COMMENT SHEET TO TECHNICAL SUBMISSION


TRANSMITTAL NO: MEG-T-SCT-RBLP-23-0476 DRAWING TITLE
DRAWING NUMBER REV CATEGORY STATUS
Commissioning Procedure for Capacitor
19FW-00GEN00-T02-0041 A IFI - Bank

Comm’t
No.
OWNER COMMENTS CONTRACTOR RESPONSE
Inside the commissioning procedure, there is no
Organization chart/flow. The control power &
auxiliary power change over test, function test,
relay setting test can be given in Check list
format like these. Which helps to go through
during commission:

Acceptance criterion should be brief for different


2 section.

Protection relay configuration should be


3 mentioned in detail and also the DCS signals to
be checked during commissioning.

Please be noted that the comments by the Owner’s representatives as appeared herein is made pursuant to the obligations of the
Owner's Representative as defined in Clause XX under the EPC Contract dated DD MM YYYY. The review, comment,
inspection, attendance, or approval by the Owner or the Owner's Representative shall not in any way operate to limit, relieve or
reduce the duties, responsibilities, obligations or liabilities of the Contractor Members under the EPC Contract or otherwise.