You are on page 1of 2

1.

Calculation of Top Water Level (TWL)


TWL = platform level (PL) + building height + 3m water tank height
Node Remark PL TWL

A Block A (5 Storey) 43.00 64.00

A Block C (5 Storey) 44.00 65.00

A Cafeteria 45.20 53.70

B Block E (5 Storey) 43.50 64.50

C Block G (5 Storey) 44.00 65.00

D Block H (5 Storey) 45.00 66.00

D Admin Building 44.00 52.50

E Block F (5 Storey) 46.00 67.00

F Block B (5 Storey) 48.00 69.00

F Block D (5 Storey) 47.00 68.00


Assume:
1 unit of block building height = 18 m
1 unit of cafetaria height = 5.5 m
1 unit of admin building height = 5.5 m

2. Calculation of Residual Heads


Residual head = EL + H - TWL
Node EL TWL RH RH>7.6
hf H=H -h 0 f

A 44.0 -0.79045 58.29045 65.00 37.29045 Yes

B 43.5 -0.8095 58.3095 64.50 37.3095 Yes

C 44.0 -0.41425 57.91425 65.00 36.91425 Yes

D 45.0 0.8072 56.6928 66.00 35.6928 Yes

E 46.0 0.80225 56.69775 67.00 35.69775 Yes

F 48.0 0.4793 57.02070 69.00 36.0207 Yes

Assume:
H = 60 m
res

TWL = 65 m
BWL = 60 m
H = (H + (TWL-BWL)/2)
0 res

H = (H + (65 - 60)/2)
0 res

= 57.5 m

You might also like