Mechanical Maintenance Manual
Mechanical Maintenance Manual
FOR
JLPL/JMM
6.3 ANNEXURE
Note: This doc. is the exclusive property of JLPL, GAIL. Any form of its reproduction/ copy in part or
in full without the written permission of the Management (JLPL,GAIL) is prohibited .
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By Fujh{k.k drkZ / Inspected By
uke / Name uke / Name
inuke / Designation inuke / Designation
Lubrication
4
2
Safety Safety Safety Safety
Sr. No. Parameters (OHSAS)
Adopted Adopted Adopted Adopted
1 Electrical shock
fVIi.kh /Remarks
Inspected By
iqujh{kk fVIi.kh / Review Remarks
Reviewed By
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By Fujh{k.k drkZ / Inspected By
uke / Name uke / Name
Inuke / Designation inuke / Designation
NOTE: AS PER REQUIREMENT FORMAT CAN BE EXPAND TO INCLUDE MORE MOTOR.
Checking of Ventilation /
3
Cooling
4 Lubrication (Greasing)
1. Electric shock
fVIi.kh / Remarks:
GLANDING
CONTACTOR
a) CONTACT CLANING
b) CONNEC. TIGHTNESS
PUSH BUTTON OPERATION
PANEL TERMINAL TIGHTNESS
FUSE TIGHTNESS/CONTINUITY
BREAKER MAINT.
MOTOR FOUNDATION BOLT TIGHTNESS
CABLE CONN. TIGHTNESS
LUBRICATION
PARAMETERS (OHSAS) Safety Adopted Observation
1. Electric Shock
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By………………………. Fujh{k.k drkZ / Inspected By ………
uke / Name ………………………….……………. uke / Name ………………….
Inuke / Designation …………………………….. inuke / Designation ……………
DG No.: RH:
SL.
ACTIVITES OBSERVATION ACTION
NO.
1 GENERAL CLEANING
HEALTHINESS OF
2
ROTATING DIODES / FUSES
CHECKING OF INTERNAL
3
CONNECTIONS
CHECKING OF TIGHTNESS
4 OF OUTGOING POWER
CABLE
CONDITION OF GUARDS ON
5
THE MOVING PARTS
CHECKING OF
6
VENTILATION
CHECKING OF EARTH
7
CONNECTIONS
8 PI VALUE
10 IR Value Phase To Phase R-Y Y-B B-R
11 IR Value Phase to Earth R-N Y-N B-N
INSULATION LEVEL TEST / POLARISATION INDEX
TIME RY YB BR RN YN BN RE YE BE
(Min)
(For PI
value)
1
10
10/ 1
Min
NOTE: Observe PI value of each phase with respect to Earth with all other phases earthed
4 External Damage
PARAMETERS (OHSAS)
Safety Adopted Observations
1. Electric Shock
2.
fVIi.kh / Remarks
SL.
DESCRIPTION of JOB Observation Action
NO.
1 Interlock Checking
4 Relay Testing
1. Electric Shock
fVIi.kh / Remarks
PH – E
RY YB BR
PH – PH
R Y B
POLE TO POLE (WITH BREAKER OPEN)
INTERNAL DAMAGES
PITTING OF CONTACTS
(SPECIFIED THE NO.)
TIGHTNESS OF WIRING
CONNECTIONS
OPERATION OF PROTECTIVE
DEVICES AND CHANGEOVER
CIRCUITS
FUNCTIONAL CHECKS
UPS CLEANING
RECTIFIER CONNECTIONS
INVERTER CONNECTIONS
DC FILTER CONNECTIONS
S O A CONNECTIONS
1.
fVIi.kh / Remarks
NOTE: TAKE CELL VOLT READING UPTO TWO DECIMAL e.g. 2.24V
1. Electrolyte spillage
1. Handling of electrolyte
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By Fujh{k.k drkZ / Inspected By
uke / Name uke / Name
Inuke / Designation inuke / Designation
SR.
DESCRIPTION Observation Action
No.
PHYSICAL INSPECTION OF
1
CHARGER
2 CHARGER CLEANING
TIGHTNESS OF ALL CONTROL
3
CONNECTIONS
TIGHTNESS OF POWER
4
CONNECTIONS:
5 EXTERNAL DAMAGES
1. Electric shock
fVIi.kh / Remarks
SL.
NO. DESCRIPTION OF JOB
Observation Action
1 General Cleaning
5 Fuse tightness
10 Cable IR value
1. Electric Shock
fVIi.kh / Remarks:
Location:
Month………
Sl. No.
Description Of Job
Observation Action
General Cleaning
1
Grounding connections
5
Changeover Circuits
6
(Emergency Lights)
Corrosion Effects
7
Checking of conformity of flame
8
proofness
1. Electric shock
fVIi.kh / Remarks
fVIi.kh Remarks:
Location:
Sl. RECTIFIER 110V/48V/24V
No. Description of Job RECTIFIER 1 RECTIFIER-2
OBSERVATION ACTION OBSERVATION ACTION
1 INPUT VOLTAGE
2 INPUT CURRENT
3 ALARM IF ANY
4 RECTIFIER CLEANING
PHYSICAL
5
INSPECTION
TIGHTNESS OF
6
CONNECTION
PARAMETERS (OHSAS) Safety adopted Observation
1. Electric shock
2.
fVIi.kh / Remarks
NOTE:
1. The information needed is as above, however the arrangement of information may vary
depending up on the requirement of equipment / station.
00
25
50
75
100
Desired Acc:
mA % mm mA %
Actual Error :
Desired Acc: +/- 2 %
% Methane By
% LEL BEFORE AFTER
volume
fVIi.kh / Remarks- Erratic or open Ohms is not acceptable -min 1.2 &2.6 Ohms.
• If resistance of detector is not OK, It is to be rejected and replaced with good detector.
GAP VOLTAGE
Voltage
(mm)
ALARM CHECKING:
DANGER
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: drkZ / Prepared By:
uke / Name: uke / Name:
inuke / Designation : inuke / Designation :
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: fujh{k.k drkZ / Prepared By:
uke / Name:. uke / Name:
inuke / Designation: inuke / Designation:
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: fujh{k.k drkZ / Prepared By:
uke / Name: uke / Name :
inuke / Designation: inuke / Designation:
CALIBRATION OBSERVATION
S/N Standard Value Observed Value Mean Deviation
Input Desired Before After calibration Value
calibration 1 2 3 4
Observed Error :
Permissible Error :
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: fujh{k.k drkZ / Inspected By:
uke / Name: uke / Name:
inuke / Designation: inuke / Designation :
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: drkZ / Done By:
uke / Name: uke / Name:
inuke / Designation: inuke / Designation :
INSTRUMENT NAME:
TAGNO:
SR NO :
RANGE:
MODEL:
FREQUENCY:
TRACEABILITY: INTERNATIONL/NATIONAL
fVIi.kh / Remarks
iqujh{kk fVIi.kh / Review Remarks
iqujh{kk drkZ / Reviewed By: drkZ / Prepared By:.
uke / Name: uke / Name:
inuke / Designation : inuke / Designation:
fVIi.kh Remarks
iqujh{kk fVIi.kh Review Remarks
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
HALF YEARLY PREVENTIVE MAINTENANCE OF EMERGENCY DIESEL ENGINE AND FIRE WATER ENGINE
esaVsusal csl O&M Base Format No. : MM-04
NAME OF EQUIPMENT: fnukad Date
Man Days: RH : MO No. :
Sr.
Activities (QMS) Observation Action Remarks
No.
1 LUBRICATING Check (Change If Required) Engine Oil
Check Engine Lube Filter (If Required).
Record Oil Pressure
2 FUEL SYSTEM Check Fuel Supply
Check Throttle Linkage.
Clean Fuel Tank Breather
3 COOLING Check /Change Coolant
Check Coolant Inhibitor (Add. Coolant
Concentrate, If Reqd).
Record Coolant Temperature.
Hose And Connections.
4 AIR SYSTEM Clean / Change Air Filter System.
Check Air Piping.
OTHER Check Any Leaks And Connections.
5 MAINTENANCE
Check Belts, Adjust If Required.
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
Dz0 la0
Sr. No.
ekunaM Parameters (EMS) Measurable Observation
1 Diesel leak.
2 Coolant Leak
3 Quality of Exhaust
4 Heat Emission
5 Sound emission
6 Lubricants
Dz0 la0
Sr. No.
ekunaM Parameters(OHSAS) Safety adopted Observation
1 Lubricate Handling
2 Sound during test operation
3 Hot surface of engine
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
Concentrate, If Required.
Record coolant Temperature.
4 AIR SYSTEM Clean / Change Crank Case Breather.
Check Air Cleaner Restriction.
Clean / Change If Required.
Check Air Piping.
OTHER
5 Check Any Leaks And Connections.
MAINTENANCE
Check Belts, Adjust If Required.
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN
FUTURE :
5 Piping System.
A) Check For Any Unusual Piping Vibration.
B) Check For Any Leakage At Joints.
C) Check For Any Corrosion / Rusting.
D) Perform Greasing Of All Valves.
E) Check & Repair The Insulation.
5 Check Thermostat setting and test loading.
6 Check For Any Abnormal Noise.
7 Check Gas Pressure & Fill If Required.
8 Check General Condition Of Air Cooled Condenser .
9 Check Bearing Condition Of Compressors. If required.
Check Piston, Piston Rings, And Cylinders & Clearance
Etc.
10 (If Required) And Record It.
A.H.U. : UNIT NOS. :
a Check Bearings And Change As per vibration analysis.
b Check Drive Belts & Belt Tension And Change If Required.
c Clean The Filters.
d Check The End Play.
Check Housing And Wheel For Rust, Accumulation Of Dirt,
Crack Etc. Which May Cause Unbalance And Excessive
e Vibrations, based on vibration analysis.
f Check And Tighten The Mounting Bolts.
g Check The Pulley Condition And Align.
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
SPARES / CONSUMABLES USED
Sr. No. ITEM NAME PART NO. CODE NO. QUANTITY REMARKS
1
Dz0 la0
ekunaM / Parameters (EMS) Measurable Observation
Sr. No.
1 R-22 leakage.
2 Oil leakage
3 Heat Emission
4 Sound emission
Dz0 la0
ekunaM / Parameters(OHSAS) Safety adopted Observation
Sr. No.
1 Lubricate Handling
2 Sound during operation
3 Hot surface of compressor
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
Sr.
ekunaM / Parameters (EMS ) Measurable Observation
No.
1 Diesel leak.
2 Coolant Leak
3 Quality of Exhaust
4 Heat Emission
5 Sound emission
Sr.
ekunaM / Parameters(OHSAS) Safety adopted Observation
No.
1 Lubricate Handling
2 Sound during test operation
3 Hot surface of engine
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
Sr. No. ITEM NAME PART NO. CODE NO. QUANTITY REMARKS
Sr. No. ITEM NAME PART NO. CODE NO. QUANTITY REMARKS
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
RH: MO No. :
Sr. No. ACTIVITIES (QMS) Observation Action REMARKS
1 Replace The Oil Of Bearing Housing.
Check The Bearings Based On Vibration
2
Analysis.
3 Clean The Suction Strainer
4 Check The NRV.
5 Check Foundation Bolts For Tightness.
Carry Out The Complete Overhaul Of Pumps
6 And Check
The Followings.
a) Check Impeller Ring. Replace If Required.
Check Impeller For Any Corrosion / Pitting /
b)
Dents / Cracks. Replace If Required.
c) Check Shaft Sleeve For Any Damage.
d) Check Shaft For Any Cracks / Dents Etc.
Clean All The Components With Spirit /
e)
Kerosene.
Check The Mech.-Seal / Gland Packing
f)
If Required Replace It.
Check Alignment Between Pump & Motor ,
8
Fill Data- Sheet (MM21)
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
Code No.
Available Stock
Consumption of spare
Balance Quantity
Required Quantity
Required Quantity
Shall Last For (YRS)
Additional Information
(If Any)
Remarks
Prepared By
Designation
Date
Review Remarks
Reviewed By
Designation
Date
Note :
(1)Consumption and requirement of spares and consumable shall be reviewed quarterly by HOD(Mech)
(2) Monthly spare consumption shall be prepared for ORM.
Phone No.
Fax No.
E-mail ID
Equipment Name
Model No.
Serial No.
Year Manufacture
PO No.
Date Of Commissioning
Prepared By
Name
Designation
Date
Review Remarks
Reviewed By
Name
Designation
Date
1.1 Sub-system:
Manpower / Machinery
6.0
Used:
3 vfrdze.k / Encroachment
4 mr[kuu / Excavation
utnhd esa dksbZ fodklRed dk;Z /
5
Development activities nearby
ikbiykbZu ekdZjksa dh fLFkfr /
6
Pipeline Markers Status.
LaknfX/k xSl fjlko fLFkfr /
7
Suspected Gas leak conditions
Sr. No. ekunaM / Parameters (EMS) Measurable Observation
1 Sound Bearable/ unbearable
Sr. No. ekunaM / Parameters (OHSAS) Safety Adopted Observation
1
2
fVIi.kh Remarks
iqujh{kk fVIi.kh Review Remarks
iqujh{kk drkZ Reviewed By : fujh{k.k drkZ Inspected By :
uke Name : uke Name :
inuke Designation : inuke Designation :
dz0 la0
ekunaM Parameters izs{k.k Observation Action Proposed
Sr. No.
dz0 la0
ekunaM Parameters izs’k.k Observation Action Proposed
Sr. No.
1 feVzVh dk dVko A Soil Washout
vfrdze.k dk fujh{k.k
INSPECTION OF ENCROACHMENTS
iz- ,oa vuq- csl O&M Base: Format No. : PM-06
easuVsaUl vkns’k la[;k
Maintenance Order No. : Psusat Chainage: fnukad Date :
dz0 la0
ekunaM Parameters Detail
Sr. No.
1 Date Reported
2 Reported By
3 Date of Site Inspection
4 Details of encroachment fooj.k Description izs’k.k Observation
a) Type of Encroachment
b) Name & Address of Encroacher
c) Village
Encroachment distances from
d) pipeline
5 Action Taken
6 Notice Issued
Sr. No. ekunaM / Parameters (EMS) Measurable Observation
1
2
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation
dz0 la0
ekunaM Parameters Detail
Sr. No.
1 Type of Washout / excavation
2 Cause of washout /excavation
Washout /excavation distance
3
from Pipeline
4 Extent of Damage
a) Length
b) Width
c) Depth
5 Action Taken
Dz0 la0
ekunaM / Parameters (EMS) Measurable Observation
Sr. No.
LPG Leakage
1
(Any due to damage to pipeline)
2 Land degradation
3
Dz0 la0
ekunaM / Parameters (OHSAS) Safety Adopted Observation
Sr. No.
1
2
3
fVIi.kh Remarks :
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
dz0 la0
ekunaM / Parameters DETAIL
Sr. No.
1 Date Reported
2 Reported By
3 Cause of pipeline exposure
4 Any damage to coating
5 Extent of damage
a) Length
b) Width
c) Depth
6 Action Taken
Dz0 la0
ekunaM / Parameters (EMS) Measurable Observation
Sr. No.
1
2
3
Dz0 la0
ekunaM / Parameters (OHSAS) Safety Adopted Observation
Sr. No.
1
2
3
fVIi.kh Remarks
iqujh{kk fVIi.kh Review Remarks
iqujh{kk drkZ Reviewed By fujh{k.k drkZ Inspected By
uke Name uke Name
inuke Designation inuke Designation
Type of PIG
launched (with
specification)
Average
Pig speed
km/hr
Condition of
the pig when
received
Debris received
with pig (kg)
Major
Observations
Preventive
action taken
S.
ACTIVITY STATUS OBSERVATION REMARKS
No.
Check Oil leakage from
1
HPU and Actuator
ELECTRICAL SYSTEM
S.No. ACTIVITY STATUS/VALUE OBSERVATION REMARKS
8 Check Inverter/Converter
10 Check PSP at SV
11
GENERAL INSTRUMENT-STATUS
TELECOM/SCADA
S. No. ACTIVITY STATUS OBSERVATION REMARKS
Check DC/DC converter Voltage
1
(RTU)
Check DC/DC converter voltage
2
(Telecom)
3 Check Telephones at SV
4 Check Telephone list
5
SAFETY AND SECURITY STATUS
BUILDING STATUS
S. No. ACTIVITY STATUS OBSERVATION REMARKS
11
GENERAL STATUS
S.No. ACTIVITY STATUS OBSERVATION REMARKS
10
Note:
OBSERVED BY
CHECKED BY REVIEWED BY
SIGNATURE
SIGNATURE SIGNATURE
NAME DESIGNATION
NAME DESIGNATION NAME DESIGNATION
DATE:
DATE: DATE:
fVIi.kh Remarks
iqujh{kk fVIi.kh Review Remarks
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
1
2
SPARES / CONSUMABLES USED
Sr. No. ITEM NAME PART NO. CODE NO. QUANTITY
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
Dz0 la0
ekunaM / Parameters (EMS) Measurable Observation
Sr. No.
1 LPG Vent for isolation of equipment.
2 Water consumed for F&S
3 Waste material.
4 Grease, kerosene, etc
Dz0 la0
ekunaM / Parameters (OHSAS) Safety Adopted Observation
Sr. No.
1 LPG Vapor/liquid handling
LIST HERE-UNDER ANY EXTRA WORK PERFORMED OR WHICH MAY WARRANT ATTENTION IN FUTURE :
SPARES / CONSUMABLES USED
Sr. No. ITEM NAME PART NO. CODE NO. QUANTITY REMARKS
fVIi.kh Remarks
iqujh{kk fVIi.kh Review Remarks
iqujh{kk drkZ Reviewed By: fujh{k.k drkZ Inspected By:
uke Name : uke Name :
inuke Designation : inuke Designation :
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By: Fujh{k.k drkZ Inspected By :
uke Name : uke Name :
inuke Designation: inuke Designation:
dsifVo ikoj iz.kkyh vkSj mlds lgk;d midj.kks dh ekWuhVfjax ,oa vuqj{k.k
MONITORING & MAINTENANCE OF CAPTIVE POWER SYSTEM AND ASSOCIATED
EQUIPMENT.
esaVsusal csl O&M Base: Format No. : PM-17
ikbi ykbu [k.M Pipeline Section: fnukad Date :-
LFky dk uke ,oa Øe lñ Name and Number of location SV/ IP / TOT No. :
Sl. Sl.
No. EQUIPMENT /SYSTEM OBSERVATION No. EQUIPMENT /SYSTEM OBSERVATION
1 DCDB 4 DC-DC Converter
a Incomer voltage Volts Telecom /SCADA
b Incomer current amps a Output voltage volts
c Indication lamps b Output current amps
d Battery Bank #1 Voltage Volts RTU
e Battery Bank #1 Current amps a Output voltage volts
f Battery Bank #2 Voltage amps b Output current amps
g Battery Bank #2 Current amps CP System
h Telecom /SCADA feeder current amps a Output voltage volts
i RTU feeder current amps b Output current amps
j CPPSM feeder current amps
5
k lighting /inverter feeder current amps Fire Alarm Panel
l Fire alarm panel feeder current amps a Mode AUTO /Manual
m HPU /MOV feeder current amps b CO2 cylinder system Main /Standby
n HPU /MOV feeder current amps c Status of zone(s)
o HPU /MOV feeder current amps Indicates if any one is isolated
p HPU /MOV feeder current amps 6 Pressure of
a Pilot cylinder( Elect Room) kg/cm2
2 Anode Lead Junction Box
b Pilot cylinder(SCADA Room) kg/cm2
a Physical condition c Pilot cylinder(Battery Room) kg/cm2
Vegetation
7 Lighting System & Exhaust Fans
b (if vegetation is there clear it)
c Condition of ground Location Lights Exhaust Fans
a Battery Room
3 Housekeeping
b Tel/SCADA Room
a TEG area c Equipment Room
b Equipment Room d Security Room
c Battery Room
e Switches
d Telecom /SCADA Room
fVIi.kh Remarks:
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By Fujh{k.k drkZ Inspected By
uke Name : uke Name :
Inuke Designation : inuke Designation :
fVIi.kh Remarks:
10
11
12
13
14
15
16
Electrical (Earth resistance to be measured by 3-pin wenner method)
fVIi.kh Remarks:
Shunt Shunt
Anode Current Resistance Anode Current Resistance
Measurement Measurement
No. (mA) (Ohms) No. (mA) (Ohms)
(mV) (mV)
1 ----
2 ----
fVIi.kh Remarks :
iqujh{kk fVIi.kh Review Remarks:
iqujh{kk drkZ Reviewed By fujh{k.k drkZ / Inspected By
uke Name : uke Name :
Inuke Designation : inuke Designation:
1.1 SUB-SYSTEM:
DATE OF
4.0 OBSERVATION/OCCURRENCE:
5.0 ACTION DETAILS:
Dz0 la0
ekunaM / Parameters (EMS) Measurable Observation
Sr. No.
fVIi.kh Remarks:
ckmaMjh ihyj
Boundary Pillar
ih ,y MCyw
cksMZ
P.L.W Sign
Board
vks ,Q lh ekdZkj
OFC Marker
ds ,e ekdkZj KM
Marker
Vh ,y ih LVs’ku
TLP Station
MkbjsD’ku ekdZj
Directional
Marker
fooj.k
Ekk=k fLFkfr Description dk;Zokgh
vkbZVe Condition Compliance
Qty. (Size & Action Taken
Item (OK/NOT OK) Status
(No.) Type)
dVko o mr[kuu
P/L Washout/
Excavation
jksM+ dzksflax
Road Crossing
jsy dzksflax Rail
Crossing
unh dkzsflax
River Crossing
vfrdze.k
Encroachment
Remark fVIi.kh %
Review Remark iqujh{kk fVIi.kh %
iqujh{kk drkZ Reviewed By % fujh{k.k drkZ Inspected By :
uke Name : uke Name :
inuke Designation : inuke Designation :
1 23 1 23
2 24 2 24
3 25 3 25
4 26 4 26
5 27 5 27
6 28 6 28
7 29 7 29
8 30 8 30
9 31 9 31
10 32 10 32
11 33 11 33
12 34 12 34
13 35 13 35
14 36 14 36
15 37 15 37
16 38 16 38
17 39 17 39
18 40 18 40
19 41 19 41
20 20
STATION
DESCRIPTION STATUS
SL. JURISDICTION/ NO. DATE OF REMARKS/
OF THE OF
No. STATION (TS/SV ALARM PROBABLE CAUSE
ALARM ALARM
NO.)
STATION
DESCRIPTION STATUS
SL. JURISDICTION/ NO. DATE OF REMARKS/
OF THE OF
No. STATION (TS/SV ALARM PROBABLE CAUSE
ALARM ALARM
NO.)
STATION
DESCRIPTION STATUS
SL. JURISDICTION/ NO. DATE OF REMARKS/
OF THE OF
No. STATION (TS/SV ALARM PROBABLE CAUSE
ALARM ALARM
NO.)
fVIi.kh Remarks :