You are on page 1of 3

NOIDA METRO RAIL CORPORATION LTD.

No : RS/MW/GND/39

ROLLING STOCK DEPARTMENT Rev No: 00


PREVENTIVE MAINTENANCE RECORD DATE :
Name of M&P: E.O.T CRANE SCHEDULE : Half Yearly

E.O.T CRANE Location: __________


Note:
This Checklist for ‘Quarterly’ Service Checks should be Capacity_______
applied to the Time period scheduled, since the last Service.
Downtime Man Hours Skill Requirements
3 Hrs 2 Mechanical & Electrical
Work Preparation
1. Safety
Switch off the power supply prior to any maintenance and put UNDER MAINTENANCE Board on the
panel, also switch off the CB of respective crane.
2. Tools and Equipments Required
(a) Paint Brush (b) Torch (c) Spanners (d) Dust clothes (e) Sand papers (f) Safety Helmet
(g) WD-40 (h) Grease. (i) Lubrication Oil

NOTE:- Use scissor lift to access bridge area of crane to check for any fault(WS, PWL).
Task Equipment Maintenance Actions O.K./NOT Remarks
No O.K

CRANE BRIDGE
1 Main Girder Check for any Mechanical Damage.
Check for any weld seems for cracks.
2 Limit switches Check operation for cut off.
3 Gear box Check the lubrication oil level in gear
boxes of hoist.
Check for any leakage.
CONTROL SYSTEM
4 Emergency Check operation of emergency switch.
switch
5 Hoist limit Check operation of limit switches.
switches
Move the crane to nearest crane and
Collision check whether it stops or not upon
reaching other crane.
6 prevention
system (For Clean dirt accumulation on reflectors.
WS cranes)

Check contactor & mcb for sparking,


change if required.

Check working of all push buttons in


pendant.
7
Power supply
Check all underbridge and platform
lights, buzzer/alarm system are working.

Check for any damage of stationary


cable, moving connection cable and
pendant cable.
Check UP/Down movement of hoist .
8 Operation Check cross movement of hoist.
Check longitudinal movement of hoist.
9 Greasing Greasing of wire ropes if necessary.

Check rope wire for any broken stand.

Check hook and hook safety latch for


any crack or damage.

10 Air cleaning of crane bridge platform,


Miscellaneous
cabin etc.
Check the complete operation of crane.
Maintenance Signature Signature
Done by:

Name
Name

Checked By Signature

Name

You might also like