Group Assessor:
3. Only
trained manpower shall be
engaged for bar bending /
cuttting works
4. Bar
Manual
cutting / bending capacity shall
Cutting & Bending of handling ,hitting by
1 R Injury to persons 1 5 5 25 M be marked on the machines to 1 2 1 2 A
Reinforcement flying object. Injury
safe works
to persons.
5.
Only required reinforcement to
be stacked properly around the
machine to avoid sliping,
tripping and falling hazards.
4. Proper
compacted ground shall be
ensured before erection of
foamwork.
Working on ,
8 Besides and near R H 2. Only defined 1 5 5 25 L
live traffic road median opening follow
* Low Back
ache, Neck,
10 Awkward lifting, L A
Manual Lifting R shoulder and 1 5 5 25 1 5 1 5
Excessive load
body pain, early
fatigue
c)
Minimise material handling.
1 5 5 25
11 Use of grinding *Rotating grinding s L *Proper guarding to be
1 5 1 5 A
machine *Injury provided.
*Injury to eye 1 5 5 25 *Use of proper PPE's.
*flying particles. from flying L 1 5 1 5 A
particles.
*Unauthorized *Effecting the 1 5 5 25 *Only authorized person
operation of performanance should operate the
of the work L machine. 1 5 1 5 A
machine by
person.
*Electrical connecti *Electric shock 1 10 5 50 H *Properly Earthed. 1 10 1 10 L
1 5 5 25 *Uses of ears Muffs/pluges.
*Noise. L *Periodica measurement of 1 2 5 10 L
*Hearing loss Noise.
*Safe access of Crane &
Vehicles.
* Temporary
barrication.
* Movement of * obstruction of
12 *Injury to L A
Crane & Heavy equipments with 1 5 5 25 1 5 1 5
workers *Area should be free from
Equipments personnel
any water logging.
a) 3 core double
insulated cables
b) industrial plugs
Electric cables, and sockets
15 Temperory Site *Shock H L
R switches, plugs, 1 10 5 50 c) Earthing 1 10 1 10
Electrification *Burn injury
distribution box and ELCBs. Earthing from
net work of earthing stations
c) Wire to be inspected
once a week
Failure of boom *Injury a) Inspect boom once a
*Delay to week for damages if any
the activities b) Lift
only SWL
2 2 5 20 L c) Ensure that the 1 2 1 2 A
area is barricaded and
personnel kept away
d)Limit
switches to be in place
Malfunctioning of *Injury to Ensure that brakes, limit
crane / hydra workers * switch, boom alarm, swing
(overloading and Property horn and overhoist and safe
or working beyond Damage * load indicators are working
limits) Delay to the properly.
3 2 10 60 H 3 2 1 6 A
activity a) Trained
operator
b) Isolation of area
c)
Preventive maintainence
Misunderstanding *injury Operation should be carried
between operator *delay to out with authorised
and signal man the activities signalmen only.
(Lack of 1 5 5 25 L a) Training of 1 2 1 2 A
communication) signalman
b) Isolation of area
Project Manager :
ITD CEMENTATION INDIA LIMITED
INTEGRATED MANAGEMENT SYSTEM PROCEDURES
RECORD R-1/22 :RISK ASSESSMENT FORM
Shifting of the
Slip of man/Fall of Movement of path is to be free from any
dismantled materials Get Injury/Fatality
materials obstruction
to a designated place
1. Bar bending / cutting machines shall be
proper tested and calibrated before put it in used
at site.
Swing movements
Injury to Proper supports of sleepers to be given in jacks
of concrete pump 1 5 5 25 1 5 1 5 A
personals of pumps & boom.
boom.
*Injury to persons
Reversing of transit Provision of banks man / helper and installation
*Damage to 1 5 10 50 1 5 1 5 A
mixer of reverse horn while reversing Transit mixer.
properties
Accumulation of
flammable waste,
b) Stacking of
oily rages, cut pieces
*Chances of fire material
of rebar, improper 1 10 10 100 1 10 1 10 L
*Injury to persons
stacking of materials
like tremmie pipes,
hand tools etc.
6 Housekeeping R NA NA NA NL Unacceptable NIL SHOP-17
c) Clear walkways
d) Earmark No Smoking/
Smoking Area
Inadequate Provide adequate illumination in and around the
illumination job site, office areas etc. Always be careful to
*Trip & Fall. 2 5 5 50 2 5 1 10 L
obstruction near keep all the passage ways, gangways,walkways,
working area. fire points etc free from any obstruction.