Rencana Anggaran Biaya

Project - Repainting OLC-03 & Reinforcement Gallery BLC


ABN Doc. Number REV. Date Issued
ABN - CPP - 010622 - 07 0 07-Jun-22

PROJECT : Maintenance Coal Handling Facility ABN (Repainting dan Reinforce Conveyor)
LOCATION : Barging Plant (OLC - 03, OLC - 05, BLC)
REVISE : 01
DATE : 28 May 2022

Kode Harga Satuan


No. Uraian Pekerjaan Satuan Volume Jumlah harga Keterangan
Analisa ( Rp)
1 2 3 4 5 6 6=4X6
A PEKERJAAN PERSIAPAN
1 Direksi keet / Gudang material Ls 1,00 -
2 Mobilisasi & Demobilisasi alat Compressor, scaffolding dll. Ls 1,00
3 Akomodasi dan transportasi Ls 1,00

Sub Total A (Pek. Persiapan)

B PEKERJAAN MAINTENANCE CHF (REPAINTING & REINFORCEMENT)


1 OLC 03 - Over Land Conveyor 3

a Sandblasting material SAA 2.0 - 2.5 m2 8393,55


b Primary coat 200 micron m2 8393,55
c Top coat 50 micron m2 8393,55

3 Scafolding set 50,00

4 Reinforcement Gallery BLC


a Opsi 1 Replace section gallery kg 11360,45

Sub Total B (Pek. Maintenance CHF)

JUMLAH A + B
Bill of Quantity
Project - Repainting OLC-03 & Reinforcement Gallery BLC
ABN Doc. Number REV. Date Issued
ABN - CPP - 010622 - 08 0 07-Jun-22

Nomor
Segmen Material qty unit berat unit harga per unit Total Harga
Gallery
1 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg
bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

2 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

3 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

4 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
10 ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

1 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

2 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

3 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
Bill of Quantity
Project - Repainting OLC-03 & Reinforcement Gallery BLC
ABN Doc. Number REV. Date Issued
ABN - CPP - 010622 - 08 0 07-Jun-22

ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

4 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
11 ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

1 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

2 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

3 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

4 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
12 ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

1 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

2 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg
Bill of Quantity
Project - Repainting OLC-03 & Reinforcement Gallery BLC
ABN Doc. Number REV. Date Issued
ABN - CPP - 010622 - 08 0 07-Jun-22

3 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

4 UNP 150 x 75 x 7,5 mm x 6 meter 4 batang 448,0 kg


bb Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
bb Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
gb Plat 420 x 220 x 6 mm 6 batang 27,0 kg
ba Siku 60 x 60 x 6 mm x 1,5 meter 6 batang 48,8 kg
ba Siku 60 x 60 x 6 mm x 1,7 meter 6 batang 55,3 kg
13 ga Plat 420 x 220 x 6 mm 6 batang 27,0 kg

Total 11.360,4 kg