Work Method Statement T.decking

This document outlines the proposed method for constructing a picnic deck using hollow composite timber decking. It will include reinforced concrete foundations, columns, slab, and aluminum battens and angles to support the decking. The contractor will excavate the site, lay and compact crushed stone and concrete, erect formwork and pour concrete for the structure. They will then install the timber decking as approved by the site supervisor or client. The contractor is responsible for protecting materials, keeping the site clean and tidy, and adhering to safety procedures during the works.

Uploaded by

bendang makmur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
704 views2 pages

Work Method Statement T.decking

This document outlines the proposed method for constructing a picnic deck using hollow composite timber decking. It will include reinforced concrete foundations, columns, slab, and aluminum battens and angles to support the decking. The contractor will excavate the site, lay and compact crushed stone and concrete, erect formwork and pour concrete for the structure. They will then install the timber decking as approved by the site supervisor or client. The contractor is responsible for protecting materials, keeping the site clean and tidy, and adhering to safety procedures during the works.

Uploaded by

bendang makmur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • General: Outlines the general method and purpose of constructing a proposed picnic deck, detailing the construction specifications.
  • Site Responsibility: Specifies the responsibilities for site preparation, material management, and ensuring compliance with construction requirements.
  • Machinery, Tools, Materials and Equipment: Lists the machinery and materials necessary for the construction process, including excavation tools and measuring equipment.
  • Sequence of Works: Describes the procedural sequence of tasks required for constructing the deck, like excavation, footing, and formwork.

METHOD STATEMENT

PROPOSED WORKS METHOD FOR


CONSTRUCTING OF PICNIC DECK

1) GENERAL

1.1 This work Method Statement is for Proposed Construction of Timber Deck
The Timber Decking shall consist of Wpcc-dh-14530 (ew20) hollow
composite timber deck of size 145mm(w) x 30mm(t) x 2000mm(l) complete
with aluminium batten and 'L' angle.
1.2 All RC Structure to be constructed of min, concrete grade 25 including
foundation, excavation, column, slab, reinforcement, formwork, 50mm lean
concrete,100mm thk crusher run
1.3 BM shall cart away debris to own dump site

2) SITE RESPONSIBILITY
2.1 From start till completion of works

i. Adequate protection of materials delivered


ii. Avoid any damage i.e erosion of slope etc whilst executing works
iii. Upkeep surrounding area in clean and tidy condition
iv. Periodically remove all surphis excavation and waste materials and to
dump at approved site
v. To do proper and accurate setting out of all works to the satisfaction of
SO / Client Representative
vi. BM to adhere all site staff to the safety and environmental procedure.
Enforce by the SO / Client Representative

Bendang Makmur Sdn. Bhd


METHOD STATEMENT

3) MACHINERY , TOOLS , MATERIALS AND EQUIPMENTS

3.1 BM shall provide all machineries, materials, including backhoe , excavator,


lorries and necessaries equipments for the purpose of constructing the Timber
Decking.

4) SEQUENCE OF WORKS

4.1 To do setting out as per location shown in drawing


4.2 To excavate and do well compacted sub grade works upon complete subgrade
works, shall lay 100mm thk crusher run to compaction, before topup 50mm
thk lean concrete
4.3 To erect Footing Steel and column
4.4 Proceed formwork for column until ground level
4.5 To concrete all column
4.8 Proceed formwork for Beam H’
4.9 To concrete all Beam H’
4.10 Proceed formwork for column until Beam v’
4.11 To concrete all Beam V’
4.12 Proceed formwork for for slab
4.13 To concrete all slab
4.14 To lay and install timber deck as per approved by SO/Client Representative

Bendang Makmur Sdn. Bhd

METHOD STATEMENT 
 
Bendang Makmur Sdn. Bhd 
 
 
 
PROPOSED WORKS METHOD FOR 
CONSTRUCTING OF PICNIC DECK 
 
1) GENERAL 
 
1.
METHOD STATEMENT 
 
Bendang Makmur Sdn. Bhd 
 
 
 
3) MACHINERY , TOOLS , MATERIALS AND EQUIPMENTS 
 
3.1 BM shall provide al