LARSEN & TOUBRO (OMAN) LLC

INSTALLATION CHECK LIST FOR BATTERY & BATTERY CHARGERS

CONSTRUCTION OF 132/33 KV GRID STATION AND ASSOCIATED


PROJECT
TRANSMISSION SYSTEM AT MISFAH AREA (TENDER 175 /2009)
CLIENT Oman Electricity Transmission Company SAOC
CLIENT’S CONSULTANT Energoprojekt Entel LLC
CONTRACTOR Larsen & Toubro (Oman) LLC

RFI NO DATE

LOCATION: IDENTIFICATION TAG NO:


MANUFACTURER:
BATTERY TAG No: NO OF CELLS: GA DRAWING No:
BATTERY TYPE: ELECTROLYTE TYPE: VOLTAGE: AH:
CHARGER TAG No: GA DRAWING NO: WIRING DIAGRAM No:
CHARGER TYPE: VOLTAGE: CURRENT:
INSPECTION Results
1. Inspect Batteries and charger for mechanical damage
2. Check installation of battery stand and cells in accordance with GA drawings
3. Inspect cell-to-cell interconnection and tightness of bolted connections
4. Inspect greasing of all cell connections
5. Check electrolyte level. & Type
6. Check wiring and ferruling in accordance with wiring/schematic diagrams
7. Check rating of MCCBs, MCBs, ELCB and fuse
8. Check continuity of fuses
9. Check operation of MCCBs, MCBs, and ELCB
10. Check earthing connections inside the Battery Charger
11. Inspect cable gland for suitability and tightness

12. Record earthing resistance between equipment and earth ring ()
13. Record insulation resistance of main circuit to earth (M)
14. Instruction manual available Yes / No
REMARKS / OBSERVATIONS:

TITLE Larsen & Toubro (Oman) LLC Energoprojekt Entel LLC


NAME
DESIGNATION
SIGNATURE
DATE

MISFAH- SF – E 12