You are on page 1of 23

B.

3 EPF

B.3.1.1 CIVIL & STRUCTURAL

NCCNCVCON00011-01: Earthwork Grading, Levelling Work - NC200-EPF

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed

NCCNCVCON00011-01-01 Earthwork Grading, Levelling Work - NC200-EPF 100% 1 0.7 70%

NCCNCVCON00011-02: Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)

Actual Quantity
ID activity Description Weight Actual Scope % RFI N° ITR N° Date
Completed

NCCNCVCON00011-02-01 Excavation 20% 1 1 100% C-INTECH-00248A C-0207A 4504900%


NCCNCVCON00011-02-02 Blinding 5% 1 1 100% C-INTECH-00248A C-0207A 4504900%
NCCNCVCON00011-02-03 Rebar & Anchor Bolt Installation 10% 1 0.7 70% C-INTECH-00248A C-0207A 4504900%
NCCNCVCON00011-02-04 Shuttering 15% 1 0.7 70% C-INTECH-00248A C-0207A 4504900%
NCCNCVCON00011-02-05 Pouring 35% 10.28 7.196 70% C-INTECH-00248A C-0207A 4504900%
NCCNCVCON00011-02-06 Coating 5% 1 0.7 70% C-INTECH-00248A C-0207A 4504900%
NCCNCVCON00011-02-07 Backfill, Compaction /Testing 10% 1 0.7 70% C-INTECH-00248A C-0207A 4504900%

NCPRGNCON00004 : Foundation for Telecom Tower at accommodation Camp

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed

NCPRGNCON00004-01 Excavation 20% 1 1 100%


NCPRGNCON00004-02 Blinding 5% 1 1 100%
NCPRGNCON00004-03 Rebar & Anchor Bolt Installation 10% 1 0.8 80%
NCPRGNCON00004-04 Shuttering 15% 1 0.8 80%
NCPRGNCON00004-05 Pouring 35% 61.00 48.80 80%
NCPRGNCON00004-06 Coating 5% 1 0%
NCPRGNCON00004-07 Backfill, Compaction /Testing 10% 1 0%

NCCNCVCON00011-03: Structural Steel Erection : EPF Area


ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed

NCCNCVCON00011-03-01 Materials handling 10% 1 1 100%


NCCNCVCON00011-03-02 Install Structure on foundation 50% 1 1 100%
NCCNCVCON00011-03-03 Alignment & Bolt tightening / tarquing 20% 1 1 100%
NCCNCVCON00011-03-04 Grouting 10% 1 0.24 23.53%
NCCNCVCON00011-03-05 Inspection & acceptance by Quality as per approved ITP 10% 1.00 0%

NCCNCVCON00011-04: Installation of Fencing, Guard Rails & Gates : EPF Area

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed

NCCNCVCON00011-04-01 Pre-cast concrete 20% 1 1 100%


NCCNCVCON00011-04-02 Excavation 10% 1 0.65 65%
NCCNCVCON00011-04-03 Transport, Install posts & Backfill 20% 1 0.65 65%
NCCNCVCON00011-04-04 Railing, Bracing & Mesh work 30% 1 0.15 15%
NCCNCVCON00011-04-05 Gates installation 10% 1.00 0.25 25%
NCCNCVCON00011-04-06 Inspection & acceptance by Quality as per approved ITP 10% 1.00 0%

NCCNCVCON00011-05: Road Works (Concrete Paving & Gravel Filling) - NC200-EPF Area

Actual Quantity
ID activity Description Weight Actual Scope % RFI N° ITR N° Date
Completed

NCCNCVCON00011-05-01 Mark/Strip/level/Grade/Compact 20% 1 0%


NCCNCVCON00011-05-02 Sub-base (tuff) Laying/Compaction 30% 1 0%
NCCNCVCON00011-05-03 Base (tuff) Laying/Compaction 30% 1 0%
NCCNCVCON00011-05-04 Shoulder/ boarder work 10% 1 0%
NCCNCVCON00011-05-05 Finishing & Acceptance by Quality as per approved ITP 10% 1 0%
Activity Code Area Descipline
NCCNCVCON00011-01-01 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-01 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-02 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-03 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-04 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-05 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-06 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-02-07 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-01 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-02 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-03 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-04 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-05 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-06 EPF AREA CIVIL & STRUCTURAL
NCPRGNCON00004-07 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-03-01 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-03-02 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-03-03 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-03-04 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-03-05 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-01 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-02 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-03 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-04 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-05 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-04-06 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-05-01 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-05-02 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-05-03 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-05-04 EPF AREA CIVIL & STRUCTURAL
NCCNCVCON00011-05-05 EPF AREA CIVIL & STRUCTURAL
NCCNCVGRD01011-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-06 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-01-07 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-06 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-04-07 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-06 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-02-07 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-06 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-03-07 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-05-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-05-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-05-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-05-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-05-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-06-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-06-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-06-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-06-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-06-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-06 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-08-07 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-01 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-02 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-03 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-04 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-05 E1 CIVIL & STRUCTURAL
NCCNCVCON01016-07-06 E1 CIVIL & STRUCTURAL
NCCNCVGRD04011-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-06 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-01-07 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-06 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-04-07 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-06 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-02-07 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-06 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-03-07 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-05-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-05-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-05-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-05-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-05-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-07-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-07-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-07-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-07-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-07-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-06 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-08-07 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-01 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-02 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-03 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-04 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-05 E4 CIVIL & STRUCTURAL
NCCNCVCON04016-06-06 E4 CIVIL & STRUCTURAL
NCCNCVGRD01011-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-06 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-01-07 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-06 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-04-07 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-06 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-02-07 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-06 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-03-07 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-05-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-05-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-05-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-05-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-05-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-06-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-06-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-06-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-06-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-06-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-06 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-08-07 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-01 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-02 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-03 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-04 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-05 E5 CIVIL & STRUCTURAL
NCCNCVCON01016-07-06 E5 CIVIL & STRUCTURAL
NCCNCVGRD01011-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-06 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-01-07 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-06 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-04-07 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-06 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-02-07 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-06 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-03-07 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-05-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-05-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-05-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-05-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-05-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-06-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-06-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-06-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-06-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-06-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-06 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-08-07 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-01 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-02 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-03 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-04 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-05 E7 CIVIL & STRUCTURAL
NCCNCVCON01016-07-06 E7 CIVIL & STRUCTURAL
Description
Earthwork Grading, Levelling Work
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Foundation for Telecom Tower at accommodation Camp
Structural Steel Erection : EPF Area
Structural Steel Erection : EPF Area
Structural Steel Erection : EPF Area
Structural Steel Erection : EPF Area
Structural Steel Erection : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Installation of Fencing, Guard Rails & Gates : EPF Area
Road Works (Concrete Paving & Gravel Filling)
Road Works (Concrete Paving & Gravel Filling)
Road Works (Concrete Paving & Gravel Filling)
Road Works (Concrete Paving & Gravel Filling)
Road Works (Concrete Paving & Gravel Filling)
Earthwork Grading, Levelling Work
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001)
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Piping & EIT Supports - NC200-E1
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001)
Structural Steel Erection for Static & Rotary Equipment - NC200-E1
Structural Steel Erection for Static & Rotary Equipment - NC200-E1
Structural Steel Erection for Static & Rotary Equipment - NC200-E1
Structural Steel Erection for Static & Rotary Equipment - NC200-E1
Structural Steel Erection for Static & Rotary Equipment - NC200-E1
Road Works (Concrete Paving & Gravel Filling) - NC200-E1
Road Works (Concrete Paving & Gravel Filling) - NC200-E1
Road Works (Concrete Paving & Gravel Filling) - NC200-E1
Road Works (Concrete Paving & Gravel Filling) - NC200-E1
Road Works (Concrete Paving & Gravel Filling) - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
ipe Support Foundation - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Installation of Fencing, Guard Rails & Gates - NC200-E1
Earthwork Grading, Levelling Work
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001)
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Piping & EIT Supports - NC200-E4
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001)
Structural Steel Erection for Static & Rotary Equipment - NC200-E4
Structural Steel Erection for Static & Rotary Equipment - NC200-E4
Structural Steel Erection for Static & Rotary Equipment - NC200-E4
Structural Steel Erection for Static & Rotary Equipment - NC200-E4
Structural Steel Erection for Static & Rotary Equipment - NC200-E4
Road Works (Concrete Paving & Gravel Filling) - NC200-E4
Road Works (Concrete Paving & Gravel Filling) - NC200-E4
Road Works (Concrete Paving & Gravel Filling) - NC200-E4
Road Works (Concrete Paving & Gravel Filling) - NC200-E4
Road Works (Concrete Paving & Gravel Filling) - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
ipe Support Foundation - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Installation of Fencing, Guard Rails & Gates - NC200-E4
Earthwork Grading, Levelling Work
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001)
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Piping & EIT Supports - NC200-E5
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001)
Structural Steel Erection for Static & Rotary Equipment - NC200-E5
Structural Steel Erection for Static & Rotary Equipment - NC200-E5
Structural Steel Erection for Static & Rotary Equipment - NC200-E5
Structural Steel Erection for Static & Rotary Equipment - NC200-E5
Structural Steel Erection for Static & Rotary Equipment - NC200-E5
Road Works (Concrete Paving & Gravel Filling) - NC200-E5
Road Works (Concrete Paving & Gravel Filling) - NC200-E5
Road Works (Concrete Paving & Gravel Filling) - NC200-E5
Road Works (Concrete Paving & Gravel Filling) - NC200-E5
Road Works (Concrete Paving & Gravel Filling) - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
ipe Support Foundation - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Installation of Fencing, Guard Rails & Gates - NC200-E5
Earthwork Grading, Levelling Work
Civil Foundation : Crude oil Export scraper launcher (NC200-002-10-V-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Piping & EIT Supports - NC200-E7
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)
Structural Steel Erection for Static & Rotary Equipment - NC200-E7
Structural Steel Erection for Static & Rotary Equipment - NC200-E7
Structural Steel Erection for Static & Rotary Equipment - NC200-E7
Structural Steel Erection for Static & Rotary Equipment - NC200-E7
Structural Steel Erection for Static & Rotary Equipment - NC200-E7
Road Works (Concrete Paving & Gravel Filling) - NC200-E7
Road Works (Concrete Paving & Gravel Filling) - NC200-E7
Road Works (Concrete Paving & Gravel Filling) - NC200-E7
Road Works (Concrete Paving & Gravel Filling) - NC200-E7
Road Works (Concrete Paving & Gravel Filling) - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
ipe Support Foundation - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Installation of Fencing, Guard Rails & Gates - NC200-E7
Step
Earthwork Grading, Levelling Work - NC200-EPF
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Materials handling
Install Structure on foundation
Alignment & Bolt tightening / tarquing
Grouting
Inspection & acceptance by Quality as per approved ITP
Pre-cast concrete
Excavation
Transport, Install posts & Backfill
Railing, Bracing & Mesh work
Gates installation
Inspection & acceptance by Quality as per approved ITP
Mark/Strip/level/Grade/Compact
Sub-base (tuff) Laying/Compaction
Base (tuff) Laying/Compaction
Shoulder/ boarder work
Finishing & Acceptance by Quality as per approved ITP
Earthwork Grading, Levelling Work - NC200-E1
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Materials handling
Install Structure on foundation
Alignment & Bolt tightening / tarquing
Grouting
Inspection & acceptance by Quality as per approved ITP
Mark/Strip/level/Grade/Compact
Sub-base (tuff) Laying/Compaction
Base (tuff) Laying/Compaction
Shoulder/ boarder work
Finishing & Acceptance by Quality as per approved ITP
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Pre-cast concrete
Excavation
Transport, Install posts & Backfill
Railing, Bracing & Mesh work
Gates installation
Inspection & Acceptance by Quality as per approved ITP
Earthwork Grading, Levelling Work - NC200-E4
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Materials handling
Install Structure on foundation
Alignment & Bolt tightening / tarquing
Grouting
Inspection & acceptance by Quality as per approved ITP
Mark/Strip/level/Grade/Compact
Sub-base (tuff) Laying/Compaction
Base (tuff) Laying/Compaction
Shoulder/ boarder work
Finishing & Acceptance by Quality as per approved ITP
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Pre-cast concrete
Excavation
Transport, Install posts & Backfill
Railing, Bracing & Mesh work
Gates installation
Inspection & Acceptance by Quality as per approved ITP
Earthwork Grading, Levelling Work - NC200-E5
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Materials handling
Install Structure on foundation
Alignment & Bolt tightening / tarquing
Grouting
Inspection & acceptance by Quality as per approved ITP
Mark/Strip/level/Grade/Compact
Sub-base (tuff) Laying/Compaction
Base (tuff) Laying/Compaction
Shoulder/ boarder work
Finishing & Acceptance by Quality as per approved ITP
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Pre-cast concrete
Excavation
Transport, Install posts & Backfill
Railing, Bracing & Mesh work
Gates installation
Inspection & Acceptance by Quality as per approved ITP
Earthwork Grading, Levelling Work - NC200-E7
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Materials handling
Install Structure on foundation
Alignment & Bolt tightening / tarquing
Grouting
Inspection & acceptance by Quality as per approved ITP
Mark/Strip/level/Grade/Compact
Sub-base (tuff) Laying/Compaction
Base (tuff) Laying/Compaction
Shoulder/ boarder work
Finishing & Acceptance by Quality as per approved ITP
Excavation
Blinding
Rebar & Anchor Bolt Installation
Shuttering
Pouring
Coating
Backfill, Compaction /Testing
Pre-cast concrete
Excavation
Transport, Install posts & Backfill
Railing, Bracing & Mesh work
Gates installation
Inspection & Acceptance by Quality as per approved ITP
B.1.1 E-WELL HEADS NC 200 E1 B.1.2 E-WELL HEADS NC 200 E4 B.1.3 E-WELL HEADS NC 200 E5 B.1.4 E-WELL HEADS NC 200 E7

B.1.1.1 CIVIL & STRUCTURAL B.1.2.1 CIVIL & STRUCTURAL B.1.3.1 CIVIL & STRUCTURAL B.1.4.1 CIVIL & STRUCTURAL

NCCNCVGRD01011: Earthwork Grading, Levelling Work - NC200-E1 NCCNCVGRD04011: Earthwork Grading, Levelling Work - NC200-E4 NCCNCVGRD05011: Earthwork Grading, Levelling Work - NC200-E5 NCCNCVGRD07011: Earthwork Grading, Levelling Work - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVGRD01011-01 Earthwork Grading, Levelling Work - NC200-E1 100% 1 0.7 70% - - - NCCNCVGRD04011-01 Earthwork Grading, Levelling Work - NC200-E4 100% 1 0.7 70% - - - NCCNCVGRD05011-01 Earthwork Grading, Levelling Work - NC200-E5 100% 1 0.7 70% - - - NCCNCVGRD07011-01 Earthwork Grading, Levelling Work - NC200-E7 100% 1 0.7 70% - - -

NCCNCVCON01016-01: Bulk Diesel Fuel Tank for DG set (NC200-005-E1-30-T-001) NCCNCVCON04016-01: Bulk Diesel Fuel Tank for DG set (NC200-005-E4-30-T-001) NCCNCVCON05016-01: Bulk Diesel Fuel Tank for DG set (NC200-005-E5-30-T-001) NCCNCVCON07016-01: Bulk Diesel Fuel Tank for DG set (NC200-005-E7-30-T-001)

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-01-01 Excavation 20% 1 1 100% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-01 Excavation 20% 1 1 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-01 Excavation 20% 1 1 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-01 Excavation 20% 1 1 100% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-02 Blinding 5% 1 1 100% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-02 Blinding 5% 1 1 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-02 Blinding 5% 1 1 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-02 Blinding 5% 1 1 100% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-03 Rebar & Anchor Bolt Installation 10% 1 0.8 80% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-03 Rebar & Anchor Bolt Installation 10% 1 0.8 80% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-03 Rebar & Anchor Bolt Installation 10% 1 0.95 95% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-03 Rebar & Anchor Bolt Installation 10% 1 0.95 95% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-04 Shuttering 15% 1 0.9 90% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-04 Shuttering 15% 1 1 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-04 Shuttering 15% 1 1 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-04 Shuttering 15% 1 1 100% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-05 Pouring 35% 10.5 8.925 85% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-05 Pouring 35% 10.5 10.5 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-05 Pouring 35% 10.5 10.5 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-05 Pouring 35% 10.5 10.5 100% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-06 Coating 5% 1 1 100% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-06 Coating 5% 1 1 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-06 Coating 5% 1 1 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-06 Coating 5% 1 1 100% C-INTECH-00207A C-0207A 5/3/2023
NCCNCVCON01016-01-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00251A C-0207A 5/3/2023 NCCNCVCON04016-01-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00248A C-0207A 5/3/2023 NCCNCVCON05016-01-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00209A C-0207A 5/3/2023 NCCNCVCON07016-01-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00207A C-0207A 5/3/2023

NCCNCVCON01016-04-02: Civil Foundation : Piping & EIT Supports - NC200-E1 NCCNCVCON04016-04-02: Civil Foundation : Piping & EIT Supports - NC200-E4 NCCNCVCON05016-04-02: Civil Foundation : Piping & EIT Supports - NC200-E5 NCCNCVCON07016-04-02: Civil Foundation : Piping & EIT Supports - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-04-01 Excavation 20% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-01 Excavation 20% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-01 Excavation 20% 1 1 100% C-INTECH-00231 C-0208X 4/25/2023 NCCNCVCON07016-04-01 Excavation 20% 1 1 100% C-INTECH-00159 C-0208X 4/2/2023
NCCNCVCON01016-04-02 Blinding 5% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-02 Blinding 5% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-02 Blinding 5% 1 1 100% C-INTECH-00231 C-0208X 4/25/2023 NCCNCVCON07016-04-02 Blinding 5% 1 1 100% C-INTECH-00159 C-0208X 4/2/2023
NCCNCVCON01016-04-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-03 Rebar & Anchor Bolt Installation 10% 1 1 100% - - - NCCNCVCON07016-04-03 Rebar & Anchor Bolt Installation 10% 1 1 100%
NCCNCVCON01016-04-04 Shuttering 15% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-04 Shuttering 15% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-04 Shuttering 15% 1 1 100% C-INTECH-00231 C-0208X 4/25/2023 NCCNCVCON07016-04-04 Shuttering 15% 1 1 100% C-INTECH-00159 C-0208X 4/2/2023
NCCNCVCON01016-04-05 Pouring 35% 32.22 32.22 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-05 Pouring 35% 32.22 32.22 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-05 Pouring 35% 32.22 32.22 100% C-INTECH-00231 C-0208X 4/25/2023 NCCNCVCON07016-04-05 Pouring 35% 32.22 32.22 100% C-INTECH-00159 C-0208X 4/2/2023
NCCNCVCON01016-04-06 Coating 5% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-06 Coating 5% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-06 Coating 5% 1 1 100% C-INTECH-00231 C-0208X 4/25/2023 NCCNCVCON07016-04-06 Coating 5% 1 1 100% C-INTECH-00159 C-0208X 4/2/2023
NCCNCVCON01016-04-07 Backfill, Compaction /Testing 10% 1 0.9 90% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-04-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-04-07 Backfill, Compaction /Testing 10% 1 1 100% - - - NCCNCVCON07016-04-07 Backfill, Compaction /Testing 10% 1 1 100% - - -
NCCNCVCON01016-02: Civil Foundation : Diesel Generator set (NC200-005-E1-30-DG-001) NCCNCVCON04016-02: Civil Foundation : Diesel Generator set (NC200-005-E4-30-DG-001) NCCNCVCON05016-02: Civil Foundation : Diesel Generator set (NC200-005-E5-30-DG-001) NCCNCVCON07016-02: Civil Foundation : Diesel Generator set (NC200-005-E7-30-DG-001)

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-02-01 Excavation 20% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-01 Excavation 20% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-01 Excavation 20% 1 1 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-01 Excavation 20% 1 1 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-02 Blinding 5% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-02 Blinding 5% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-02 Blinding 5% 1 1 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-02 Blinding 5% 1 1 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-04 Shuttering 15% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-04 Shuttering 15% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-04 Shuttering 15% 1 1 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-04 Shuttering 15% 1 1 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-05 Pouring 35% 24.55 24.55 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-05 Pouring 35% 24.55 24.55 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-05 Pouring 35% 24.55 24.55 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-05 Pouring 35% 24.55 24.55 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-06 Coating 5% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-06 Coating 5% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-06 Coating 5% 1 1 100% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-06 Coating 5% 1 1 100% C-INTECH-00464 C-0207A 8/20/2023
NCCNCVCON01016-02-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00373 C-0207A 6/19/2023 NCCNCVCON04016-02-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00265 C-0207A 5/7/2023 NCCNCVCON05016-02-07 Backfill, Compaction /Testing 10% 1 0.8 80% C-INTECH-00379 C-0207A 6/20/2023 NCCNCVCON07016-02-07 Backfill, Compaction /Testing 10% 1 0.8 80% C-INTECH-00464 C-0207A 8/20/2023

NCCNCVCON01016-03: Civil Foundation : Corrosion Inhibitor Skid (NC200-005-E1-30-Z-001) NCCNCVCON04016-03: Civil Foundation : Corrosion Inhibitor Skid (NC200-005-E4-30-Z-001) NCCNCVCON05016-03: Civil Foundation : Corrosion Inhibitor Skid (NC200-005-E5-30-Z-001) NCCNCVCON07016-03: Civil Foundation : Corrosion Inhibitor Skid (NC200-005-E7-30-Z-001)

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-03-01 Excavation 20% 1 1 100% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-01 Excavation 20% 1 1 100% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-01 Excavation 20% 1 1 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-01 Excavation 20% 1 1 100% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-02 Blinding 5% 1 1 100% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-02 Blinding 5% 1 1 100% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-02 Blinding 5% 1 1 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-02 Blinding 5% 1 1 100% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-04 Shuttering 15% 1 0.8 80% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-04 Shuttering 15% 1 0.85 85% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-04 Shuttering 15% 1 0.9 90% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-04 Shuttering 15% 1 0.9 90% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-05 Pouring 35% 7.98 6.38 80% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-05 Pouring 35% 7.98 7.18 90% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-05 Pouring 35% 7.98 7.98 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-05 Pouring 35% 7.98 7.98 100% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-06 Coating 5% 1 0.8 80% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-06 Coating 5% 1 0.9 90% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-06 Coating 5% 1 1 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-06 Coating 5% 1 1 100% C-INTECH-00414 C-0207A 25-July-23
NCCNCVCON01016-03-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00375 C-0207A 6/19/2023 NCCNCVCON04016-03-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00435 C-0207A 8/9/2023 NCCNCVCON05016-03-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00389 C-0207A 6/22/2023 NCCNCVCON07016-03-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00414 C-0207A 25-July-23

NCCNCVCON01016-05: Structural Steel Erection for Static & Rotary Equipment - NC200-E1 NCCNCVCON04016-05: Structural Steel Erection for Static & Rotary Equipment - NC200-E4 NCCNCVCON05016-05: Structural Steel Erection for Static & Rotary Equipment - NC200-E5 NCCNCVCON07016-05: Structural Steel Erection for Static & Rotary Equipment - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-05-01 Materials handling 10% 1 1 100% - - - NCCNCVCON04016-05-01 Materials handling 10% 1 1 100% - - - NCCNCVCON05016-05-01 Materials handling 10% 1 1 100% NCCNCVCON07016-05-01 Materials handling 10% 1 1 100% - - -
NCCNCVCON01016-05-02 Install Structure on foundation 50% 1 0.8 80% - - - NCCNCVCON04016-05-02 Install Structure on foundation 50% 1 1 100% - - - NCCNCVCON05016-05-02 Install Structure on foundation 50% 1 0.8 80% NCCNCVCON07016-05-02 Install Structure on foundation 50% 1 0.8 80% - - -
NCCNCVCON01016-05-03 Alignment & Bolt tightening / tarquing 20% 1 0.5 50% - - - NCCNCVCON04016-05-03 Alignment & Bolt tightening / tarquing 20% 1 0.7 70% - - - NCCNCVCON05016-05-03 Alignment & Bolt tightening / tarquing 20% 1 0.5 50% NCCNCVCON07016-05-03 Alignment & Bolt tightening / tarquing 20% 1 0.5 50% - - -
NCCNCVCON01016-05-04 Grouting 10% 1 0% - - - NCCNCVCON04016-05-04 Grouting 10% 1 0% - - - NCCNCVCON05016-05-04 Grouting 10% 1 0% NCCNCVCON07016-05-04 Grouting 10% 1 0% - - -
NCCNCVCON01016-05-05 Inspection & acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON04016-05-05 Inspection & acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON05016-05-05 Inspection & acceptance by Quality as per approved ITP 10% 1 0% NCCNCVCON07016-05-05 Inspection & acceptance by Quality as per approved ITP 10% 1 0% - - -
NCCNCVCON01016-06: Road Works (Concrete Paving & Gravel Filling) - NC200-E1 NCCNCVCON04016-07: Road Works (Concrete Paving & Gravel Filling) - NC200-E4 NCCNCVCON05016-07: Road Works (Concrete Paving & Gravel Filling) - NC200-E5 NCCNCVCON07016-07: Road Works (Concrete Paving & Gravel Filling) - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-06-01 Mark/Strip/level/Grade/Compact 20% 1 0% - - - NCCNCVCON04016-07-01 Mark/Strip/level/Grade/Compact 20% 1 0% - - - NCCNCVCON05016-07-01 Mark/Strip/level/Grade/Compact 20% 1 0% NCCNCVCON07016-07-01 Mark/Strip/level/Grade/Compact 20% 1 0% - - -
NCCNCVCON01016-06-02 Sub-base (tuff) Laying/Compaction 30% 1 0% - - - NCCNCVCON04016-07-02 Sub-base (tuff) Laying/Compaction 30% 1 0% - - - NCCNCVCON05016-07-02 Sub-base (tuff) Laying/Compaction 30% 1 0% NCCNCVCON07016-07-02 Sub-base (tuff) Laying/Compaction 30% 1 0% - - -
NCCNCVCON01016-06-03 Base (tuff) Laying/Compaction 30% 1 0% - - - NCCNCVCON04016-07-03 Base (tuff) Laying/Compaction 30% 1 0% - - - NCCNCVCON05016-07-03 Base (tuff) Laying/Compaction 30% 1 0% NCCNCVCON07016-07-03 Base (tuff) Laying/Compaction 30% 1 0% - - -
NCCNCVCON01016-06-04 Shoulder/ boarder work 10% 1 0% - - - NCCNCVCON04016-07-04 Shoulder/ boarder work 10% 1 0% - - - NCCNCVCON05016-07-04 Shoulder/ boarder work 10% 1 0% NCCNCVCON07016-07-04 Shoulder/ boarder work 10% 1 0% - - -
NCCNCVCON01016-06-05 Finishing & Acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON04016-07-05 Finishing & Acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON05016-07-05 Finishing & Acceptance by Quality as per approved ITP 10% 1 0% NCCNCVCON07016-07-05 Finishing & Acceptance by Quality as per approved ITP 10% 1 0% - - -

NCCNCVCON01016-08: Pipe Support Foundation - NC200-E1 NCCNCVCON04016-08: Pipe Support Foundation - NC200-E4 NCCNCVCON05016-08: Pipe Support Foundation - NC200-E5 NCCNCVCON07016-08: Pipe Support Foundation - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-08-01 Excavation 20% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-01 Excavation 20% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-01 Excavation 20% 1 1 100% NCCNCVCON07016-08-01 Excavation 20% 1 1 100% C-INTECH-00314 C-0208X 5/23/2023
NCCNCVCON01016-08-02 Blinding 5% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-02 Blinding 5% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-02 Blinding 5% 1 1 100% NCCNCVCON07016-08-02 Blinding 5% 1 1 100% C-INTECH-00314 C-0208X 5/23/2023
NCCNCVCON01016-08-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-03 Rebar & Anchor Bolt Installation 10% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-03 Rebar & Anchor Bolt Installation 10% 1 1 100% NCCNCVCON07016-08-03 Rebar & Anchor Bolt Installation 10% 1 1 100% - - -
NCCNCVCON01016-08-04 Shuttering 15% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-04 Shuttering 15% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-04 Shuttering 15% 1 1 100% NCCNCVCON07016-08-04 Shuttering 15% 1 1 100% C-INTECH-00314 C-0208X 5/23/2023
NCCNCVCON01016-08-05 Pouring 35% 10.00 10.00 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-05 Pouring 35% 10.00 10.00 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-05 Pouring 35% 10.00 10.00 100% NCCNCVCON07016-08-05 Pouring 35% 10.00 10.00 100% C-INTECH-00314 C-0208X 5/23/2023
NCCNCVCON01016-08-06 Coating 5% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-06 Coating 5% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-06 Coating 5% 1 1 100% NCCNCVCON07016-08-06 Coating 5% 1 1 100% C-INTECH-00314 C-0208X 5/23/2023
NCCNCVCON01016-08-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00241/C-INTECH-00395 C-0208X 4/29/2023 & 7/5/2023 NCCNCVCON04016-08-07 Backfill, Compaction /Testing 10% 1 1 100% C-INTECH-00306 C-0207A 5/21/2023 NCCNCVCON05016-08-07 Backfill, Compaction /Testing 10% 1 1 100% NCCNCVCON07016-08-07 Backfill, Compaction /Testing 10% 1 1 100% - - -

NCCNCVCON01016-07-01: Installation of Fencing, Guard Rails & Gates - NC200-E1 NCCNCVCON04016-06: Installation of Fencing, Guard Rails & Gates - NC200-E4 NCCNCVCON05016-06: Installation of Fencing, Guard Rails & Gates - NC200-E5 NCCNCVCON07016-06: Installation of Fencing, Guard Rails & Gates - NC200-E7

ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date ID activity Description Weight Actual Scope Actual Quantity % RFI N° ITR N° Date
Completed Completed Completed Completed

NCCNCVCON01016-07-01 Pre-cast concrete 20% 1 1 100% C-INTECH-00420 C-0208X 5/24/2023 NCCNCVCON04016-06-01 Pre-cast concrete 20% 1 1 100% C-INTECH-00291 C-0208X 5/14/2023 NCCNCVCON05016-06-01 Pre-cast concrete 20% 1 1 100% NCCNCVCON07016-06-01 Pre-cast concrete 20% 1 1 100% C-INTECH-00317 C-0208X 5/25/2023
NCCNCVCON01016-07-02 Excavation 10% 1 1 100% C-INTECH-00408 C-0101X/C-0102X 7/17/2023 NCCNCVCON04016-06-02 Excavation 10% 1 1 100% C-INTECH-00291 C-0208X 5/14/2023 NCCNCVCON05016-06-02 Excavation 10% 1 1 100% NCCNCVCON07016-06-02 Excavation 10% 1 1 100% C-INTECH-00282 C-0601X 5/11/2023
NCCNCVCON01016-07-03 Transport, Install posts & Backfill 20% 1 1 100% - - - NCCNCVCON04016-06-03 Transport, Install posts & Backfill 20% 1 1 100% C-INTECH-00291 C-0208X 5/14/2023 NCCNCVCON05016-06-03 Transport, Install posts & Backfill 20% 1 1 100% NCCNCVCON07016-06-03 Transport, Install posts & Backfill 20% 1 1 100% C-INTECH-00317 C-0208X 5/25/2023
NCCNCVCON01016-07-04 Railing, Bracing & Mesh work 30% 1 1 100% - - - NCCNCVCON04016-06-04 Railing, Bracing & Mesh work 30% 1 1 100% - - - NCCNCVCON05016-06-04 Railing, Bracing & Mesh work 30% 1 1 100% NCCNCVCON07016-06-04 Railing, Bracing & Mesh work 30% 1 1 100% - - -
NCCNCVCON01016-07-05 Gates installation 10% 1.00 1.00 100% - - - NCCNCVCON04016-06-05 Gates installation 10% 1.00 1.00 100% - - - NCCNCVCON05016-06-05 Gates installation 10% 1 1 100% NCCNCVCON07016-06-05 Gates installation 10% 1 1 100% - - -
NCCNCVCON01016-07-06 Inspection & Acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON04016-06-06 Inspection & acceptance by Quality as per approved ITP 10% 1 0% - - - NCCNCVCON05016-06-06 Inspection & acceptance by Quality as per approved ITP 10% 1 0% NCCNCVCON07016-06-06 Inspection & acceptance by Quality as per approved ITP 10% 1 0% - - -