MATERIAL SUBMITTAL LOG

ACTUAL SUBMITETD ACTUAL RECEIVED DATE FORECAST DATE


PLANNED ANTICIPATED APPROVED DATE LEAD TIME BY WEEK
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF ORGIN SPECIFIED MANUFACTURER / LOCAL SUPPLIER STATUS ANTICIPATED LPO DATE DISPATCH DATE PLANNED DELIVERY DATE
SUBMISSION DATE DATE (AFTER APPROVALS)

ELECTRICAL
SHORT LEAD ITEMS
1 GAC-7878-MAS-E-01 TS ELE 0 PVC CONDUIT & ACCESSORIES Yes Malaysia Lanric 10-Mar-20 23-Apr-20 27-Nov-19 11-Dec-20 B 26-Apr-20 1 WEEKS 1-May-20 Partially / as per site condition

2 GAC-7878-MAS-E-02 MAS ELE 0 GI CONDUITS AND ACCESSORIES Yes Malaysia Lanric 10-Mar-20 13-May-20 22-Apr-20 30-Apr-20 B 16-May-20 4 WEEKS as per site condition

3 GAC-7878-MAS-E-04 TS ELE 0 G I BACK BOX Yes Malaysia Lanric 10-Mar-20 23-Apr-20 14-Dec-19 23-Dec-19 B 26-Apr-20 as per site codition

0 GI TRUNKING, CABLE TRAYS AND LADDERS 2-Apr-20 6-Apr-20 26-Apr-20 as per site codition
4 GAC-7878-MAS-E-06 MAS ELE Yes Malaysia Lanric 1-Apr-20 23-Apr-20 B
1 GI TRUNKING, CABLE TRAYS AND LADDERS 21-Apr-20 30-Apr-20

0 SINGLE/MULTI CORE WIRING & POWER CABLES 11-May-20 27-May-20

5 GAC-7878-MAS-E-07 MAS ELE 1 SINGLE/MULTI CORE WIRING & POWER CABLES Yes UAE Ducab 25-Jun-20 22-Jul-20 19-Jul-20 25-Jul-20 B 25-Jul-20 6 WEEKS 5-Sep-20 as per site codition

2 SINGLE/MULTI CORE WIRING & POWER CABLES 18-Aug-20 27-Aug-20

6 GAC-7878-MAS-E-08 MAS ELE 0 CABLE GLANDS, LUGS AND TERMINALS Yes UK BICC 15-Jul-20 11-Aug-20 15-Jul-20 24-Aug-20 B 14-Aug-20 5 WEEKS 18-Sep-20 15 days after LPO

7 GAC-7878-MAS-E-09 MAS ELE 0 CABLE TIES AND CLAMPS Yes UK BICC 15-Jul-20 11-Aug-20 4-Oct-20 UR 14-Aug-20 15 days after LPO

0 FLOOR BOXES 15-Jul-20 20-Aug-20


8 GAC-7878-MAS-E-10 MAS ELE no UK MK 15-Jun-20 12-Jul-20 UR 15-Jul-20 6 weeks 26-Aug-20 2-Sep-20
1 FLOOR BOXES 4-Oct-20

9 GAC-7878-MAS-E-11 MAS ELE 0 AVIATION WARNING LIGHTS no UK Cooper 15-Aug-20 5-Sep-20 19-Jul-20 4-Aug-20 B 8-Sep-20 6 weeks 20-Oct-20 27-Oct-20

10 GAC-7878-MAS-E-12 MAS ELE 0 DISABLE TOILET ALARM SYSTEM no TBC TBC 15-Mar-20 5-Apr-20 21-Sep-20 9-Oct-20 C 8-Apr-20 30days after LPO

11 GAC-7878-MAS-E-13 TS ELE 0 SURGE AND SUPPRESSORS no UK Wallis 26-Apr-20 17-May-20 20-May-20 as per site codition
WIRING ACCESSORIES (RJ45 SOCKETS TO BE PROVIDED BY THE STRUCTURED CABLING
0 SUPPLIER) Yes UK MK 22-Jun-20 5-Jul-20 10-Jul-20 30days after LPO
12 GAC-7878-MAS-E-18 MAS ELE 10-Jun-20 7-Jul-20 B
WIRING ACCESSORIES (RJ45 SOCKETS TO BE PROVIDED BY THE STRUCTURED CABLING
1 SUPPLIER) Yes UK MK 7-Jul-20 20-Jul-20

13 GAC-7878-MAS-E-19 MAS ELE 0 ISOLATING SWITCHES / EMERGENCY STOPS / FIRE RATED ISOLATORS Yes Switzerland ABB 25-Oct-20 15-Nov-20 18-Nov-20 8 weeks 13-Jan-21 20-Jan-21

0 EARTHING SYSTEM & LIGHTING PROTECTION SYSTEM 21-Nov-19 11-Dec-19

1 EARTHING SYSTEM & LIGHTING PROTECTION SYSTEM 14-Dec-19 22-Dec-19

14 GAC-7878-MAS-E-22 TS ELE 2 EARTHING SYSTEM & LIGHTING PROTECTION SYSTEM Yes UK Wallis 2-Jan-20 15-Jan-20 23-Dec-19 25-Dec-19 B 18-Jan-20 6 WEEKS 22-Feb-20 29-Feb-20

3 EARTHING SYSTEM & LIGHTING PROTECTION SYSTEM 29-Dec-19 6-Jan-20

4 EARTHING SYSTEM & LIGHTING PROTECTION SYSTEM 7-Jan-20 8-Jan-20

HVAC
SHORT LEAD ITEMS
0 DX DUCTED SPLIT UNITS 27-Jul-20 6-Aug-20 7-Jul-20 4 WEEKS 4-Aug-20
CHINA TRANE / JUMA AL MAJID
15 GAC-7878-MAS-M-26 MAS HVAC 1 DX DUCTED SPLIT UNITS NO 13-Jun-20 4-Jul-20 27-Aug-20 23-Sep-20 UR

2 DX DUCTED SPLIT UNITS SOUTH KOREA SAMSUNG 4-Oct-20

16 GAC-7878-MAS-M-27 TS HVAC 0 CHILLED WATER CHEMICAL TREATMENT NO UAE METITO / METITO OVERSEAS LTD 26-Dec-20 16-Jan-21 3-Aug-20 26-Aug-20 B 19-Jan-21 2 WEEKS 3-Feb-21

17 GAC-7878-MAS-M-28 MAS HVAC 0 AUTOMATIC AIR VENT NO UK SPIRAX SARCO / TECHNICAL OILFIELD SUPPLIERS CENTER 6-Aug-20 27-Aug-20 5-Aug-20 26-Aug-20 29-Oct-20 C 30-Aug-20 6 WEEKS 11-Oct-20
Volume Control Dampers

Fire/Smoke Dampers (including Motorized)


0 NO UAE AUROVAC / PRIME AIR CONDITIONING INDUSTRIES 1-May-20 2-May-20 30-May-20 25-May-20 4 WEEKS 22-Jun-20
Access Doors

Low Leakage /Shut Off Dampers


18 GAC-7878-MAS-M-29 MAS HVAC 22-May-20 B
Volume Control Dampers

Fire/Smoke Dampers (including Motorized)


1 30-Aug-20 12-Sep-20
Access Doors

Low Leakage /Shut Off Dampers

0 GRILLS AND DIFFUSERS NO UAE 28-May-20 17-Jun-20


19 GAC-7878-MAS-M-33 MAS HVAC BETA / BETA INDUSTRIAL 1-May-20 22-May-20 B 25-May-20 4 WEEKS 22-Jun-20
1 GRILLS AND DIFFUSERS 25-Jun-20 6-Jul-20

0 FLEXIBLE DUCT & CONNECTOR 28-May-20 17-Jun-20


20 GAC-7878-MAS-M-35 MAS HVAC NO TURKEY AFS / BETA INDUSTRIAL 1-May-20 22-May-20 B 25-May-20 2 WEEKS 9-Jun-20
1 FLEXIBLE DUCT 25-Jun-20 2-Jul-20

21 GAC-7878-MAS-M-36 MAS HVAC 0 CHILLED WATER BLACK STEEL PIPES YES INDIA SURYA / APEX TRADING 26-May-20 16-Jun-20 7-Jul-20 6-Aug-20 B 19-Jun-20 4 WEEKS 17-Jul-20

22 GAC-7878-MAS-M-37 MAS HVAC 0 CHILLED WATER PIPE FITTINGS-50MM & BELOW (M.I) YES THAILAND BIS / APEX TRADING 26-May-20 16-Jun-20 7-Jul-20 6-Aug-20 B 19-Jun-20 2 WEEKS 4-Jul-20

0 CHILLED WATER PIPE FITTINGS-65MM & ABOVE (M.S) THAILAND BIS / APEX TRADING 19-Jul-20 6-Aug-20 19-Jun-20 2 WEEKS 4-Jul-20
23 GAC-7878-MAS-M-38 MAS HVAC YES 16-Jun-20 29-Oct-20 C
1 CHILLED WATER PIPE FITTINGS-65MM & ABOVE (M.S) THAILAND BKL 26-May-20 22-Sep-20 27-Sep-20

24 GAC-7878-MAS-M-39 MAS HVAC 0 THERMOMETER/GUAGES Yes CHAINA WINTERS / APEX TRADING 26-May-20 16-Jun-20 18-Jul-20 26-Aug-20 B 19-Jun-20 6 WEEKS 31-Jul-20

0 NORMAL GI DUCT 2-May-20 16-May-20


Yes INDIA JINDAL / LOUJIEN AIR CONDITIONING EQUIPMENT 1-May-20 25-May-20 1 WEEK 1-Jun-20
25 GAC-7878-MAS-M-40 MAS HVAC 1 NORMAL GI DUCT 22-May-20 15-Jul-20 26-Aug-20 B

2 NORMAL GI DUCT 22-Sep-20 13-Oct-20

0 FIRE RATED DUCT - GI 2-May-20 18-May-20


26 GAC-7878-MAS-M-41 TS HVAC Yes UAE FIRE SAFE / SEAGULL HVAC INDUSTRY L.L.C 15-May-20 5-Jun-20 B 8-Jun-20 2 WEEKS 23-Jun-20
1 FIRE RATED DUCT - GI 7-Jun-20 21-Jul-20

0 KITCHEN EXTRACT DUCT-MS 2-May-20 14-May-20


27 GAC-7878-MAS-M-42 MAS HVAC Yes UAE GDI / GULF DUCT INDUSTRIES LLC 5-Jun-20 B 8-Jun-20 2 WEEKS 23-Jun-20
1 KITCHEN EXTRACT DUCT-MS 15-May-20 1-Jul-20 6-Jul-20

0 ROCKWOOL INSULATION FOR MS DUCT No UAE FUJAIRAH ROCKWOOL 15-Jul-20 26-Aug-20 19-Jun-20 2 WEEKS 4-Jul-20
28 GAC-7878-MAS-M-43 MAS HVAC 16-Jun-20 UR
1 ROCKWOOL INSULATION FOR MS DUCT Yes KSA SAUDI ROCKWOOL 26-May-20 11-Oct-20

0 CHILLED WATER PIPE INSULATION (INDOOR, RISER & ROOF) Yes UAE K-FLEX / LEGION CORPORATION 2-May-20 16-May-20
29 GAC-7878-MAS-M-44 MAS HVAC 15-Apr-20 6-May-20 B 9-May-20 4 WEEKS 6-Jun-20
1 CHILLED WATER PIPE INSULATION (INDOOR, RISER & ROOF) Yes UAE AEROFOAM 5-Aug-20 26-Aug-20

0 DUCT INSULATION Yes UAE K-FLEX / LEGION CORPORATION 2-May-20 16-May-20


30 GAC-7878-MAS-M-45 MAS HVAC 15-Apr-20 6-May-20 B 9-May-20 2 WEEKS 24-May-20
1 DUCT INSULATION Yes UAE AEROFOAM 5-Aug-20 26-Aug-20

0 ACOUSTIC LINER 2-May-20 16-May-20


9-May-20 2 WEEKS 24-May-20
31 GAC-7878-MAS-M-46 MAS HVAC 1 ACOUSTIC LINER Yes UAE K-FLEX / LEGION CORPORATION 15-Apr-20 6-May-20 30-Jun-20 8-Jul-20 30-Oct-20 C

2 ACOUSTIC LINER 27-Aug-20 17-Sep-20


MATERIAL SUBMITTAL LOG
ACTUAL SUBMITETD ACTUAL RECEIVED DATE FORECAST DATE
PLANNED ANTICIPATED APPROVED DATE LEAD TIME BY WEEK
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF ORGIN SPECIFIED MANUFACTURER / LOCAL SUPPLIER STATUS ANTICIPATED LPO DATE DISPATCH DATE PLANNED DELIVERY DATE
SUBMISSION DATE DATE (AFTER APPROVALS)

32 GAC-7878-MAS-M-47 TS HVAC 0 SOUND ATTENUATORS No UAE SEAGULL / SEAGULL HVAC INDUSTRY L.L.C 15-May-20 5-Jun-20 16-May-20 30-May-20 B 8-Jun-20 4 WEEKS 6-Jul-20

0 DUCT ACCESSORIES (DUCT MATE, CLEAT & CORNER) Yes UAE CRAYFLANGE (AREOVAC) / FOCUS AIR COND. IND. 15-Jul-20 26-Aug-20 19-Jun-20 2 WEEKS 4-Jul-20
33 GAC-7878-MAS-M-48 MAS HVAC 26-May-20 16-Jun-20 B
1 DUCT ACCESSORIES (DUCT MATE, CLEAT & CORNER) CRAYFLANGE (AREOVAC) / FOCUS AIR COND. IND. 22-Sep-20 13-Oct-20

34 GAC-7878-MAS-M-49 MAS HVAC 0 CARBON FILTERS No UAE FILTRAIRE / PRIME AIR CONDITIONING INDUSTRIES 10-Jun-20 1-Jul-20 14-Jun-20 21-Jun-20 B 4-Jul-20 4 WEEKS 1-Aug-20

35 GAC-7878-MAS-M-50 MAS HVAC 0 ALUMINIUM TAPE No UAE ASPEN / FOCUS AIR COND. IND. 1-May-20 22-May-20 15-Jun-20 18-Jun-20 A 25-May-20 1 WEEKS 1-Jun-20

36 GAC-7878-MAS-M-51 MAS HVAC 0 VAPOR BARRIER AND ADHESIVES No UAE NAPCO / LEMINAR AIR CONDITIONING CO LLC 15-May-20 5-Jun-20 28-May-20 17-Jun-20 B 8-Jun-20 2 WEEKS 23-Jun-20

37 GAC-7878-MAS-M-52 MAS HVAC 0 VIBRATION ISOLATORS, EXPANSION FITTINGS No INDIA WEICCO / LEMINAR AIR CONDITIONING CO LLC 1-May-20 22-May-20 25-May-20 4 WEEKS 22-Jun-20

38 GAC-7878-MAS-M-53 MAS HVAC 0 CW PUMPS INERTIA BASE No INDIA WEICCO / LEMINAR AIR CONDITIONING CO LLC 1-May-20 22-May-20 25-May-20 4 WEEKS 22-Jun-20

0 CONCRETE ANCHORS No GERMANY HILITI / HILTI 2-May-20 2-May-20


25-Apr-20 1 WEEK 2-May-20
39 GAC-7878-MAS-M-54 MAS HVAC 1 CONCRETE ANCHORS no EUROPE WURTH 1-Apr-20 22-Apr-20 3-May-20 26-Aug-20 UR

2 CONCRETE ANCHORS no GERMANY HILTI 4-Oct-20

40 GAC-7878-MAS-M-55 MAS HVAC 0 COPPER REFRIGERATION PIPES & INSULATION No USA MUELLER 26-May-20 16-Jun-20 11-Aug-20 26-Aug-20 B 19-Jun-20 2 WEEKS 4-Jul-20

41 GAC-7878-MAS-M-56 MAS HVAC 0 SPECIALIST AGENCIES FOR HVAC COMMISSIONING No SUTTON SUTTON INTERNATIONAL LLC 27-Feb-21 20-Mar-21 23-Mar-21 30-Mar-21
CW PIPE FLEXIBLE CONNECTORS No INDIA WEICCO / LEMINAR AIR CONDITIONING CO LLC 16-Jun-20 22-Sep-20 27-Sep-20 29-Oct-20 C 4 WEEKS
42 GAC-7878-MAS-M-58 MAS HVAC 0 26-May-20 19-Jun-20 17-Jul-20
AUTOMATIC DOSING POT No TBC 20-Nov-20 3-Aug-20 26-Aug-20 B 4 WEEKS
43 GAC-7878-MAS-M-59 MAS HVAC 0 30-Oct-20 23-Nov-20 21-Dec-20

44 GAC-7878-MAS-M-60 MAS HVAC 0 CLADDING No TBC 30-Oct-20 20-Nov-20 15-Jul-20 26-Aug-20 B 23-Nov-20 1 WEEK 30-Nov-20

45 GAC-7878-MAS-M-61 MAS HVAC 0 HVAC LABELS Yes UAE HVAC Labels/Grace Labels & Advertising LLC 30-Oct-20 20-Nov-20 8-Oct-20 UR 23-Nov-20 2 WEEKS 8-Dec-20

0 CHILLED WATER PIPE SUPPORT 21-Jun-20 2-Jul-20


46 GAC-7878-MAS-M-62 MAS HVAC No UAE DIAMOND WALRAVEN 26-May-20 16-Jun-20 B 19-Jun-20 4 WEEKS 17-Jul-20
1 CHILLED WATER PIPE SUPPORT 11-Aug-20 17-Sep-20

47 GAC-7878-MAS-M-64 MAS HVAC 0 TEST POINTS Yes INDIA WEICCO / LEMINAR AIR CONDITIONING CO LLC 30-Oct-20 20-Nov-20 12-Sep-20 5-Oct-20 26-Oct-20 C 23-Nov-20 2 WEEKS 8-Dec-20

48 GAC-7878-MAS-M-123 MAS HVAC 0 PIBCV YES SLOVENIA DANFOSS 30-Jul-20 20-Aug-20 23-Aug-20 8WEEKS 22-Sep-20

PLUMBING
SHORT LEAD ITEMS

0 PPR PIPES AND FITTINGS 1-Jun-20 14-Jun-20


49 GAC-7878-MAS-M-78 MAS PL YES UAE AQUATERRA 15-Apr-20 14-Jun-20 17-Jun-20 4 weeks 25-Jul-20 29-Jul-20

1 PPR PIPES AND FITTINGS 8-Jul-20 4-Aug-20 B

0 PEX PIPE & FITTINGS- COLD AND HOT WATER PIPES DROPERS TO FLIXTRES 1-Jun-20 14-Jun-20
50 GAC-7878-MAS-M-79 MAS PL YES UAE AQUATERRA 20-Apr-20 14-Jun-20 17-Jun-20 4 weeks 25-Jul-20 29-Jul-20

PEX PIPE & FITTINGS- COLD AND HOT WATER PIPES DROPERS TO FLIXTRES 8-Jul-20 4-Aug-20 B

51 GAC-7878-MAS-M-80 TS PL 0 UPVC PIPES AND FITTINGS YES UAE Hepworth 20-Apr-20 14-Jun-20 27-Nov-19 8-Dec-19 B 17-Jun-20 4 weeks 25-Jul-20 29-Jul-20

52 GAC-7878-MAS-M-81 MAS PL 0 RUBBER CLAMPS AND ACCESSORIES YES NETHERLANDS FLAMCO 20-Apr-20 30-Jun-20 11-Jun-20 21-Jun-20 B 3-Jul-20 4 weeks 25-Jul-20 29-Jul-20

53 GAC-7878-MAS-M-82 TS PL 0 HDPE PIPES & FITTING YES UAE Hepworth 28-Apr-20 5-Jul-20 27-Nov-19 8-Dec-19 B 8-Jul-20 4 weeks 25-Dec-20 30-Dec-20

VALVES AND ACCESSORIES 1-Jun-20 22-Jun-20 17-Jun-20 4 weeks 25-Nov-20 29-Nov-20


54 GAC-7878-MAS-M-84 MAS PL 0 YES ITALY VIR 25-May-20 14-Jun-20

VALVES AND ACCESSORIES 17-Aug-20 12-Sep-20 B


INSULAION FOR HOT WATER SUPPLY SYSTEM & CONDENSIVE
0 DRAINAGE SYSTEM 20-Sep-20 28-Sep-20 8-Jul-20 4 weeks 25-Jul-20 29-Jul-20
YES UAE AEROFOAM 15-Jun-20 5-Jul-20 UR
INSULAION FOR HOT WATER SUPPLY SYSTEM & CONDENSIVE
55 GAC-7878-MAS-M-88 MAS PL 1 DRAINAGE SYSTEM 13-Oct-20

STEEL PIPES & FITTINGS FOR NON POTABLE HOT WATER 26-May-20
56 GAC-7878-MAS-M-94 MAS PL 0 BOILER CIRCUIT Yes TBC 5-May-20 29-May-20

57 GAC-7878-MAS-M-96 MAS PL 0 LABELING AND IDENTIFICATION ( SAMPLE SUBMITTAL) Yes TBC 15-Sep-20 30-Sep-20 3-Oct-20 4 weeks 5-Apr-21 10-Apr-21
SPECIAL VALVES FOR PLUMBING SYSTEM
58 GAC-7878-MAS-M-97 MAS PL 0 (PRV, FLOAT VALVE, WHA ETC.) Yes ITALY VIR 21-Jul-20 15-Aug-20 6-Nov-20 18-Aug-20 4 weeks 25-Nov-20 29-Nov-20

59 GAC-7878-MAS-M-98 MAS PL 0 HANGER FASTENERS FOR MEP SERVICES Yes GERMANY WURTH 5-May-20 26-May-20 30-Jun-20 4-Jul-20 B 29-May-20

60 GAC-7878-MAS-M-100 MAS PL 0 DRAINAGE OUTLETS ( RAIN WATER OUTLET, PLANTER DRAINS &ETC.) Yes KSA SAUDI CAST 15-Jun-20 21-Jul-20 13-Jun-20 21-Jun-20 B 24-Jul-20 8 weeks 5-Mar-21 20-Mar-21

UPVC CLASS E PIPES AND FITTINGS FOR PUMPED DRAINAGE &


0 CONDENSATE DRAIANGE PIPE WORKS 1-Jun-20 14-Jun-20
61 GAC-7878-MAS-M-106 MAS PL Yes UAE Hepworth 20-May-20 14-Jun-20 17-Jun-20 4 weeks 25-Jul-20 29-Jul-20

UPVC CLASS E PIPES AND FITTINGS FOR PUMPED DRAINAGE &


1 CONDENSATE DRAIANGE PIPE WORKS 1-Jul-20 6-Jul-20 B

DUTY VALVES FOR PLUMBING SYSTEM ( IV, STRAINER,


62 GAC-7878-MAS-M-108 MAS PL 0 CHECK VALVE, DRV ETC.) Yes ITALY VIR 21-Jul-20 14-Jun-20 17-Aug-20 12-Sep-20 B 17-Jun-20 4 weeks 25-Nov-20 29-Nov-20

MATERIAL SUBMITTAL FOR HDPE PIPES AND FITTINGS FOR


63 GAC-7878-MAS-M-110 MAS PL 0 UNDERGROUND DEWA WATER MAIN INCOMING Yes UAE Hepworth 5-May-20 26-May-20 28-Jun-20 2-Jul-20 B 29-May-20 1 WEEKS 5-Jun-20 5-Jun-20
26-May-20 23-Sep-20 B
64 GAC-7878-MAS-M-114 MAS PL 0 DISINFECTION FOR WATER SUPPLY SYSTEM No TBC 5-May-20 29-May-20 1 WEEKS 5-Jun-20 5-Jun-20

65 GAC-7878-MAS-M-124 MAS PL 0 ACOUSTIC PIPE & FITTINGS Yes POLAND AKATHERM 25-May-20 14-Jun-20 1-Jun-20 14-Jun-20 B 17-Jun-20 1 WEEKS 24-Jun-20 24-Jun-20

66 GAC-7878-MAS-M-116 MAS PL 0 GULLY TRAPES & SAND TRAPS No UAE Hepworth 10-Jun-20 14-Jun-20 1-Jun-20 14-Jun-20 B 17-Jun-20 5 weeks 5-Mar-21 20-Mar-21

FIRE FIGHTING
SHORT LEAD ITEMS
0 SPRINKLER SYSTEM 5-Mar-20 14-Mar-20
67 GAC-7878-MAS-FF-117 MAS FF No UAE NAFFCO / SHEILD 15-Mar-20 5-Apr-20 B 8-Apr-20 6 WEEKS 20-May-20 27-May-20
1 SPRINKLER SYSTEM 25-Apr-20 6-May-20

0 FIRE FIGHTING SYSTEM 5-Mar-20 14-Mar-20

68 GAC-7878-MAS-FF-118 MAS FF 1 FIRE FIGHTING SYSTEM No UAE NAFFCO / SHEILD 15-Mar-20 5-Apr-20 25-Apr-20 6-May-20 26-Oct-20 C 8-Apr-20 6 WEEKS 20-May-20 27-May-20

2 FIRE FIGHTING SYSTEM 16-Aug-20 8-Sep-20

0 FM-200 SYSTEM 16-Aug-20 8-Sep-20 8-Apr-20 6 WEEKS 20-May-20 27-May-20


69 GAC-7878-MAS-FF-120 MAS FF No UAE NAFFCO / SHEILD 15-Mar-20 5-Apr-20 B
1 FM-200 SYSTEM 20-Sep-20 5-Oct-20
MATERIAL SUBMITTAL LOG
ACTUAL SUBMITETD ACTUAL RECEIVED DATE FORECAST DATE
PLANNED ANTICIPATED APPROVED DATE LEAD TIME BY WEEK
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF ORGIN SPECIFIED MANUFACTURER / LOCAL SUPPLIER STATUS ANTICIPATED LPO DATE DISPATCH DATE PLANNED DELIVERY DATE
SUBMISSION DATE DATE (AFTER APPROVALS)

70 GAC-7878-MAS-FF-121 MAS FF 0 FOAM SYSTEM No UAE NAFFCO / SHEILD 15-Mar-20 5-Apr-20 16-Aug-20 8-Sep-20 26-Oct-20 D 8-Apr-20 6 WEEKS 20-May-20 27-May-20

0 MVWS SYSTEM 5-Mar-20 14-Mar-20


15-Mar-20 5-Apr-20 B 8-Apr-20 6 WEEKS 20-May-20 27-May-20
71 GAC-7878-MAS-FF-122 MAS FF 1 MVWS SYSTEM No UAE NAFFCO / SHEILD 25-Apr-20 6-May-20
MATERIAL SUBMITTAL LOG
ACTUAL SUBMITETD ACTUAL RECEIVED DATE FORECAST DATE
PLANNED ANTICIPATED APPROVED DATE LEAD TIME BY WEEK
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF ORGIN SPECIFIED MANUFACTURER / LOCAL SUPPLIER STATUS ANTICIPATED LPO DATE DISPATCH DATE PLANNED DELIVERY DATE
SUBMISSION DATE DATE (AFTER APPROVALS)

FIRE ALARM
SHORT LEAD ITEMS
0 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE 2-Apr-20 6-Apr-20

72 GAC-7878-MAS-FA-130 TS FA 1 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE 15-Mar-20 5-Apr-20 8-Jul-20 4-Aug-20 B 8-Apr-20 12 WEEKS 7-Jul-20 14-Jul-20

2 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE 17-Aug-20 8-Sep-20

0 CENTERAL BATTERY SYSTEM YES SHEILD UK 2-Apr-20 6-Apr-20


73 GAC-7878-MAS-FA-131 TS FA 15-Mar-20 5-Apr-20 C 8-Apr-20 12 WEEKS 7-Jul-20 14-Jul-20
1 CENTERAL BATTERY SYSTEM YES SHEILD UK 8-Jul-20 20-Jul-20

74 GAC-7878-MAS-FA-132 MAS FA 0 FIRE RATED CABLE Yes SHEILD UK 15-Mar-20 5-Apr-20 12-Aug-20 UR 8-Apr-20 08WEEKS 3-Jun-20 10-Jun-20
REMARKS

approved

approved

approved

approved

approved

To be submited

To be submited

Waiting for approval

SUBMITTED

final submission after dewa approval

PARTIAL DELIVERY AS PER SITE


CONDITION
REMARKS

AFTER EQUIP., SELECTION

AFTER EQUIP., SELECTION

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement

Partial Delivery as per site requirement