Location Of Total Length Unit

Work Bar Dia.(mm) Spacing(mm) Length (m) No (m) Weight(kg/mt)

Main bar pile


foundation 20.00 10.61 4.00 42.42 2.47
Main bar pile
foundation 16.00 10.61 4.00 42.42 1.58
Stirrups 8.000 0.150 9.43 63.833 0.888 0.40

Extra Stirrups 12.000 1.500 9.43 7.283 0.888 0.89

Main bar pile


foundation 20.00 10.45 10.00 104.50 2.47
Stirrups 8.000 0.150 9.43 63.833 1.045 0.40

Extra Stirrups 16.000 1.500 9.43 7.283 1.045 1.58


No of Wastage in 20 mm
Total Qty Wastage bars( 20 Rmt for all steel Wt Wastage
Weight Total Weight Location No of pile of Steel in Rmt mm) pile per Rmt in Kg

Security bld 25 2618.52 1.39 100.00 139.50 2.47 344.44


104.74 104.74
25 1675.85
67.03 67.03
0.35 22.394 25 559.84
25 143.72
0.79 5.749
4997.94
Utility Bld 129 33285.19 1.55 1290.00 1999.50 2.47 4937.04
258.02 258.02
0.41 26.353 129 3399.53
129 1551.53
1.65 12.027
38236.25
% of
Wastage in % of
20 mm bar Wastage
( For all Pile in 20 mm
work) bar only

6.89 13.15

12.91 14.83