Professional Documents
Culture Documents
AGENDA
AGENDA
1. Basic Infrastructure:
Space sufficient for Chemical Laboratory and Microbiology Laboratory.
Required Aluminum Partition of coding room, common room, office in charge room and
other renovation according to NABL.
Chemical store Renovation like Glassware, chemical Almirah according to NABL.
Toilet: Nonfunctional
Renovation required for drainage pipe line.
Electrification, power plug according to new advanced equipment’s with proper supply
of Earthing and UPS line
Electrical Transformer required according to load for FOOD and DRUG LAB
DG set required for non-interrupted power supply.
AC Requirement: 05 Nos
Working platform is not appropriate according to laboratory.
Furnitures: Table, chairs, almirah (General and for storing glassware).
Computer set/Laptops: 10 Nos.
Shifting of sample receiving room to ground floor.