OPERATIONAL CONTROL PROCEDURE OCP No

Date :

ACTIVITY: Handling of Waste Concrete

Project : Location :

Sub-Contractor: Nature of

work:
Sl. Performed Checked
No. Controls
by by
1 Waste concrete should not be dumped on ground..
Waste concrete can be used for making temporary structure or flooring.
2

Waste concrete can be used for making Small slabs, Curbstones or Flower
3
pots, etc
After washing the transit mixer, the washed out sludge / slurry should not be
4
discharged on ground.
The washed out sludge / slurry can be used for making the flooring or
5
collected in a designated area for drying.
The dried out sludge /slurry must be disposed for land refilling with the
6
consent of local authority.

Prepared By : Approved By :

SE / SS : Project Manager :

Date : Date :