LARSEN & TOUBRO (OMAN) LLC

INSTALLATION CHECKLIST FOR NEUTRAL EARTHING RESISTOR

CONSTRUCTION OF 132/33 KV GRID STATION AND ASSOCIATED


PROJECT
TRANSMISSION SYSTEM AT MISFAH AREA (TENDER 175 /2009)
CLIENT Oman Electricity Transmission Company SAOC
CLIENT’S CONSULTANT Energoprojekt Entel LLC
CONTRACTOR Larsen & Toubro (Oman) LLC

RFI No …………………………. DATE …………………………


LOCATION …………..................................................
SYSTEM …………........................DUTY... ........................................
MANUFACTURER …………....................................TYPE / MODEL............................................
INSPECTION:

Item Description of check Results

Confirm equipment has been supplied correctly to the data sheet and verify name plate
01
details against data sheet

02 Check all equipment is suitable for area

03 Verify equipment is suitable for IP rating

04 Visually inspect equipment for external damage

05 Check equipment fixings and mountings are secure

06 Check all connections are correct, tight and cable markings fitted

07 Check all equipment carries the correct circuit identification

08 Visually inspect equipment for cleanliness, internal damage, and to see that no
major components are missing

09 Remove all packing / silica gel etc.

10 Check gaskets and seals are not damaged

11 Check that all bolts are correct and none are missing

REMARKS / OBSERVATIONS:

TITLE Larsen & Toubro (Oman) LLC Energoprojekt Entel LLC


NAME
DESIGNATION
SIGNATURE
DATE

MISFAH- SF – E 06