Training no TR-OSN-CIV -95

PROJECT : PROPOSED APARNA CYBER STAR,


Site OSN
CYBER SHINE,CYBERON & CYBER HEIGHTS AT
Date 19.12.2023
OSMAN NAGAR

SL NO TOPIC FOR TRAINING DATE LOCATION

TRAINING ON – SLAB & BEAMS OSMANNAGAR PROJECT -


1 19-12-23
SHUTTERING WORKS. CYBER STAR

DISCUSSION: TRAINING ON – SLAB & BEAMS SHUTTERING WORKS.

1 ARCHITECTURAL DRAWING TO BE FOLLOWED

2 1M LEVEL MARKING TO BE DONE ON COLUMNS

3 BEAM ALIGNMENT ,LEVEL & PLUMB

4 DIMENSION & LEVEL CHECKING OF SLAB

5 CUP LOCK SYSTEM FOR CANTILEVERS AND STAIR CASE MID LANDING

6 TIE ROD FOR BEAM MORE THAN 450MM

7 ENSURE PROPER CONNECTION & SUPPORTS TO SHEAR WALL CAP AREA

8 REPROPING FOR SLAB AFTER DESHUTTERING

QAQC REPORTS – DEC- 2023 Page 1 of 2


Training no TR-OSN-CIV -95
PROJECT : PROPOSED APARNA CYBER STAR,
Site OSN
CYBER SHINE,CYBERON & CYBER HEIGHTS AT
Date 19.12.2023
OSMAN NAGAR

Details: TRAINING ON – SLAB & BEAMS SHUTTERING WORKS.

Details: TRAINING ON – SLAB & BEAMS SHUTTERING WORKS.

QAQC REPORTS – DEC- 2023 Page 2 of 2