1.

Similar Projects during the last 5 years:

Project Name and Status of Dates of Services provided/ Company’s role


Client Name project involvement

7 storied Residential  New construction of the building


Completed November from beginning to hand over the
Building, ROBUST 2019 to June whole project.
EPHEMERAL, 2022  Site Visit to verify existing
Aftabnagar, Dhaka, drawings and documents.
Bangladesh  Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
Duplex Residential  New construction of the building
Completed January 2020 from beginning to hand over the
Building at to November whole project.
Nimshar , Cumilla , 2020  Site Visit to verify existing
Bangladesh drawings and documents.
 Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
6 Storied Residential March 2020  Retrofitting construction of the
Completed building from beginning to hand
Building to May 2021
over the whole project.
(Retrofitting Work)  Site Visit to verify existing
at Feni , Bangladesh drawings and documents.
 Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
3 storied office August 2020  New construction of the building
Completed from beginning to hand over the
building(Retrofitting to December
whole project.
Work) at Godnail 2020  Site Visit to verify existing
Narayanganj , drawings and documents.
Bangladesh  Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
2 Storied steel September  New construction of the building
Completed from beginning to hand over the
structure Factory 2020 to
whole project.
Building at November  Site Visit to verify existing
Hazibari , Mirpur-1 , 2021 drawings and documents.
Dhaka , Bangladesh  Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
2 Storied steel October 2021  New construction of the building
Completed
Building at Hazibari, to February from beginning to hand over the
Mirpur-1 , Dhaka , 2022 whole project.
 Site Visit to verify existing
Bangladesh drawings and documents.
 Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
4 Storied residential March 11 ,  Renovation wor construction of
Completed the building from beginning to
building renovation 2022 to May
hand over the whole project.
work 2022  Site Visit to verify existing
drawings and documents.
 Quality assurance of all
construction materials.

2. All current projects underway or committed to start:

Project Name and Status of Dates of Services provided/ Company’s role


Client Name project involvement

Construction of the Ongoing March 2023  New construction of the building


PSA plant and to till now from beginning to hand over the
whole project.
generator shed building
 Site Visit to verify existing
for 11 different district drawings and documents.
of Bangladesh under  Quality assurance of all
UNOPS construction materials.
 Final bill preparation and
submission of the project.
Rawshan Villa, 7  New construction of the building
Ongoing December from beginning to hand over the
storied (1556 Sft) 2018 to till whole project.
residential building at now  Site Visit to verify existing
Madartek , Shabujbag, drawings and documents.
Dhaka, Bangladesh  Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.

7 storied Residential  New construction of the building


Ongoing March 20 from beginning to hand over the
Building at Durgapur , 2019 to till whole project.
Cumilla , Bangladesh now  Site Visit to verify existing
drawings and documents.
 Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.
3 Storied Residential 7th march ,  New construction of the building
Ongoing from beginning to hand over the
Building, Chagolnaiya, 2022 to on
whole project.
Feni going  Site Visit to verify existing
drawings and documents.
 Quality assurance of all
construction materials.
 Final bill preparation and
submission of the project.

3. Assets

List all assets and plants/machines that are relevant to this projects’ we have:

SL # Machine Quantity (PCS) Type of ownership


1 Welding Machine 10 Pcs Own property
2 7” Grinding Machine 6 Pcs Own property
3 4” Grinding Machine 6 Pcs Own property
4 Magnetic Drill Machine 2 Pcs Own property
5 Stand Drill Machine 1 Pcs Own property
6 Electric over Head Crane 1 Pcs Own property
7 Shear Cutter 2 Pcs Own property
8 Auto Gas cutter set 3 Pcs Own property
9 Gas Cutter set 5 Pcs Own property
10 10 lb. Hammer 4 Pcs Own property
11 4 lb. Hammer 6 Pcs Own property
12 Chain Hoist 2 Pcs Own property
13 Grinding machine 2 Pcs Own property
14 Mixer machine 2 Pcs Own property
15 Steel/wooden shutter L.S Own property
16 Bending machine 2Pcs Own property