You are on page 1of 1

VI-SOP-O&M-02

VI-IMSP-O&M-01-F02
JBS ENTERPRISES PVT LTD
First Floor, Bella vista, Oswal
TEST REPORT Park, Pokhran Rd. No. 2,
Site: Terralight Solar Energy Sitamau Thane(W)-400 601
SS Pvt. Ltd.(TSESSSPL) 26/03/23
DATE OF TESTING TO
33 KV BUSBAR 28/03/23
SHEET Page 1 of 1

TEST REPORT OF 33 KV BUSBAR


1. Maintenance Checklist of Lighting Arrestor:
Preventive Maintenance Of 33 Kv Busbar
Location: 33 kv Indoor Panel
Observation Remarks
Sr Description
No R- Phase Y - Phase B - Phase

1 External cleaning of insulator. Done Done Done


2 Visual inspection for damage & defects of insulator. Done Done Done

3 Connection tightness check. Done Done Done


4 Heater wiring tightness checked Done Done Done
5 Check the cable glanding , supporting, clamping Done Done Done
6 Body Earth strip connection healthiness. Done Done Done
7 Circuit Checking & Connection Tightness Done Done Done
8 Checking, Cleaning & Hole sealing. Done Done Done
9 Insulation Resistance Measurement of Busbar Done Done Done

2. Insulation Resistance Measurement:

I.R. value
Particular Applied Voltage
R Phase Y Phase B Phase
33 KV BUS A (Feeder 1 TO 5) 5000 Volt DC > 1TΩ > 1TΩ > 1TΩ
33 KV BUS B (Feeder 6 TO 10) 5000 Volt DC 709 GΩ 810 GΩ > 1TΩ
33 KV BUS C (Feeder 11 TO 14) 5000 Volt DC 806 GΩ > 1TΩ > 1TΩ

3. Remarks: Test results are found satisfactory.

TESTED BY: WITNESSED BY: Client Rep.:


Mr. DINESH MENDHE JBS ENTERPRISES PVT. LTD. TERRALIGHT SOLAR ENERGY SITAMAU SS PVT. LTD.
(TSESSSPL)
Prepared BY:
Mr. ARVIND KUMAR