Estimate
Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Plastic Emulsion Paint
Providing and applying 3 x Coats of
Plastic Emulsion paint ICI/Berger/Nippon
make at any height/floor on internal walls
/ceiling, including preparation of surfaces,
putty filling (Berger/ICI/Nippon make) cost
of all materials labour and scaffolding etc,
complete as per specifacation and as per
instructions of Engineer In charge.

1 Long Walll Room Inner & Outer Sides 4 120.000 _ 11.00 5,280.00 Sft

2 Short Walll Room Inner & Outer Sides 4 62.330 _ 11.00 2,742.52 Sft
3 Partition Wall 10 16.170 _ 11.00 1,778.70 Sft

Total Qty of Wall 9,801.22 Sft


Net Qty 9,801.22 Sft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No Area BREADTH HEIGHT
Plastic Emulsion Paint Ground Floor
Providing and applying 3 x Coats of
Plastic Emulsion paint ICI/Berger/Nippon
make at any height/floor on internal walls
/ceiling, including preparation of surfaces,
putty filling (Berger/ICI/Nippon make) cost
of all materials labour and scaffolding etc,
complete as per specifacation and as per
instructions of Engineer In charge.

1 Total area of slab Basement 1 1314.860 _ _ 1,314.86 Sft

2 Total area of slab Ground Floor 1 4331.000 4,331.00 Sft

Total Qty of slab 5,645.86 Sft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No Area BREADTH HEIGHT
Plastic Emulsion Paint 1st Floor
Providing and applying 3 x Coats of
Plastic Emulsion paint ICI/Berger/Nippon
make at any height/floor on internal walls
/ceiling, including preparation of surfaces,
putty filling (Berger/ICI/Nippon make) cost
of all materials labour and scaffolding etc,
complete as per specifacation and as per
instructions of Engineer In charge.

1 Total Qty of slab 1 4331.000 _ _ 4,331.00 Sft


Total Qty of slab 4,331.00 Sft
Detailed Cost Estimate
Religious Building
MEASUREMENTS
SR.
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT

Wooden Doors(ground floor)


Providing, making and fixing in position
single or double leaf solid wooden
panelled Door shutter with first class
deodar/Oak wood frame of 2" thickness
and 5" wide at top and sides, 2-1/2" wide
middle strips and 9: wide bottom, and
5mm thick imported tinted glass with
frosted pattern, or as per approved
design with deodar/Oak wood beading
both sides, and first class deodar
wood/Oak chowkat size 2-1/2"x6" fixed
with wooden partitions or as shown on
drawings, i/e glue, nailing, and all
hardware of approved best quality locks
with 3 keys, hinges, handles, door
closers, door stopper etc, and Lacquer
polishing ICI of Berger (3 coats) of
approved shade to all wooden surfaces.

1 Door D-2 6 3.500 _ 8.50 178.50 Sft

2 Window W-1 7 6.000 _ 8.50 357.00 Sft

Total Qty 562.28 Sft

Detailed Cost Estimate


Religious Building
SR. MEASUREMENTS
DESCRIPTION NO. QUANTITY UNIT
No LENGTH BREADTH HEIGHT
Wooden Doors 1st Floor
0
1 Door D-2 6 3.500 _ 8.50 178.50 Sft
2 Window W-1 7 6.000 _ 8.50 357.00 Sft
Total Qty 535.50 Sft
Detailed Cost Estimate
Residential Building
MEASUREMENTS
BOQ.It SR.
DESCRIPTION NO. QUANTITY UNIT
em No No LENGTH BREADTH HEIGHT

Under Ground Water Tank


5.04 #REF!

1 " 1 1.00 Job

Total 1.00 Job

Over Head Water Tank

5.05 #REF!

1 " 1 1.00 Job

Total 1.00 Job

Septic Tank

5.06 #REF!
" 1 1.00 Job

Total 1.00 Job

Septic Tank

Providing, laying of grass/plantation over


1' thick sweet earth, complete in all
5.07
respects, as per drawings, specifications
and instructions of the Engineer Incharge.

" 1 1.00 Job


Total 1.00 Job