Dear Denish Gala,

We are glad to inform you that we have prepared an estimate based on your

requirements.

Preliminary Estimate
Date: 25/02/2023
Project
Work
Type Residential Interiors/Rennovation
Client DENISH GALA
Job No 13Date:25/02/2023
AMOUNT
wORK
8,50,00o
Civil Work
kitchen dado)
(Breaking, Tiling of houseand
T8,70,789
CarpentryWork
(All rooms)
3 73,200
False Ceiling Work
T3,32,925
4 Other extra works
All rooms)
5 Work 1,50,000
Electrical
lights and fan fixtures)
(excluding
6 Electrical
FixturesS T87,000

and cleaning Work (asian paint lustre) T1,30,000


Painting
8 Miscellaneous 50,000
1,00,00o
Architect'sfees

TOTAL 26,43,914

NOTES
Above measurement are reference purpose onlyfinal measurement may vary after the completion
for

and the same may be considered for final


of site bill purpose.

All the Tiles and Granite rates are calculated with base price which has been mention any increase in
Tiles and Granite cost the difference rate will be borne by client.

Suohtam

OHouse_of_bricks houseofbricks19@gmail.com K
Ar. Surbhi Parmar

Contractor- Vaibhav Parmar(9773578538)

A-1, garud society,vidhyalaymarg,bhoir nagar,mulund HOUSE


east, mumbai 400081 OF BRICKS

ELECTRICAL WORK BILL FOR DENISH GALA


ENTRANCE
PASSAGE/ LIVING MASTER KIDS

Sr. No. ITEM PANELLING ROOM DINNING KITCHEN TOILETS BEDROOM BEDROOM TOTAL RATE AMOUNT
37 850 31,450
LIght point
full
half 15 600 9,000
Light point
Fan point 850 3,400
6 AMP sw/soc 500 13,500
16 AMP sw/soc 1200 12,000
6 AC 1200 3,600
2way switch 700 2,100
Led point 3 850 11,050
Led light and
fitting(R.ft)
profile
3 9
17 19 95
22
50
30
4,750
660
Led only fitting

Telephone point 850 1,700


LO 48 200 9,600
Light fitting
Fan 1 400 2,400
fitting
Inverter 0 585 1,170

15 Bell 0 600 600

Footlight
0 850 1,700
TOTAL A 108,680

WIRING IN RUNNING FT
ITEM R.ft RATE AMOUNT
17 Telephone 80 50 4,000
18 TV 25 750
19 Bell 50 22 1,100
20 Led 62 1,364
looping
2.5mm wire 270 50 13,500

22 1.5mm wire 250 40 10,000


1 mm wire 80 25 2,000

Only switch boards

labour(6boards) 2,000
TOTALB 34,714

MCB related work (EXTRA WORK)


ITEM R.ft RATE AMOUNT
5 MCB box fitting 500

MCB 4 Pole 400 400


MCB 2 Pole 150 150
28 MCB 1 Pole 100 900
29 HOME PROTECTOR FITTING 1,000

0 6mm wire 15 112 1,680

1.5mm wire
difference for fire
2 box 800
proor
2.5mm wire
difference for fire
800
32 proof 2box
1mm wire difference

33 for fire box 400


proof
6,630
TOTAL C

ELECTRICAL FIXTURES NO. RATE AMOUNT


Fans 5500 27,500
35
36 COB lights 28 650 18,200

37 Led 4,000
lights and profile pati

38 and other decoraive 7,000


Spot lights lights

39 29,500
Electrical switches and plates

TOTAL D 86,200

FINAL TOTAL A+B+C+D


236,224

houseofbricks19@gmail.com
OHouse_of_bricks
Ar. Surbhi Parmar
Contractor- Vaibhav Parmar(9773578538)

A-1, garud society,vidhyalay marg,bhoir nagar,mulund HOUSE


east, mumbai 400081 OF BRICKS

Sr. Particulars SIZE Area Unit Rate Amount


NO
CIVIL WORK
Breaking, Tiling, Plaster
of kitchen wall to covert into open Kitchen

2
Breaking partial
Precession 19 1,250 24283
8.83 2.2 Sq.Ft
& internal tiling @ 1200/- per Sq.ft

2 New White quartz material platform 10 3.5 35 1070 74900


Kitchen entry gate & framing 15000 15000
for all room @total areas of 1800-2000 sqft
Plastering

(Breaking
Old gypsum coat, New Cement plaster, POP on walls)
35 215 1800 185 332088
(Breaking Coat psqft 8.50 Sq.Ft

Plaster-120 psqft

POP wall40 psqft


Shifting of Bathroom wall 74.00 28 Sq.Ft 1000 28000
6 Tilling work for Bedroom 1internal walls 17.00 8.5 145 715 103318
Tiling work for Bedroom internal walls2 20.00 8.5 170 715 121550
of Bathroom wall to bring Washbasin out of bathroom near 47304
8reaking 5.4 39 Sq.Ft 1,200
7.30
dining area@ 1200/- per Sq.ft
New washbasin work including platform, electrical, plumbing & piping 25000
25000
&Faucets
10 American Standard Washbasin 28000 28000
11 Marble framesfor all doors 11500 46000

TOTALAMOUNT 351442
NOTES
final measurementmay vary afte the completion 1 of site and the same
Above measurement are for referance purpose only

may be considered for hnal bill purpose.


rates are calullated with base has been mention increase in 2 Tiles and Granite cost
All the Tiles and Granite price which any

the difference rate will be born by client.

3 Above rate are Excluding GST