PROGRAM OF WORK

September 19, 2023

PROJECT TITLE REPAIR OF CANOPY


Minimum Required Manpower
ITEMS/ DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
A. HARDWARE
Tiklad piece 100 15.00 1,500.00
Coco Lumber 2x2 piece 20 150.00 3,000.00
Coco Lumber 2x5 piece 1 500.00 500.00
Bamboo piece 10 150.00 1,500.00
Nail 2" kilo 1 80.00 80.00
Nail 3" kilo 1 80.00 80.00
Flat GI sheet piece 1 500.00 500.00

B. LABOR COST
3 days skilled worker pax 1 500.00 1,500.00
3 days laborer pax 1 400.00 1,200.00
TOTAL MATERIAL COST 7,160.00

TOTAL PROJECT COST 9,860.00

Prepared by:

PAULO M. DELA CRUZ


Teacher III
PROGRAM OF WORK
November 21, 2022

PROJECT TITLE WATERPROOFING OF WALL (Residential)


Minimum Required Manpower
ITEMS/ DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
A. HARDWARE
Plexibond pail 3 3,300.00 9,900.00
Paint brush, 4" piece 10 75.00 750.00
Baby rollers piece 10 50.00 500.00

B. LABOR COST
5 days skilled worker pax 2 500.00 5,000.00
TOTAL MATERIAL COST 11,150.00

TOTAL PROJECT COST 16,150.00

Prepared by:

AUDREY ROSE B. AVILA


AO I (Supply)

Approved by:

MAYBELLE V. RUBIO
School Principal II
PROGRAM OF WORK
November 21, 2022

PROJECT TITLE REPAIR OF CEILING


Minimum Required Manpower
ITEMS/ DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
A. HARDWARE
Marine plywood, 1/4" piece 10 450.00 4,500.00
Good Lumber, 2x2x12 piece 20 325.00 6,500.00
Common Wire Nail, 3" kilo 5 100.00 500.00
Common Wire Nail, 1" kilo 5 100.00 500.00

B. LABOR COST
3 days skilled worker pax 2 500.00 3,000.00
3 days laborer pax 1 400.00 1,200.00
TOTAL MATERIAL COST 12,000.00

TOTAL PROJECT COST 16,200.00

Prepared by:

ALBERT A. GIL
ADA III

Approved by:

MAYBELLE V. RUBIO
School Principal II
PROGRAM OF WORK
June 21, 2023

PROJECT TITLE Floor Tiles


Minimum Required Manpower
ITEMS/ DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
A. HARDWARE
Sand cu.m. 1 2,800.00 2,800.00
Cement bags 25 290.00 7,250.00
Tiles pc 80 240.00 19,200.00
tile adhesive pc 5 380.00 1,900.00
tile grout white pc 1 250.00 250.00
tile grout bblack pc 1 250.00 250.00

B. LABOR COST
5 days skilled worker pax 3 700.00 10,500.00
5 days laborer pax 3 450.00 6,750.00
TOTAL MATERIAL COST 31,650.00

TOTAL PROJECT COST 48,900.00

Prepared by:

MARY GRACE A. TUPLANO


Teacher II