The document summarizes the company's similar projects over the last 5 years, current projects, and assets. For similar projects, it provides the project name and client, dates, status, and services provided. It lists 7 completed residential and commercial building projects from 2019-2022. For current projects, it outlines 3 ongoing building projects providing construction services from 2018 to present. It also lists the company's construction equipment including welding machines, grinders, drills, cranes, cutters, and hammers that are used for projects.
The document summarizes the company's similar projects over the last 5 years, current projects, and assets. For similar projects, it provides the project name and client, dates, status, and services provided. It lists 7 completed residential and commercial building projects from 2019-2022. For current projects, it outlines 3 ongoing building projects providing construction services from 2018 to present. It also lists the company's construction equipment including welding machines, grinders, drills, cranes, cutters, and hammers that are used for projects.
The document summarizes the company's similar projects over the last 5 years, current projects, and assets. For similar projects, it provides the project name and client, dates, status, and services provided. It lists 7 completed residential and commercial building projects from 2019-2022. For current projects, it outlines 3 ongoing building projects providing construction services from 2018 to present. It also lists the company's construction equipment including welding machines, grinders, drills, cranes, cutters, and hammers that are used for projects.
Project Name and Status of Dates of Services provided/ Company’s role
Client Name project involvement
7 storied Residential New construction of the building
Completed November from beginning to hand over the Building, ROBUST 2019 to June whole project. EPHEMERAL, 2022 Site Visit to verify existing Aftabnagar, Dhaka, drawings and documents. Bangladesh Quality assurance of all construction materials. Final bill preparation and submission of the project. Duplex Residential New construction of the building Completed January 2020 from beginning to hand over the Building at to November whole project. Nimshar , Cumilla , 2020 Site Visit to verify existing Bangladesh drawings and documents. Quality assurance of all construction materials. Final bill preparation and submission of the project. 6 Storied Residential March 2020 Retrofitting construction of the Completed building from beginning to hand Building to May 2021 over the whole project. (Retrofitting Work) Site Visit to verify existing at Feni , Bangladesh drawings and documents. Quality assurance of all construction materials. Final bill preparation and submission of the project. 3 storied office August 2020 New construction of the building Completed from beginning to hand over the building(Retrofitting to December whole project. Work) at Godnail 2020 Site Visit to verify existing Narayanganj , drawings and documents. Bangladesh Quality assurance of all construction materials. Final bill preparation and submission of the project. 2 Storied steel September New construction of the building Completed from beginning to hand over the structure Factory 2020 to whole project. Building at November Site Visit to verify existing Hazibari , Mirpur-1 , 2021 drawings and documents. Dhaka , Bangladesh Quality assurance of all construction materials. Final bill preparation and submission of the project. 2 Storied steel October 2021 New construction of the building Completed Building at Hazibari, to February from beginning to hand over the Mirpur-1 , Dhaka , 2022 whole project. Site Visit to verify existing Bangladesh drawings and documents. Quality assurance of all construction materials. Final bill preparation and submission of the project. 4 Storied residential March 11 , Renovation wor construction of Completed the building from beginning to building renovation 2022 to May hand over the whole project. work 2022 Site Visit to verify existing drawings and documents. Quality assurance of all construction materials.
2. All current projects underway or committed to start:
Project Name and Status of Dates of Services provided/ Company’s role
Client Name project involvement
Construction of the Ongoing March 2023 New construction of the building
PSA plant and to till now from beginning to hand over the whole project. generator shed building Site Visit to verify existing for 11 different district drawings and documents. of Bangladesh under Quality assurance of all UNOPS construction materials. Final bill preparation and submission of the project. Rawshan Villa, 7 New construction of the building Ongoing December from beginning to hand over the storied (1556 Sft) 2018 to till whole project. residential building at now Site Visit to verify existing Madartek , Shabujbag, drawings and documents. Dhaka, Bangladesh Quality assurance of all construction materials. Final bill preparation and submission of the project.
7 storied Residential New construction of the building
Ongoing March 20 from beginning to hand over the Building at Durgapur , 2019 to till whole project. Cumilla , Bangladesh now Site Visit to verify existing drawings and documents. Quality assurance of all construction materials. Final bill preparation and submission of the project. 3 Storied Residential 7th march , New construction of the building Ongoing from beginning to hand over the Building, Chagolnaiya, 2022 to on whole project. Feni going Site Visit to verify existing drawings and documents. Quality assurance of all construction materials. Final bill preparation and submission of the project.
3. Assets
List all assets and plants/machines that are relevant to this projects’ we have:
SL # Machine Quantity (PCS) Type of ownership
1 Welding Machine 10 Pcs Own property 2 7” Grinding Machine 6 Pcs Own property 3 4” Grinding Machine 6 Pcs Own property 4 Magnetic Drill Machine 2 Pcs Own property 5 Stand Drill Machine 1 Pcs Own property 6 Electric over Head Crane 1 Pcs Own property 7 Shear Cutter 2 Pcs Own property 8 Auto Gas cutter set 3 Pcs Own property 9 Gas Cutter set 5 Pcs Own property 10 10 lb. Hammer 4 Pcs Own property 11 4 lb. Hammer 6 Pcs Own property 12 Chain Hoist 2 Pcs Own property 13 Grinding machine 2 Pcs Own property 14 Mixer machine 2 Pcs Own property 15 Steel/wooden shutter L.S Own property 16 Bending machine 2Pcs Own property