You are on page 1of 1

SECTION OF SIDE SLOPE AS PER DESIGN 1:2

SUBCONTRACTOR SUBCONTRACTOR DOC. N°


01 31-05-23 FIRST ISSUE DM FT GM
REV DATE ISSUE,SCOPE OF REVISION PREP. CHECK. APP.
OWNER / CLIENT: PROJECT COMPANY:
EPC CONTRACTOR: SUPCONTRACTOR:
PROJECT:
ZULUF WATER TREATMENT PLANT
DRAWING TITLE:
SECTION OF SIDE SLOPE 1:2 AS PER DESIGN
SCALE: PROJECT Nº: DOCUMENT NUMBER: REV: SHEET
1:1200 WT2201 00

You might also like