GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN M.METERS


UNLESS NOTED OTHERWISE
2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATIONS.
3. CHARACTERISTIC CUBE STRENGTH OF REINFORCED CONCRETE
AFTER 28 DAYS IS 35MPa WITH MINIMUM CEMENT CONTENT
400 Kg/m 3 .
4. CHARACTERISTIC CUBE STRENGTH OF PLAIN CONCRETE AFTER
28 DAYS IS 20MPa WITH MINIMUM CEMENT CONTENT 250 Kg/m 3.
5. YIELD STRENGTH OF REINFORCED BARS IS 420 N/mm2.
6. THE CLEAR COVER FOR REINFORCEMENT SHALL BE
AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:
a. -- FOUNDATION COVER= 70 mm
b. --WALLS 50 mm

G F E J 7.
c.
d.
-- COLUMNS
-- BEAMS AND SLABS
30 mm
25 mm
FOUNDATIONS ARE DESIGNED BASED ON BEARING
CAPACITY IS 300 kPa AS PER GEOTECHNICAL REPORT
8. ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT SHOULD BE
IMPLEMENTED.
48000 9. SOIL BELOW FOUNDATION (FORMATION LEVEL) TO BE COMPACTED
UP TO 95%.
10. ALL FIXATION DETAILS AND EMBEDDED PARTS SHOULD BE
COORDINATED WITH FINAL SUPPLIER DRAWINGS.
203
11. SPLICE LENGTH CALCULATED AS PER ECP 2020 4-2-5-4-1 / C&D
14200 1200 32600 12. BAR BENDING RADIUS CALCULATED AS PER DETAILS CODE 2001 203
3-3

8550 5650 500 30960 2840

1200 7100 800 5100 28480 570 2290 300


480 480
700

R.C WALL 500mm


Started from level 74.43
TO level 79.03

FC1* C3 FC1*
Starting at level (74.43) planted on Starting at level (74.43) Starting at level (75.43)
pier planted on pier planted on pier

Slab Thickness 300 mm ( +75.430)


T.O.C(+75.43)
(+74.43) Slab Thickness 250 mm Slab Thickness 700 mm
T.O.C(+74.43) T.O.C(+74.43)
1400 Slab Thickness 300 mm
B.O.C(+75.13)
Slab Thickness 250 mm ( +73.73)
B.O.C(+74.18) Slab Thickness 700 mm CONSTRUCTION JOINT CONSTRUCTION JOINT
B.O.C(+73.73) 9350
8650

°
170.00 R.C RAFT 900mm thickness
7950

T.O.C(+68.31)
(+68.31)

14570

900
(+65.78)
2530

R.C RAFT 900mm thickness


Kicker & Water stop T.O.C(+65.78)
900

21650 14350 12000 REFERENCE DRAWINGS:


DOCUMENT NO. DOCUMENT TITLE REV.

7350 5650 30960 2840

G F E J

Hydro . Envir & Infra str . Studies

‫سا‬

Wall elevation - wall NO 01


Concrete Dimension PS (04)

Number of walls =13


00 FIRST ISSUE FOR APPROVAL/FOR CONSTRUCTION

PS04 - PUMP HOUSE N.T.S


Wall Concrete dimension -NO 01
2/30
1053-SHD-PUS-CO-005314 00